Rule 10, The Goa Sewerage System and Sanitation Services Management Rules, 2010: Inspection of sewerage system, etc
The Goa Sewerage System and Sanitation Services Management Rules, 2010 - Rule 10
Text of rule 10
Inspection of sewerage system, etc
10. Inspection of sewerage system, etc.— (1) The Chief Engineer may cause inspection
of building, construction site or public place, and take up additional sewerage network if
the public sewer is not available for effective conveyance of wastewater/sewage from such
building, construction site or public place, within a distance of 30 metres from boundary of
such building, construction site or are public place, so as to facilitate better
wastewater/sewage management to improve sanitation and public health standards, in any
part of the State.
(2) The Chief Engineer may cause inspection of building sewerage, wastewater
/sewerage systems of public places causing nuisance and pollution posing threat to
sanitation and public health and order forrectification of defects and disconnect if so
warranted, sewerage connection and/or water supply connection from the sewerage
system and/or water supply distribution network respectively, until such time the nuisance
or pollution is removed by the consumer at his cost to the satisfaction of the Chief
Engineer.
(3) The Chief Engineer, on receiving special or general order from the Director of
Health Services or any other authority in pursuance of any Acts or rules framed thereunder
suggesting measures necessary for improving public health administration and sanitation
facilities shall to undertake the works related to such measures as soon as possible.
(4) In the event of any developmental activity is undertaken by the authorities/
department or agencies of Government of Goa, Government of India, private developers,
Government undertakings, which will affect existing or proposed sewerage system and
sanitation services under control of P.W.D.the Chief Engineer should invariably be
consulted by the respective authority department or agency before commencement of such
developmental activity and the actual cost involved in restoring, repairing or reconstruction
of sewerage and sanitation services affected shall be borne by concerned authority/
department or agency as determined by the Chief Engineer. The funds to cover the cost
restoration should be deposited with the Chief Engineer before commencement of the
work.
-5-
(5) If, in the opinion of the Executive Engineer, any premises is without effective
sewerage system, or its sewerage system is not functioning or malfunctioning, causing
overflow or stagnation of sewage or waste water resulting into nuisance or health hazard
and also if the septic tanks are not maintained scientifically causing non- -absorption of
effluent from soak pits and further if public sewer is very much available within the
distance of 30 meters from external boundary of the premises, he may by noticedirect the
owner, occupier, consumer or the in-charge person of public place, as the case may be, to
construct suitable sewerage system leading the wastewater/sewage to the public sewer
system effectively and avail the sewerage connection and related services within the time
limit mentioned in the notice.
As soon as the sewerage facility is made available within 30 meters from the premises,
the Executive Engineer shall issue a notice to avail sewerage facility developed by P.W.D.
and the owner/occupier shall immediately connect his sewerage system to the sewerage
system developed by P.W.D. at his own cost within the period mentioned in the notice,
failing which, the essential services like water supply, electricity shall be liable for
disconnection at any time after expiry of the period mentioned in the notice.
(6) If it is detected by the Executive Engineer concerned, that leakage or damage to the
sewerage system of any building, has resulted into contamination of ground water, piped
water, or any other source of water being used by the consumer or others the Executive
Engineer shall immediately order disconnection of water supply to the said building and
order the person responsible to maintain the same, to repair the same, within 24 hours. In
the event no steps are taken by the consumer to stop leakage or restore damage caused
within 24 hours of its occurence, the Executive Engineer shall himself take such steps and
recover the cost thereof from the persons responsible thereof.
(7) If it is detected by or brought to the notice of Executive Engineer that public
sewerage system is malfunctioning or choked due to any reasons whatsoever, resulting into
nuisance, accumulation of filth, he shall cause to inspect the site immediately and take
steps to restore the functioning of sewerage system. He shall recover the cost involved, if
in his opinion the cause is attributable to the consumer, by giving suitable notice, to effect
the payment within the period specified in the notice.
Previous and next
All provisions of The Goa Sewerage System and Sanitation Services Management Rules, 2010
Questions people ask
Is rule 10 of the Goa Sewerage System and Sanitation Services Management Rules, 2010 still in force?
No repeal of the Goa Sewerage System and Sanitation Services Management Rules, 2010 is recorded.