Form IV, The Goa Sewerage System and Sanitation Services Management Rules, 2010: FORM- IV
The Goa Sewerage System and Sanitation Services Management Rules, 2010 - Form IV
Text of form IV
FORM- IV
FORM- IV
[See rule 3(1)]
UNDERTAKING
I, hereby declare that for releasing the sewerage connection to the house/building bearing
No............... and standing in the property surveyed under No................. of as applied by
me vide my application dated , the pipeline will not cross any other person’s property. The
pipeline do cross the property of Shri/Smt and his/her N.O.C. is attached to the
application.
........................................................
Signature of the Applicant
Name: ............................................
Address: ....................................
Date: ...................................
______
-16-
FORM – V
[See rule 11 (2)]
Office/Bank/Consumer’s Copy
GOVERNMENT OF GOA
Public Works Department (PHE) Bill
No……………………
Bill for sewerage and sanitation services Bill
Date………………….
Consumer’s Name
& Works Division
Address
Sub-Division
Consumer code
Consumer
category
From Date Details of consumer
1. Number of persons in the premises connected
to sewerage system
To Date 2. Wastewater generation @ 100 lpcd
Issue Date 3. Water requirement as per application
Disconnection notice
The water supply connection will be liable for Disconnection without notice if three consecutive
bills remain unpaid. Water supply will be restored on payment of all dues including arrears,
delayed payment charges and reconnection charges as per rules.
Last Date of Payment
Total wastewater generated during the billing period:–
1. Total water supply availed—
(i) Metered water consumption
(ii) Tanker water supply
(iii) Own sources (Balance to make up the requirement)
Cu. M.
Cu. M.
Cu. M.
Total
Cu. M.
2. Hence wastewater generated @ 80% of total water supply
Cu. M.
3. Billed wastewater generation
4. Billed amount at applicable tariff
Rs.
Cu. M.
5. Other charges Rs.
6. Arrears/Credits Rs.
7. Gross amount payable on or before last date of payment Rs.
8. Surcharge for delayed payment Rs.
-17-
HELP PROTECT CLEAN ENVIRONMENT TO IMPROVE UPON HEALTH AND
SANITATION NOTES
1. In case the payment is effected by cheque or demand draft the same should be drawn in
favour of the Executive Engineer, Works Division …… P.W.D. as per the Works Division
mentioned in the bill and payable at place of respective office. Outstation cheques or DD are not
acceptable.
2. Payment of bill will also be accepted by the authorized banks/institutions.
3. The fact that the consumer has not received a bill will not absolve his liability for
payment of charges including delayed payment charges, fines and penalties, if any, as per the
rules. Therefore every consumer who does not receive the bill regularly, should in his own
interest, enquire about it from local office where the bill is prepared. Duplicate bill may be
obtained on payment of Rs. 5/- per bill copy.
4. Bill must be presented by the consumer at the time of payment. Please insist on official
receipt of payment and preserve the same carefully. Receipt will be valid only on realization of
cheque.
5. Any complaint regarding accuracy of the bill must be made within due date of payment
with the local office who has issued the bill.
6. It is the responsibility of the consumer to effect the payments due, in the event the bill is
subjected to corrections by the Assistant Engineer as per rules, within due date of payment to
avoid delayed payment charges, other charges including fines and penalties etc., or other actions
such as disconnection.
7. A disputed bill should be paid under protest to avoid delayed payment charges or other
actions such as disconnection.
8. The consumer shall have to report to the Assistant Engineer of his/her intention of
vacating the premises at least 15 days in advance.
Sr.
No.
Tariff Security Deposit
1 Domestic category Re. 1/- per Cu. M. of wastewater
generated
Rs. 500/- per connection.
2 Commercial category Rs. 5/- per Cu. M. of wastewater
generated
Rs. 1000/- per connection.
3 Industrial category Rs. 5/- per Cu. M. of wastewater
generated
Rs. 3000/- per connection.
4 Public places Rs. 3/- per Cu. M. of wastewater
generated
Rs. 3/- per Cu. M. of
wastewater generated
5 Surcharge for delayed payment 2% of billed amount. Rounded to next higher rupee.
Note: If one sewerage connection is availed by the consumers of same category but joining as a
group, the security deposit will be @ 50% of respective category per unit in the group.
SEWERAGE CONNECTION CHARGES
Up to 150 mm dia Above 150 mm dia Per unit in group
Domestic category Rs. 200/- per connection Rs. 350/- per connection Rs. 100/- per unit
Commercial category Rs. 500/- per connection Rs. 750/- per connection Rs. 250/- per unit
Industrial category Rs. 1000/- per connection Rs. 2000/- per connection Rs. 500/- per unit
Public places category Rs. 1000/- per connection Rs. 2000/- per connection Not applicable
Help Protect Clean Environment To Improve Upon Health And sanitation
Notification
Characteristics of wastewater/sewage discharging into the public sewer
Sub.: Requisition for sewerage connection.
For official purpose
Disconnection notice
Last Date of Payment
Previous and next
All provisions of The Goa Sewerage System and Sanitation Services Management Rules, 2010
Questions people ask
Is form IV of the Goa Sewerage System and Sanitation Services Management Rules, 2010 still in force?
No repeal of the Goa Sewerage System and Sanitation Services Management Rules, 2010 is recorded.