Regulation 3, The Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011: Definitions
The Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011 - Regulation 3
Text of regulation 3
Definitions
3. Definitions.- In these regulations, unless the context otherwise requires, -
1
[(1) “accounting statements” shall mean for each financial year, the balance
sheet, the profit and loss statement, the cash flow statement and the report
of the statutory auditors together with notes thereto:]
(1-a) “Act” means the Electricity Act, 2003 (36 of 2003);
(2) “additional capitalisation” means the capital expenditure incurred or
projected to be incurred, after the date of commercial operation of the project
and admitted by the Commission after prudence check, subject to the
provisions of regulation;
2
[(2-a) “aggregate revenue requirement” or “ARR” means the costs pertaining to
hydro generating stations which are permitted, in accordance with these
regulations, to be recovered from the tariffs and charges determined by the
Commission.]
(3) “Appendix” means the appendix to these regulations;
1
Existing clause (1) shall be renumbered (1-a) and insert clause (1) vide Not. No. HPERC-F(1)-
2/2018 dated 22
nd
November, 2018 published in the R.H.P. 27
th
November, 2018 at p. 6249-6256.
2
Ins. vide Not. No. HPERC/F (5)(3)(1) (Gen) dated 1
st
November, 2013 published in the R H.P. dated
4
th
November,2013 at p. 4599-460.
Compendium of HPERC Regulations, March 2021 3
(4) “applicant” means a generating company who has made an application for
determination of tariff or an application for
1[mid-term performance review] in
accordance with the Act and under these regulations and includes a generating
company whose tariff is the subject of a review by the Commission either suo-
motu or on a petition filed by any interested or affected person or as part of
2[mid-term performance review;]
(5) “auxiliary energy consumption” or “AUX” in relation to a period means the
quantum of energy consumed by auxiliary equipment of the generating station,
and transformer losses within the generating station, expressed as a percentage
of the sum of gross energy generated at the generator terminals of all the units
of the generating station;
(6) “base year” means the financial year immediately preceding the first year of
the control period;
(7) “beneficiary” in relation to a generating station means the person purchasing
electricity generated at such a generating station whose tariff is determined
under these regulations;
(8) “ capital cost” means the capital cost as defined in regulation;
(9) “Central Commission” means the Central Electricity Regulatory Commission
as referred to in sub- section (1) of section 76 of the Act;
2
[(10) “change in law” shall mean the occurrence of any of the following events:
(i) enactment, bringing into effect or promulgation of any new Indian
law, or
(ii) adoption, amendment, modification, repeal or re-enactment of any
existing Indian law, or
(iii) change in interpretation or application of any Indian law by a
competent Court, Tribunal or Indian Governmental Instrumentality,
which is the final authority under law for such interpretation or
application, or
(iv) change by any competent statutory authority in any condition or
covenant of any consent or clearances or approval or licence
available or obtained for the project, or
(v) coming into force or change in any bilateral or multilateral
agreement/ treaty between the Government of India and any other
Sovereign Government having implication for the Generating
Station regulated under these regulations; ]
1
Subs. for “annual perform review” vide Not. No. HPERC/F(5)(3)(1)(Gen) dated 1
st
Nov., 2013,
published in the R H.P. dated 4
th
November, 2013 at p. 4599-4606.
2
Subs. vide Not. No. HPERC-F(1)-2/2018 dated 22
nd
November, 2018 published in the R.H.P. 27
th
November, 2018 at p. 6249-6256 and before its substitution it read as under:-
“10. “change in law” means occurrence of any of the following events:-
(a) the enactment, bringing into effect, adoption, promulgation, amendment, modification or
repeal of any law, or
(b) change in interpretation of any law by a competent court, Tribunal or Indian Governmental
Instrumentality which is the final authority under law for such interpretation, or
(c) change by any competent statutory authority, in any consent, approval or licence available
or obtained for the project;”
4 Compendium of HPERC Regulations, March 2021
(11) “Commission” means the Himachal Pradesh Electricity Regulatory
Commission as referred to in sub- section (1) of section 82 of the Act;
(12) “Conduct of Business Regulations” means the Conduct of Business
Regulations specified by the Commission under sub-section (1) of section
92 of Act;
(13) “control period” means a multi-year period fixed, by the Commission,
from time to time, for which the principles of determination of revenue
requirement and tariff will be laid down;
(14) “cut-off date” means 31
st
March of the year closing after two years of the
year of commercial operation of the project, and in case the project is
declared under commercial operation in the last quarter of a year, the
cut-off date shall be 31
st
March of the year closing after three years of the
year of commercial operation;
(15) “date of commercial operation” or “COD” means in relation to a unit of
hydro generating station, the date declared by the generating company
from 0000 hour of which, after notice to the beneficiaries, scheduling
process in accordance with the Indian Electricity Grid Code and/or the
Himachal Pradesh Electricity Grid Code is fully implemented, and in
relation to the generating station as a whole, the date declared by the
generating company after demonstrating peaking capability
corresponding to installed capacity of the generating station through a
successful trial run, after notice to the beneficiaries.
Note-
1. In case the hydro generating station, with pondage or storage, is not able
to demonstrate peaking capability corresponding to the installed capacity
for the reasons of insufficient reservoir or pond level, the date of
commercial operation of the last unit of the generating station shall be
considered as the date of commercial operation of the generating station
as a whole, provided that it will be mandatory for such hydro generating
station to demonstrate peaking capability equivalent to the installed
capacity of the generating unit or the generating station as and when such
reservoir /pond level is achieved.
2. In case of purely run-of-river hydro generating station if the unit or the
generating station is declared under commercial operation during lean
inflows period when the water is not sufficient for such demonstration, it
shall be mandatory for such hydro generating station or unit to
demonstrate peaking capability equivalent to the installed capacity as and
when sufficient inflow is available.
(16) “day” means the 24 hour period starting at 0000 hour;
(17) “declared capacity” or “DC' in relation to a generating station means, the
capability to deliver ex-bus electricity in MW declared by such generating
station in relation to any time-block of the day or whole of the day, duly
taking into account the availability of water, and subject to further
qualification in the relevant regulation;
Compendium of HPERC Regulations, March 2021 5
(18) “design energy” means the quantum of energy which could be generated in
a 90% dependable year with 95% installed capacity of the hydro generating
station;
(19) “existing station” means a hydro generating station declared under
commercial operation from a date prior to
1
[first year of the control period;]
(20) “existing project” means a project declared under commercial operation
from a date prior to
1
[first year of the control period;]
(21) “financial year” means a period commencing on 1
st
April of a calendar
year and ending on 31
st
March of the subsequent calendar year;
2
[(21-a) “force majeure event” shall mean, with respect to any party, any event or
circumstance or combination of events or circumstances including those
stated below, which is not within the reasonable control of, and is not due to
an act of omission or commission of that party and which, by the exercise of
reasonable care and diligence, could not have been avoided, and without
limiting the generality of the foregoing, would include the following events:
(i) acts of God including lightning, drought, fire and explosion,
earthquake, volcanic eruption, landslide, flood, cyclone, typhoon,
tornado, geological surprises, or exceptionally adverse weather
conditions, or
(ii) any act of war, invasion, armed conflict or act of foreign enemy,
lockade, embargo, revolution, riot, insurrection, terrorist or military
action, or
(iii) industry-wide strikes and labour disturbances having a wide
impact;]
(22) “infirm power” means electricity generated prior to commercial operation
of the unit of a hydro generating station;
(23) “installed capacity” or “IC” means the summation of the name plate
capacities of all the units of the generating station or the capacity of the
generating station (reckoned at the generator terminals) as approved by the
Commission from time to time;
3
[(23-a)“MCLR” shall mean One Year Marginal Cost of Funds based Lending
Rate;]
4
[(23-b) “mid-term performance review” or “MPR” means the review of
performance of the generator undertaken by the Commission for the year
after the middle year of the control period and this includes the True Up of
the previous control period and True Up of previous years of the control
period;]
1
Subs. for “01.04.2011” vide Not. No. HPERC/F (5)(3)(1)(Gen) dated 1
st
November, 2013 published
in the R..H.P dated 4
th
November, 2013 at p. 4599-4606.
2
Ins. clause (21-a) vide Not. No. HPERC-F(1)-2/2018 dated 22
nd
November, 2018 published in the
R.H.P. 27
th
November, 2018 at p. 6249-6255.
3
Ins. clause (23-a) vide Not. No. HPERC-F(1)-2/2018 dated 22
nd
November, 2018 published in the
R.H.P. 27
th
November, 2018 at p. 6249-6255.
4
Ins. vide Not. No. HPERC/F (5)(3)(1) (Gen.) dated 1
st
Nov., 2013 published in the R H.P. dated 4
th
November, 2013 at p. 4599-4606.
6 Compendium of HPERC Regulations, March 2021
(24) “new station” means a hydro generating station declared under
commercial operation on or after
1
[1
st
April of the first year of control
period;]
2
[(25) “Normative Annual Plant Availability Factor” or “NAPAF” in relation
to a generating station means the availability factor as specified in the
regulation on ‘Operational Norms’;]
(26) “original project cost” means the capital expenditure incurred by the
generating company within the original scope of the project up to the cut-
off date as admitted by the Commission;
(27) “Plant Availability Factor (PAF)” in relation to a generating station for
any period means the average of the daily declared capacities (DCs) for all
the days during that period expressed as a percentage of the installed
capacity in MW reduced by the normative auxiliary energy consumption;
(28) “project” means a hydro generating station and includes the complete
hydro power generating facility covering all components such as dam,
intake, water conductor system, power generating station and generating
units of the scheme as apportioned to power generation;
3
[(28-a)“prudence check” shall mean scrutiny of the reasonableness of
expenditure incurred or proposed to be incurred, financing plan, use of
efficient technology, cost and time over-run and such other factors as may
be considered appropriate by the Commission for determination of tariff;]
(29) “run-of-river power station” means a hydro electric power generating
station which does not have upstream pondage;
(30) “run-of-river power station with pondage” means a hydro electric power
generating station with sufficient pondage for meeting the diurnal variation
in power demand;
(31) “scheduled energy” means the quantum of energy scheduled by the State
Load Despatch Centre to be injected into the grid by a generating station
over a day;
(32) “scheduled generation” or “SG” at any time or for any period or time-
block means schedule of generation in MW or MWh ex-bus, given by the
concerned Load Despatch Centre;
(33) “storage type power station” means a hydro electric power generating
station associated with large storage capacity to enable variation of
generation of power according to demand;
1
Subs. for “01.04.2011”, vide Not. No. HPERC/F(5)(3)(1)(Gen.) published in the R H.P. dated
4
th
November, 2013 at p. 4599-4606.
2
Subs. vide Not. No. HPERC/F (5)(3)(1) (Gen.) dated 1
st
Nov., 2013 published in the R H.P.
dated 4
th
November,2013 at p. no. 4599-4606. Before substitution Clause 25 read as under:-
“(25) Normative Annual Plant Availability Factor” or “NAPAF” in relation to a generating station means
the availability factor specified in clause (a) of sub-regulation 0 of regulation 0 for hydro generating station;”
3
Ins. clause (28-a) vide Not. No. HPERC-F(1)-2/2018 dated 22
nd
November, 2018 published in
the R.H.P. 27
th
November, 2018 at p. 6249-6255.
Compendium of HPERC Regulations, March 2021 7
(34) “State” means the State of Himachal Pradesh;
(35) “unit” in relation to a hydro generating station means turbine-generator and
its auxiliaries;
(36) “useful life” in relation to a unit of a hydro generating station shall be 40
years from the COD;
(37) “year” means a financial year; and the words and expressions occurring in
these regulations and not defined herein but defined in the Act or Grid Code
or State Grid Code shall bear the same meanings as respectively assigned to
them in the Act or Grid Code or State Grid Code and the words and
expressions used herein but not specifically defined herein or in the Act or
Grid Code or State Grid Code shall have the meanings generally assigned to
them in the electricity industry;
1[(38) the words and expressions occurring in these regulations and not defined
herein but defined in the Act or Grid Code or State Grid Code shall bear the
same meanings as respectively assigned to them in the Act or Grid Code or
State Grid Code and the words and expressions used herein but not
specifically defined herein or in the Act or Grid Code or State Grid Code
shall have the meanings generally assigned to them in the electricity
industry.]
PART-II
GUIDING PRINCIPLES
Previous and next