LawGrids logoLAWGRIDS.ORG

Form IV, The Goa Sewerage System and Sanitation Services Management Rules, 2010: FORM- IV

The Goa Sewerage System and Sanitation Services Management Rules, 2010 - Form IV

Text of form IV

FORM- IV

FORM- IV [See rule 3(1)] UNDERTAKING I, hereby declare that for releasing the sewerage connection to the house/building bearing No............... and standing in the property surveyed under No................. of as applied by me vide my application dated , the pipeline will not cross any other person’s property. The pipeline do cross the property of Shri/Smt and his/her N.O.C. is attached to the application. ........................................................ Signature of the Applicant Name: ............................................ Address: .................................... Date: ................................... ______ -16- FORM – V [See rule 11 (2)] Office/Bank/Consumer’s Copy GOVERNMENT OF GOA Public Works Department (PHE) Bill No…………………… Bill for sewerage and sanitation services Bill Date…………………. Consumer’s Name & Works Division Address Sub-Division Consumer code Consumer category From Date Details of consumer 1. Number of persons in the premises connected to sewerage system To Date 2. Wastewater generation @ 100 lpcd Issue Date 3. Water requirement as per application Disconnection notice The water supply connection will be liable for Disconnection without notice if three consecutive bills remain unpaid. Water supply will be restored on payment of all dues including arrears, delayed payment charges and reconnection charges as per rules. Last Date of Payment Total wastewater generated during the billing period:– 1. Total water supply availed— (i) Metered water consumption (ii) Tanker water supply (iii) Own sources (Balance to make up the requirement) Cu. M. Cu. M. Cu. M. Total Cu. M. 2. Hence wastewater generated @ 80% of total water supply Cu. M. 3. Billed wastewater generation 4. Billed amount at applicable tariff Rs. Cu. M. 5. Other charges Rs. 6. Arrears/Credits Rs. 7. Gross amount payable on or before last date of payment Rs. 8. Surcharge for delayed payment Rs. -17- HELP PROTECT CLEAN ENVIRONMENT TO IMPROVE UPON HEALTH AND SANITATION NOTES 1. In case the payment is effected by cheque or demand draft the same should be drawn in favour of the Executive Engineer, Works Division …… P.W.D. as per the Works Division mentioned in the bill and payable at place of respective office. Outstation cheques or DD are not acceptable. 2. Payment of bill will also be accepted by the authorized banks/institutions. 3. The fact that the consumer has not received a bill will not absolve his liability for payment of charges including delayed payment charges, fines and penalties, if any, as per the rules. Therefore every consumer who does not receive the bill regularly, should in his own interest, enquire about it from local office where the bill is prepared. Duplicate bill may be obtained on payment of Rs. 5/- per bill copy. 4. Bill must be presented by the consumer at the time of payment. Please insist on official receipt of payment and preserve the same carefully. Receipt will be valid only on realization of cheque. 5. Any complaint regarding accuracy of the bill must be made within due date of payment with the local office who has issued the bill. 6. It is the responsibility of the consumer to effect the payments due, in the event the bill is subjected to corrections by the Assistant Engineer as per rules, within due date of payment to avoid delayed payment charges, other charges including fines and penalties etc., or other actions such as disconnection. 7. A disputed bill should be paid under protest to avoid delayed payment charges or other actions such as disconnection. 8. The consumer shall have to report to the Assistant Engineer of his/her intention of vacating the premises at least 15 days in advance. Sr. No. Tariff Security Deposit 1 Domestic category Re. 1/- per Cu. M. of wastewater generated Rs. 500/- per connection. 2 Commercial category Rs. 5/- per Cu. M. of wastewater generated Rs. 1000/- per connection. 3 Industrial category Rs. 5/- per Cu. M. of wastewater generated Rs. 3000/- per connection. 4 Public places Rs. 3/- per Cu. M. of wastewater generated Rs. 3/- per Cu. M. of wastewater generated 5 Surcharge for delayed payment 2% of billed amount. Rounded to next higher rupee. Note: If one sewerage connection is availed by the consumers of same category but joining as a group, the security deposit will be @ 50% of respective category per unit in the group. SEWERAGE CONNECTION CHARGES Up to 150 mm dia Above 150 mm dia Per unit in group Domestic category Rs. 200/- per connection Rs. 350/- per connection Rs. 100/- per unit Commercial category Rs. 500/- per connection Rs. 750/- per connection Rs. 250/- per unit Industrial category Rs. 1000/- per connection Rs. 2000/- per connection Rs. 500/- per unit Public places category Rs. 1000/- per connection Rs. 2000/- per connection Not applicable Help Protect Clean Environment To Improve Upon Health And sanitation Notification Characteristics of wastewater/sewage discharging into the public sewer Sub.: Requisition for sewerage connection. For official purpose Disconnection notice Last Date of Payment

Previous and next

All provisions of The Goa Sewerage System and Sanitation Services Management Rules, 2010

Questions people ask

Is form IV of the Goa Sewerage System and Sanitation Services Management Rules, 2010 still in force?

No repeal of the Goa Sewerage System and Sanitation Services Management Rules, 2010 is recorded.