Form 1, MP Investment Facilitation Rules 2010: FORM 1
MP Investment Facilitation Rules 2010 - Form 1
Text of form 1
FORM 1
FORM 1
(I) Basic Information:
Name of the Project:
Location/site alternatives under consideration:
Size of the Project:
Expected Cost of the Project:
Contact Information:
Screening Category:
• Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease
area and production capacity for mineral production, area for mineral exploration, length for linear
transport infrastructure, generation capacity for power generation etc.,)
(II) Activity-
1. Construction, operation or decommissioning of the Project involving actions, which will cause
physical changes in the locality (topography,land use, changes in water bodies, etc.)
S. No. Information/Checklist confirmation Yes/No. Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
(1) (2)
Permanent or temporary change in land use,
land cover or topography including increase
in intensity of land use (with respect to local
land use plan).
2 Clearance of existing land, vegetarian and
buildings
3 Creation of new land uses
4 Pre-construction investigations e. g. bore
houses, soil testing
5 Construction works?
6 Demolition Works
7 Temporary sites used for construction works
or Housing of construction workers
8 Above ground buildings, structures or earth
works including linear structures, cut and fill
or excavations
(3) (4)
68 i:r~ ~, ~ 28 ~ 2011
(1) (2)
9 Underground works including mining or
tunneling
10 Reclamation works
11 Dredging
12 Offshore structures
13 production and manufacturing processes?
14 Facilities for storage of goods or materials
15 Facilities for treatment or disposal of solid
water or liquid effluents
16 Facilities for long term housing of operation
workers
17 New road, rail or sea traffic during
construction or operation
18 New road, rail, air, waterborne or other
transport infrastructure including new or
altered routes and stations, ports, airports
etc.
19 Closure or diversion of existing transport
routes or infrastructure leading to changes in
traffic movements
20 New or diverted transmission lines or
pipelines
21 Impoundment, damming, cul verting,
realignment or other changes to the hydrology
or watercourses or aquifers
22 Stream crossings
23 Abstraction or transfers or water from ground
or surface waters
24 Changes in water bodies or the land surface
affecting drainage or run-off
25 Transport of personnel or materials for
construction. operation or decommissioning
26 Long-term dismantling or decommissioning
or restoration works
27 Ongoing activity during decommissioning
\vhich could have an impact on the
environ1nent
(3) (4)
'l-WT 4 (Tf) J •F-2fl1zyf ~, ~ 28 ~ 2011 69
(l) (2)
28 Influx of people to an area in either
temporarily or permanently
29 Introduction of alien species
30 Loss of native species or genetic diversity
31 Any other actions
(3) (4)
2. Use of Natural resources for construction or operation of the Project (such as land, water, materials
or energy, especially any resources which are non-renewable or in short supply):
S. No. Information/Checklist confirmation
(l) (2)
l Land especially undeveloped or agricultural
land (ha)
2 Water (expected source & competing users
unit; KLD
3 Minerals (MT)
4 Construction material-stone, aggregates, and/
soil (expected source-MT)
5 Forests and timber (source-MT)
6 Energy including electricity and fuels (source,
competing users) Unit; fuel (MT), energy
(MW)
7 Any other natural resources (use appropriate
standard units)
Yes/No.
(3)
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
(4)
3. Use storage, transport, handling or production of substances or materials, which could be harmful
to human health or the environment or raise concerns about actual or perceived risks to human
health
S. No. Information/Checklist confirmation
(l) (2)
Use of substances or materials, which are
hazardous (as per MSIHC rules) to human
health or the environment (flora, fauna, and
water supplies)
2 Changes in occurrence of disease or affect
disease vectors (e.g. insect or water borne
diseases)
Yes/No.
(3)
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
(4)
70
(1) (2)
3 Affect the welfare of people e.g. by changing
living conditions?
4 Vulnerable groups of people who could be
affected by the project e.g. hospital patients,
children, the elderly etc.,
5 Any other causes
(3) (4)
4. Production of solid wastes during construction or operation or decommissioning (MT/month)
S. No. Information/Checklist confirmation
(1) (2)
l Spoil, overburden or mine wastes
2 Municipal waste (domestic and or
commercial wastes)
3 Hazardous wastes (as per Hazardous Waste
Management Rules)
4 Other industrial process wastes
5 Surplus product
6 Sewage sludge or other sludge from effluent
treatment.
7 Construction or demolition wastes
8 Redundant machinery or equipment
9 Contaminated soils or other materials
10 Agricultural wastes
11 Other Solid wastes
Yes/No.
(3)
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
(4)
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
S. No. Information/Checklist confirmation
(1) (2)
l Emissions from combustion of fossil fuels
from stationary of mobile sources
2 Emissions from production processes
Yes/No.
(3)
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
(4)
'l{]Tf 4 (TT) ] i::r~ ~, fu:rrcn 28 ~ 2011 71
(1) (2)
3 Emissions from materials handling inculding
storage or transport
4 Emissions from construction activities
including plant and equipment
5 Dust or odours from handling of materials
including construction materials sewage and
waste
6 Emissions from incineration of wastes
7 Emissions from burning of waste in open air
(e.g. slash materials, construction debris)
8 Emissions from any other sources
(3) (4)
6. Generation of Noise and Vibration, and Emissions of Light and Heat :
S. No.
(1)
2
3
4
5
6
7
Information/Checklist confirmation
(2)
From Operation of equipment e. g. engines,
ventilation plant, crushers
From industrial or similar processes
From construction or demolition
From blasting or piling
From construction or operation traffic
From lighting or cooling systems
From any other sources
Yes/No.
(3)
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
(4)
7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers,
surface waters, ground water, coastal waters of the sea:
S. No. Information/Checklist confirmation
(l) (2)
From handling, storage, use or spillage of
hazardous materials
2 From discharge of sewage or other effluents
to \vatcr or the land (expected inodc and
place of discharge).
Yes/No.
(3)
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
(4)
72
(l)
i:i~ ~, ~ 28 ~ 2011
(2)
3 By desposition of pollutants emitted to air
into the land or into water
4 From any other sources
5 Is there a risk of long term build up of
pollutants in the environment from these
sources
(3) (4)
8. Risk of accidents during construction or operation of the Project, which could affect human health
or the environment:-
S. No. Information/Checklist confirmation Yes/No. Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
(l) (2) (3) (4)
l From explosions, spillages, fires etc. from
storage, handling, use or production of
hazardous substances
2 From any other causes
3 Could the project be affected by natural
disasters causing environmental damage
(e. g. floods, earthquakes, landslides, cloud -
bursts etc)?
9. Factors which should be considered (such as consequential development) which could lead to
environmental effects or the potential for comulative impacts with other existing or planned
activities in the locality:-
S. No. Information/Checklist confirmation Yes/No. Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
(1) (2)
Lead to development of supporting
disabilities, ancillary development or
development stimulated by the project which
could have impact on the environment e.g.:-
• Supporting infrastructure (roads, power,
supply, waste or waste water treatment,
etc.)
• housing development
• extractive industries
• supply industries
• other
2 Lead to after-use of the site. which could
have an impact on the environrnent
(3) (4)
'!:ffTf 4 (Tf)] i:i~ ~, fu:;:,tcf, 28 ~ 2011
(1) (2)
3 Set a precedent for later developments
4 Have cumulative effects due to proximity to
other existing or planned projects with similar
effects
(Ill) Environmental Sensitivity
S. No. Areas
(1) (2)
l Areas protected under international
conventions, national or local legislation for
their ecological, landscape, cultural or other
related value
2 Areas which are important or sensitive for
ecological reasons-Wetlands, watercourses or
other water bodies, coastal zone, biospheres,
mountains, forests
3 Areas used by protected, important or
sensitive species of flora or fauna for breding,
nesting, foraging, resting, over wintering,
migration
4 Inland, coastal, marine or underground waters
5 State, National boundaries
6 Routes or facilities used by the public for
access to recreation or other tourist, pilgrim
areas
7 Defence installations
8 Densely populated or built-up area
9 Areas occupied by sensitive man-made land
uses ( hospitals, schools, places of \Vorslzip,
community facilities)
10 Areas containing important high quality or
scarce resources
(ground ivater resources, swface resources.,
forestry, ugricult11re fisheries, tourism.
minerals)
11 Areas already subjected to pollution or
environmental damage. (those where existing
legal environmentul standards are exceecled)
(3)
Name/
Identity
(3)
(4)
Aerial distance (within 15 km.)
Proposed project location
boundary
(4)
73
74 'i~ ~, ~ 28 ~ 2011
(l) (2) (3) (4)
12 Areas susceptible to natural hazard which
could cause the project to present
environmental problems
( earthquakes, subsidence, landslides, erosion,
flooding or extreme or adverse climatic
conditions)
(IV) Proposed Terms of Reference for EIA studies
ENCLOSURES REQUIRED :
Copy of Registration from the Industry Department
Copy of land allotment
Copy of project report
Conceptual plan
Name & Signature of the
Authorised Signatory
Map showing location of the proposed industry and micro-level features in 5Km. Radius around the industry.
Note.-Application to be submitted in duplicate.
(1)
l(a)
l(b)
LIST OF PROJECTS OR ACTIVITIES REQUIRING PRIOR ENVIRONMENTAL CLEARANCE
Project or Activity
(2)
Mining of
Minerals
Offshore and onshore
oil and gas exploration,
development &
production.
Category with threshold limit Conditions, if any
A B
Mining, extraction of natural resources and power generation (for a
specified production capacity.
(3) (4) (5)
:?. 50 ha. of mining
lease area
Asbestos mining
irrespective of mining
area.
All projects
< 50 ha
:?. 5 ha. of mining
Lease area.
Geneal Condition shall
apply
Note
Mineral prospecting not
involving drilling) are
exempted provided the
concession areas have got
previous clearance for
physical survey.
Note
Exploration Surveys (not
involving drilling) are
exempted provided the
concession areas have got
previous clearance for
physical survey.
'I.WT 4 (Tf)]
(1) (2) (3)
l(c) River Valley Projects (i) z SO MW
hydroelectric power
generation;
(ii) z 10,000 ha. of
culturable command
area.
l(d) Thermal Power Plants ~ 500 MW ( coal/
lignite/naphta & gas
based);
z 50 MW (Pet coke
diesel and all other
fuels-)
l(e) Nuclear power projects All projects
and processing of
nuclear fuel
(4)
(i) < 50 MW z 25 MW
hydroelectric power
generation;
(ii) < 10,000 ha. of
culturable command
area.
< 500 MW (coal/
lignite/naphta & gas
based);
< 50 MWz 25 MW
(Pet coke diesel and all
other fuels-)
2. Primary Processing
2(a)
2(b)
3(a)
Coal washeries
Mineral beneficiaries
Metallurgical
industries (ferrous &
non ferrous)
z l million ton/annum
throughput of coal
~ 0.1 million ton/
annum mineral
throughput
< l million ton/annum
throughput of coal.
< 0.1 million ton/
annum mineral
throughput.
3. Materials Production
(a) Primary
metallurgical industry
All projects
(b) Sponge non
manufacturing z 200
rron
Li LJ
Spongeiron
manufacturing < 200
TPD
75
(5)
General condition shall
apply.
General condition shall
apply.
General condition shall
apply.
(If located within mining
area the proposal shall be
appraised together with
the mining proposal)
General condition shall
apply.
(Mining proposal with
Mineral beneficiation
shall be appraised
together for grant of
clearance)
76
(1)
3(b)
4 (a)
4 (b)
4 (c)
4 (d)
4 (e)
(2)
Cement plants
Petroleum refining
industry
Coke oven Plants
Asbestos milling and
asbestos based
products
Chlor-alkali industry
Soda ash Industry
i:i~ ~, ~ 28 ~ 2011
(3)
(c) Secondary
metallurgical
processing
industry
All toxic and heavy
metal producing units
2':. 20,000 tonnes/annum
2':. 1.0 million tonnes/
annum production
capacity
(4)
Secondary metallu
rgical processing
industry
(i) All toxic metal
producing units and
heavy metal producing
units
< 20,000 tonnes/annum
(ii) All other non-toxic
secondary
metallurgical
processing industries
> 5000 tonnes/annum
< 1.0 million tonnes/
annum production
capacity.
All stand alone
grinding units
4. Materials Processing
All projects
2':. 2,50,000 tonnes/
annum
All projects
< 2,50,000 &
2':. 25,000
tonnes/annum
2':. 300 TPD production < 300 TPD production
capacity a unit located capacity
out side the And located within a
notified industrial area/ notified indust1ial area/estate
estate
All projects
(5)
General Condition shall
apply for Sponge iron
manufacturing
General Condition shall
apply.
Specific condition shall
apply
No new mercury Cell
based plants will be
permitted and existing
units converting to
membrane cell technol
ogy are exempted from
this Notification
'l-WT 4 ( T[) J
(1)
4 (f)
5 (a)
5 (b)
5 (c)
5 (d)
5 (e)
5 (f)
i:r~ ~, ~ 28 ~ 2011
(2)
Leather/Skin/hide
processing industry
(3)
New projects outside
the industrial area or
expansion of existing
units out side the
industrial area.
(4)
All new or expansion
of projects located
within a notified
industrial area/estate
5 Manufacturing/Fabrication
Chemical fertilizers
Pesticides industry
and pesticide specific
intermediates
(excluding fo1mulations)
Petro-chemical
complexes (industries
based on processing of
petroleum fractions &
natural gas and/or
reforming to
aromatics)
All projects
All units producing
technical grade
pesticides
All projects
Manmade fibres/ Rayon
manufacturing
Petrochemical based Located outside the
processing (processes notified industrial area/
other than cracking & estate
reformation and not
covered under the
complexes)
Synthetic
chemicals
(dyes
organic
industry
& dye
intermediates; bulk
drugs and
intermediates
excluding drug
formulations; synthetic
rubbers; basic organic
chemicals, other
synthetic organic
chemicals and
c h e m
intermediates)
c a I
Located outside the
notified industrial area/
estate
Others
Located in a notified
industrial area/estate
Located in a notified
industrial area/estate
77
(5)
Specific condition shall
apply
General Condition shall
apply
Specific Condition shall
apply
Specific Condition shall
apply
78
(l)
5 (g)
5 (h)
5 (i)
5 U)
5 (k)
(2)
Distilleries
Integrated
industry
paint
Pulp & paper industry
excluding manufacturing
of paper from waste
paper and manufacture
of paper from ready
pulp with out bleaching
Sugar Industry
Induction/arc furnaces/
cupola furnaces 5TPH
or more
i:i~ ~, ~ 28 ~ 2011
(3)
(i) All Molasses based
distilleries
(ii) All Cane juice/non
mol asses based
distilleries 2. 30KLD
Pulp manufacturing
and Pulp & Paper
manufacturing industry
(4)
All Cane juice/non
molasses based
distilleries < 30 KLD
All projects
Paper manufacturing
industry without pulp
manufacturing
2:. 5000 tcd cane
crushing capacity.
All projects
6 Service Sector
6 (a) Oil & gas All projects
transportation pipe line
6 (b)
(crude and refinery/
petrochemical
products), passing
through national parks/
sanctuaries/coral reefs/
ecologically sensitive
areas including LNG
Terminal
Isolated storage &
handling of hazardous
chemicals (As per
threshold planning
quantity indicated in
column 3 of schedule
2 & 3 of MSIHC Rules
1989 amended 2000)
All projects
(5)
General Condition shall
apply
General Condition shall
apply
General Condition shall
apply
General Condition shall
apply
General Condition shall
apply
General Condition shall
apply
'!flTl 4 (Tf)] i:i~ ~, ~ 28 ~ 2011 79
(l) (2) (3) (4) (5)
7 Physical Infrastructure including Environmental Services
7 (a) Air Ports All projects
7 (b) All ship breaking yards All projects
including ship breaking
7 (c)
7 (d)
7 (e)
7 (f)
7 (g)
7 (h)
units
Industrial estates/parks/
complexes, areas,
export processing
Zones (EPZs), Special
Economic Zones
(SEZs), Biotech Parks,
Leather.
Complexes
Common hazardous
waste treatment,
storage and disposal
facilities (TSDFs)
Ports, Harbours
High ways
Aerial ropeways
Common Effluent
Treatment
(CETPs)
Plants
If at least one industry
in the pr
Previous and next
Questions people ask
Is form 1 of MP Investment Facilitation Rules 2010 still in force?
No repeal of MP Investment Facilitation Rules 2010 is recorded.