Regulation 19, The Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fees and Charges by State Load Despatch Centre) Regulations, 2011: Operation and Maintenance Expenses
The Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fees and Charges by State Load Despatch Centre) Regulations, 2011 - Regulation 19
Text of regulation 19
Operation and Maintenance Expenses
19. Operation and Maintenance Expenses.- (1) Operation and Maintenance (O&M)
Expenses shall comprise of the following:-
(a) salaries, wages, pension contribution and other employee costs;
(b) administrative and general expenses;
(c) repairs and maintenance expenses;
(d) other miscellaneous expenses, statutory levies and taxes (except corporate
income tax).
1
[(1-a) O&M Norms -
(i) The power system operation company shall propose separate trajectories of
norms for each of the components of O&M expenses viz., employee cost,
R&M expense and A&G expense;
(ii) Norms shall be defined in terms of combination of number of personnel per
long/ medium term consumer, number of personnel per MW of capacity
handled for long/ medium term consumers along with annual expenses per
personnel for Employee expenses, combination of A&G expense per
personnel and A&G expense per long/ medium term consumer (or per MW
of capacity handled) for A&G expenses and R&M expense as percentage of
gross fixed assets for estimation of R&M expenses;
(iii) One-time expenses such as expense due to change in accounting policy,
arrears paid due to pay commissions and interim relief etc., shall be excluded
from the norms in the trajectory;
(iv) The expenses beyond the control of the power system operation company
such as dearness allowance, pension liabilities and terminal benefits in
Employee cost etc., shall be excluded from the norms in the trajectory;
(v) The One-time expenses and the expenses beyond the control of the power
system operation company as per sub-regulations (c) and (d) above
1 Ins .vide Not. no. HPERC/F(5)(3)(1)(SLDC) dated 1st November,2013 13 published in the R H.P. dated 5th
November, 2013 at p. 4619 to 4626.
Compendium of HPERC Regulations, March 2021 15
shall be allowed by the Commission over and above normative Operation &
Maintenance Expenses after prudence check;
(vi) The norms in the trajectory shall be proposed over the control period with
due consideration to productivity improvements and commercial viability;
(vii) The norms shall be proposed at constant prices of base year and escalation
on account of inflation shall be over and above the baseline;
(viii) Based on the proposal submitted by the power system operation company,
the Commission shall fix the norms for the said purposes which shall be
taken into account for determining the trajectories for various components
of O&M expenses for the remaining years of the control period;
(ix) Till such time the norms are fixed by the Commission, the trajectories of
various components of O&M expenses shall be submitted by the power
system operation company and determined by the Commission on the basis
of the actual costs for the previous years in accordance with the provisions of
these regulations;]
(2) The O&M expenses for the base year will be approved by the Commission taking
into account the latest available audited accounts, business plan filed by the Power System
Operation Company for the State Load Despatch Centre, estimates of the actuals for the base
year, prudence check and any other factors considered appropriate by the Commission.
1
[(3) The O&M expenses for the n
th
year of the control period shall be approved based on
the formula given as follows:-
O&Mn = R&Mn + EMPn + A&Gn :
1
Subs. vide Not. no. HPERC/F(5)(3)(1)(SLDC) dated 1
st
November,2013 published in the R H.P.
dated 5
th
November, 2013 at p. 4619-4626. Before its substitution sub-regulation (3) read as under:
“(3) The O&M expenses for the n
th
year of the control period shall be approved based on the formula
given below:-
O&Mn = (R&Mn + EMPn + A&Gn)
R&Mn= K x (GFAn-1)
Where –
EMPn = (EMPn-1) x (1+Gn) x (CPI inflation)
A&Gn = (A&Gn-1) x (WPI inflation)
‘K’ is a constant (could be expressed in %). Value of K for each year of the control period shall be determined by
the Commission based on the Power System Operation Company/State Load Despatch Centre’s filing,
benchmarking of R&M Expenses, approved R&M Expenses vis-à-vis GFA approved by the Commission in past
and any other factor considered appropriate by the Commission;
CPI inflation – is the average increase in the Consumer Price Index (CPI) for immediately preceding three years
before the base year;
WPI inflation – is the average increase in the Wholesale Price Index (WPI) for immediately preceding three years
before the base year;
EMPn – is the employee costs of the Power System Operation Company for the State Load Despatch Centre
functions for the nth year;
A&Gn – is the administrative and general costs of the Power System Operation Company for the State Load
Despatch Centre functions for the nth year;
R&Mn – is the repair and maintenance costs of the State Load Despatch Centre for the nth year;
GFAn-1 – is the Gross Fixed Asset of the Power System Operation Company for the State Load Despatch Centre
functions for n-1th year;
Gn - is a growth factor for nth year. Value of Gn shall be determined by the Commission in the MYT order for
meeting the additional manpower requirement based on the Power System Operation Company/State Load
Despatch Centre’s filings, benchmarking, approved cost by the Commission in past and any other factor that the
Commission feels appropriate.”
16 Compendium of HPERC Regulations, March 2021
Where –
R&Mn = K x GFA n-1:
EMPn = [(EMPn-1) x (1+Gn) x (CPIinflation)] + Provision(Emp) ;
A&Gn = [(A&Gn-1) x (WPIinflation)] + Provision(A&G) ;
‘K’ is a constant (could be expressed in %). Value of K for each year of the control
period shall be determined by the Commission in the MYT Tariff order based on
power system operation company’s filing, benchmarking of R&M expenses,
approved R&M expenses vis-à-vis GFA approved by the Commission in past and
any other factor considered appropriate by the Commission;
CPIinflation – is the average increase in the Consumer Price Index (CPI) for
immediately preceding three or five years before the base year, whichever is
higher;
WPIinflation – is the average increase in the Wholesale Price Index (CPI) for
immediately preceding three or five years before the base year, whichever is higher;
EMPn-1 & EMPn – employee costs of the power system operation company for the (n-
1)
th
and n
th
year; (employee cost for the base year would be adjusted for provisions
for (n-1)
th
year for the items corresponding to clauses (iii), (iv) and (v) of sub-
regulation (1-a) of regulation 19);
Provision(Emp): Provision corresponding to clauses (iii), (iv) and (v) of sub-regulation
(1-a) of regulation 19, duly projected for relevant year for expenses beyond control
of the power system operation company and expected one-time expenses as specified
above;
A&Gn-1 & A&Gn –administrative and general costs of the power system operation
company for the (n-1)
th
and n
th
year;
Provision(A&G): Cost for initiatives or other one-time expenses as proposed by the
power system operation company and validated by the Commission;
R&Mn-1 R&Mn – repair and maintenance costs of the power system operation
company for the (n-1)
th
and n
th
year;
GFAn-1 – Gross Fixed Asset of the power system operation company for the (n-1)
th
year;
Gn is a growth factor for the nth year. Value of Gn shall be determined by the
Commission in the MYT tariff order for meeting the additional manpower
requirement based on power system operation company’s filings, benchmarking, and
approved cost by the Commission in past and any other factor that the Commission
feels appropriate:
Provided that, R&M expenses determined shall be utilised towards R&M
works only;
Compendium of HPERC Regulations, March 2021 17
Note: After the fixation of norms of various components of O&M expenses as per
these regulations, the above formulae shall be suitably modified in line with the
provisions.]
1
Previous and next
Questions people ask
Is regulation 19 of the Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fees and Charges by State Load Despatch Centre) Regulations, 2011 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Levy and Collection of Fees and Charges by State Load Despatch Centre) Regulations, 2011 is recorded.