LawGrids logoLAWGRIDS.ORG

Form 1, MP Investment Facilitation Rules 2010: FORM 1

MP Investment Facilitation Rules 2010 - Form 1

Text of form 1

FORM 1

FORM 1 (I) Basic Information: Name of the Project: Location/site alternatives under consideration: Size of the Project: Expected Cost of the Project: Contact Information: Screening Category: • Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (II) Activity- 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography,land use, changes in water bodies, etc.) S. No. Information/Checklist confirmation Yes/No. Details thereof (with approximate quantities/ rates, wherever possible) with source of information data (1) (2) Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan). 2 Clearance of existing land, vegetarian and buildings 3 Creation of new land uses 4 Pre-construction investigations e. g. bore houses, soil testing 5 Construction works? 6 Demolition Works 7 Temporary sites used for construction works or Housing of construction workers 8 Above ground buildings, structures or earth works including linear structures, cut and fill or excavations (3) (4) 68 i:r~ ~, ~ 28 ~ 2011 (1) (2) 9 Underground works including mining or tunneling 10 Reclamation works 11 Dredging 12 Offshore structures 13 production and manufacturing processes? 14 Facilities for storage of goods or materials 15 Facilities for treatment or disposal of solid water or liquid effluents 16 Facilities for long term housing of operation workers 17 New road, rail or sea traffic during construction or operation 18 New road, rail, air, waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc. 19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements 20 New or diverted transmission lines or pipelines 21 Impoundment, damming, cul verting, realignment or other changes to the hydrology or watercourses or aquifers 22 Stream crossings 23 Abstraction or transfers or water from ground or surface waters 24 Changes in water bodies or the land surface affecting drainage or run-off 25 Transport of personnel or materials for construction. operation or decommissioning 26 Long-term dismantling or decommissioning or restoration works 27 Ongoing activity during decommissioning \vhich could have an impact on the environ1nent (3) (4) 'l-WT 4 (Tf) J •F-2fl1zyf ~, ~ 28 ~ 2011 69 (l) (2) 28 Influx of people to an area in either temporarily or permanently 29 Introduction of alien species 30 Loss of native species or genetic diversity 31 Any other actions (3) (4) 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S. No. Information/Checklist confirmation (l) (2) l Land especially undeveloped or agricultural land (ha) 2 Water (expected source & competing users unit; KLD 3 Minerals (MT) 4 Construction material-stone, aggregates, and/ soil (expected source-MT) 5 Forests and timber (source-MT) 6 Energy including electricity and fuels (source, competing users) Unit; fuel (MT), energy (MW) 7 Any other natural resources (use appropriate standard units) Yes/No. (3) Details thereof (with approximate quantities/ rates, wherever possible) with source of information data (4) 3. Use storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health S. No. Information/Checklist confirmation (l) (2) Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) Yes/No. (3) Details thereof (with approximate quantities/ rates, wherever possible) with source of information data (4) 70 (1) (2) 3 Affect the welfare of people e.g. by changing living conditions? 4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., 5 Any other causes (3) (4) 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S. No. Information/Checklist confirmation (1) (2) l Spoil, overburden or mine wastes 2 Municipal waste (domestic and or commercial wastes) 3 Hazardous wastes (as per Hazardous Waste Management Rules) 4 Other industrial process wastes 5 Surplus product 6 Sewage sludge or other sludge from effluent treatment. 7 Construction or demolition wastes 8 Redundant machinery or equipment 9 Contaminated soils or other materials 10 Agricultural wastes 11 Other Solid wastes Yes/No. (3) Details thereof (with approximate quantities/ rates, wherever possible) with source of information data (4) 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S. No. Information/Checklist confirmation (1) (2) l Emissions from combustion of fossil fuels from stationary of mobile sources 2 Emissions from production processes Yes/No. (3) Details thereof (with approximate quantities/ rates, wherever possible) with source of information data (4) 'l{]Tf 4 (TT) ] i::r~ ~, fu:rrcn 28 ~ 2011 71 (1) (2) 3 Emissions from materials handling inculding storage or transport 4 Emissions from construction activities including plant and equipment 5 Dust or odours from handling of materials including construction materials sewage and waste 6 Emissions from incineration of wastes 7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) 8 Emissions from any other sources (3) (4) 6. Generation of Noise and Vibration, and Emissions of Light and Heat : S. No. (1) 2 3 4 5 6 7 Information/Checklist confirmation (2) From Operation of equipment e. g. engines, ventilation plant, crushers From industrial or similar processes From construction or demolition From blasting or piling From construction or operation traffic From lighting or cooling systems From any other sources Yes/No. (3) Details thereof (with approximate quantities/ rates, wherever possible) with source of information data (4) 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, ground water, coastal waters of the sea: S. No. Information/Checklist confirmation (l) (2) From handling, storage, use or spillage of hazardous materials 2 From discharge of sewage or other effluents to \vatcr or the land (expected inodc and place of discharge). Yes/No. (3) Details thereof (with approximate quantities/ rates, wherever possible) with source of information data (4) 72 (l) i:i~ ~, ~ 28 ~ 2011 (2) 3 By desposition of pollutants emitted to air into the land or into water 4 From any other sources 5 Is there a risk of long term build up of pollutants in the environment from these sources (3) (4) 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment:- S. No. Information/Checklist confirmation Yes/No. Details thereof (with approximate quantities/ rates, wherever possible) with source of information data (l) (2) (3) (4) l From explosions, spillages, fires etc. from storage, handling, use or production of hazardous substances 2 From any other causes 3 Could the project be affected by natural disasters causing environmental damage (e. g. floods, earthquakes, landslides, cloud - bursts etc)? 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for comulative impacts with other existing or planned activities in the locality:- S. No. Information/Checklist confirmation Yes/No. Details thereof (with approximate quantities/ rates, wherever possible) with source of information data (1) (2) Lead to development of supporting disabilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.:- • Supporting infrastructure (roads, power, supply, waste or waste water treatment, etc.) • housing development • extractive industries • supply industries • other 2 Lead to after-use of the site. which could have an impact on the environrnent (3) (4) '!:ffTf 4 (Tf)] i:i~ ~, fu:;:,tcf, 28 ~ 2011 (1) (2) 3 Set a precedent for later developments 4 Have cumulative effects due to proximity to other existing or planned projects with similar effects (Ill) Environmental Sensitivity S. No. Areas (1) (2) l Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons-Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters 5 State, National boundaries 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas 7 Defence installations 8 Densely populated or built-up area 9 Areas occupied by sensitive man-made land uses ( hospitals, schools, places of \Vorslzip, community facilities) 10 Areas containing important high quality or scarce resources (ground ivater resources, swface resources., forestry, ugricult11re fisheries, tourism. minerals) 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmentul standards are exceecled) (3) Name/ Identity (3) (4) Aerial distance (within 15 km.) Proposed project location boundary (4) 73 74 'i~ ~, ~ 28 ~ 2011 (l) (2) (3) (4) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems ( earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) (IV) Proposed Terms of Reference for EIA studies ENCLOSURES REQUIRED : Copy of Registration from the Industry Department Copy of land allotment Copy of project report Conceptual plan Name & Signature of the Authorised Signatory Map showing location of the proposed industry and micro-level features in 5Km. Radius around the industry. Note.-Application to be submitted in duplicate. (1) l(a) l(b) LIST OF PROJECTS OR ACTIVITIES REQUIRING PRIOR ENVIRONMENTAL CLEARANCE Project or Activity (2) Mining of Minerals Offshore and onshore oil and gas exploration, development & production. Category with threshold limit Conditions, if any A B Mining, extraction of natural resources and power generation (for a specified production capacity. (3) (4) (5) :?. 50 ha. of mining lease area Asbestos mining irrespective of mining area. All projects < 50 ha :?. 5 ha. of mining Lease area. Geneal Condition shall apply Note Mineral prospecting not involving drilling) are exempted provided the concession areas have got previous clearance for physical survey. Note Exploration Surveys (not involving drilling) are exempted provided the concession areas have got previous clearance for physical survey. 'I.WT 4 (Tf)] (1) (2) (3) l(c) River Valley Projects (i) z SO MW hydroelectric power generation; (ii) z 10,000 ha. of culturable command area. l(d) Thermal Power Plants ~ 500 MW ( coal/ lignite/naphta & gas based); z 50 MW (Pet coke diesel and all other fuels-) l(e) Nuclear power projects All projects and processing of nuclear fuel (4) (i) < 50 MW z 25 MW hydroelectric power generation; (ii) < 10,000 ha. of culturable command area. < 500 MW (coal/ lignite/naphta & gas based); < 50 MWz 25 MW (Pet coke diesel and all other fuels-) 2. Primary Processing 2(a) 2(b) 3(a) Coal washeries Mineral beneficiaries Metallurgical industries (ferrous & non ferrous) z l million ton/annum throughput of coal ~ 0.1 million ton/ annum mineral throughput < l million ton/annum throughput of coal. < 0.1 million ton/ annum mineral throughput. 3. Materials Production (a) Primary metallurgical industry All projects (b) Sponge non manufacturing z 200 rron Li LJ Spongeiron manufacturing < 200 TPD 75 (5) General condition shall apply. General condition shall apply. General condition shall apply. (If located within mining area the proposal shall be appraised together with the mining proposal) General condition shall apply. (Mining proposal with Mineral beneficiation shall be appraised together for grant of clearance) 76 (1) 3(b) 4 (a) 4 (b) 4 (c) 4 (d) 4 (e) (2) Cement plants Petroleum refining industry Coke oven Plants Asbestos milling and asbestos based products Chlor-alkali industry Soda ash Industry i:i~ ~, ~ 28 ~ 2011 (3) (c) Secondary metallurgical processing industry All toxic and heavy metal producing units 2':. 20,000 tonnes/annum 2':. 1.0 million tonnes/ annum production capacity (4) Secondary metallu­ rgical processing industry (i) All toxic metal producing units and heavy metal producing units < 20,000 tonnes/annum (ii) All other non-toxic secondary metallurgical processing industries > 5000 tonnes/annum < 1.0 million tonnes/ annum production capacity. All stand alone grinding units 4. Materials Processing All projects 2':. 2,50,000 tonnes/ annum All projects < 2,50,000 & 2':. 25,000 tonnes/annum 2':. 300 TPD production < 300 TPD production capacity a unit located capacity out side the And located within a notified industrial area/ notified indust1ial area/estate estate All projects (5) General Condition shall apply for Sponge iron manufacturing General Condition shall apply. Specific condition shall apply No new mercury Cell based plants will be permitted and existing units converting to membrane cell technol­ ogy are exempted from this Notification 'l-WT 4 ( T[) J (1) 4 (f) 5 (a) 5 (b) 5 (c) 5 (d) 5 (e) 5 (f) i:r~ ~, ~ 28 ~ 2011 (2) Leather/Skin/hide processing industry (3) New projects outside the industrial area or expansion of existing units out side the industrial area. (4) All new or expansion of projects located within a notified industrial area/estate 5 Manufacturing/Fabrication Chemical fertilizers Pesticides industry and pesticide specific intermediates (excluding fo1mulations) Petro-chemical complexes (industries based on processing of petroleum fractions & natural gas and/or reforming to aromatics) All projects All units producing technical grade pesticides All projects Manmade fibres/ Rayon manufacturing Petrochemical based Located outside the processing (processes notified industrial area/ other than cracking & estate reformation and not covered under the complexes) Synthetic chemicals (dyes organic industry & dye intermediates; bulk drugs and intermediates excluding drug formulations; synthetic rubbers; basic organic chemicals, other synthetic organic chemicals and c h e m intermediates) c a I Located outside the notified industrial area/ estate Others Located in a notified industrial area/estate Located in a notified industrial area/estate 77 (5) Specific condition shall apply General Condition shall apply Specific Condition shall apply Specific Condition shall apply 78 (l) 5 (g) 5 (h) 5 (i) 5 U) 5 (k) (2) Distilleries Integrated industry paint Pulp & paper industry excluding manufacturing of paper from waste paper and manufacture of paper from ready pulp with out bleaching Sugar Industry Induction/arc furnaces/ cupola furnaces 5TPH or more i:i~ ~, ~ 28 ~ 2011 (3) (i) All Molasses based distilleries (ii) All Cane juice/non­ mol asses based distilleries 2. 30KLD Pulp manufacturing and Pulp & Paper manufacturing industry (4) All Cane juice/non­ molasses based distilleries < 30 KLD All projects Paper manufacturing industry without pulp manufacturing 2:. 5000 tcd cane crushing capacity. All projects 6 Service Sector 6 (a) Oil & gas All projects transportation pipe line 6 (b) (crude and refinery/ petrochemical products), passing through national parks/ sanctuaries/coral reefs/ ecologically sensitive areas including LNG Terminal Isolated storage & handling of hazardous chemicals (As per threshold planning quantity indicated in column 3 of schedule 2 & 3 of MSIHC Rules 1989 amended 2000) All projects (5) General Condition shall apply General Condition shall apply General Condition shall apply General Condition shall apply General Condition shall apply General Condition shall apply '!flTl 4 (Tf)] i:i~ ~, ~ 28 ~ 2011 79 (l) (2) (3) (4) (5) 7 Physical Infrastructure including Environmental Services 7 (a) Air Ports All projects 7 (b) All ship breaking yards All projects including ship breaking 7 (c) 7 (d) 7 (e) 7 (f) 7 (g) 7 (h) units Industrial estates/parks/ complexes, areas, export processing Zones (EPZs), Special Economic Zones (SEZs), Biotech Parks, Leather. Complexes Common hazardous waste treatment, storage and disposal facilities (TSDFs) Ports, Harbours High ways Aerial ropeways Common Effluent Treatment (CETPs) Plants If at least one industry in the pr

Previous and next

All provisions of MP Investment Facilitation Rules 2010

Questions people ask

Is form 1 of MP Investment Facilitation Rules 2010 still in force?

No repeal of MP Investment Facilitation Rules 2010 is recorded.