Regulation 2, The Himachal Pradesh Electricity Regulatory Commission (Short Term Open Access) Regulations, 2010: Definitions
The Himachal Pradesh Electricity Regulatory Commission (Short Term Open Access) Regulations, 2010 - Regulation 2
Text of regulation 2
Definitions
2. Definitions.- In these regulations, unless the context otherwise requires, –
(1) “Act” means the Electricity Act, 2003 (36 of 2003);
(2) “applicant” means a person who makes an application for availing short term
open access to any transmission and/or distribution system within the State in
accordance with these regulations;
1 Published in R H.P. dated 3
rd
June, 2010 at p . 1093-1104.
2 Corrected for “2 May, 2010” vide Corrigendum dated 14
th
June, 2010 published in R H.P. 15
th
June,
2010 at p. 1350.
2 Compendium of HPERC Regulations, March 2021
(3) “captive generating customer” means a person who has constructed a captive
generating plant and maintains and operates such plant and requires short term open
access for the purpose of carrying electricity from his captive generating plant to the
destination of his use;
(4) “Commission” means the Himachal Pradesh Electricity Regulatory Commission;
(5) “day” means a day starting at 00.00 hours and ending at 24.00 hours.
(6) “detailed procedure” means the procedure issued under regulation 5;
(7) “Grid Code” means the State Grid Code specified by the Commission under
clause (h) of sub-section (1) of section 86 of the Act;
(8) “intra-State entity” means a person whose metering and energy accounting is
done by the State Load Despatch Centre or by any other authorised State Utility.
(9) “long term open access” means the use of the intra-State transmission and/or
distribution system for a period exceeding 12 years but not exceeding 25 years;
(10) “long term open access customer” means a person who has been granted long-
term open access;
(11) “medium term open access” means the use of the intra-State transmission
and/or distribution system for a period exceeding 3 months but not exceeding 3
years;
(12) “medium term open access customer” means a person granted medium-term
access;
(13) “month” means a calendar month as per the British calendar;
(14) “nodal agency” means the State Load Despatch Centre for arranging short-term
open access to any transmission and/or distribution system under these
regulations;
(15) “open access customer” means a person, who has availed or intends to avail of
open access under these regulations, and includes a short term open access
customer or a generating company (including the captive generating plant) or a
licensee or a consumer permitted by the Commission to receive supply of
electricity from a person other than distribution licensee of his area of supply, or
a State Government entity authorised to sell or purchase electricity;
(16) “open access in distribution” means the non-discriminatory provision for the
use of the distribution system and associated facilities by any licensee or
customer or person engaged in generation, in accordance with these regulations;
(17) “open access transaction” means a transaction for exchange of energy (MWh)
between a specified buyer and a specified seller, directly or through a trading
licensee, from a specified point of injection to a specified point of drawal for a
fixed or varying quantum of power (MW) for any time period during a month;
Compendium of HPERC Regulations, March 2021 3
(18) “open access in transmission” means the non-discriminatory provision for the
use of the transmission system and associated facilities by any licensee or
customer or person engaged in generation, in accordance with these regulations;
(19) “short term open access” means open access for a period upto one (1) month at
one time;
(20) “short term open access customer” means a person who has availed or intends
to avail short term open access;.
(21) “State” means the State of Himachal Pradesh;
(22) “State network” means network owned by the State Transmission Utility,
distribution licensee or any other person granted licence by the State
Commission to construct, operate and maintain the transmission system;
(23) “ Supply Code” means the Supply Code specified by the Commission under
section 50 and clause (x) of sub-section (2) of section 181 of the Act;
(24) “time block” means 15 minutes time period specified in the Grid Code for the
purposes of scheduling and despatch of power; and
(25) other words and expressions used in these regulations and not defined herein
but defined in the Act or the Grid Code or the Supply Code, shall have the
same meaning as are assigned to them in the Act, or the Grid Code, or the
Supply Code, as the case may be.
CHAPTER-II
SHORT TERM OPEN ACCESS IN INTRA-STATE TRANSMISSION
Previous and next
Questions people ask
Is regulation 2 of the Himachal Pradesh Electricity Regulatory Commission (Short Term Open Access) Regulations, 2010 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Short Term Open Access) Regulations, 2010 is recorded.