LawGrids logoLAWGRIDS.ORG

Regulation 2, The Himachal Pradesh Electricity Regulatory Commission (Short Term Open Access) Regulations, 2010: Definitions

The Himachal Pradesh Electricity Regulatory Commission (Short Term Open Access) Regulations, 2010 - Regulation 2

Text of regulation 2

Definitions

2. Definitions.- In these regulations, unless the context otherwise requires, – (1) “Act” means the Electricity Act, 2003 (36 of 2003); (2) “applicant” means a person who makes an application for availing short term open access to any transmission and/or distribution system within the State in accordance with these regulations; 1 Published in R H.P. dated 3 rd June, 2010 at p . 1093-1104. 2 Corrected for “2 May, 2010” vide Corrigendum dated 14 th June, 2010 published in R H.P. 15 th June, 2010 at p. 1350. 2 Compendium of HPERC Regulations, March 2021 (3) “captive generating customer” means a person who has constructed a captive generating plant and maintains and operates such plant and requires short term open access for the purpose of carrying electricity from his captive generating plant to the destination of his use; (4) “Commission” means the Himachal Pradesh Electricity Regulatory Commission; (5) “day” means a day starting at 00.00 hours and ending at 24.00 hours. (6) “detailed procedure” means the procedure issued under regulation 5; (7) “Grid Code” means the State Grid Code specified by the Commission under clause (h) of sub-section (1) of section 86 of the Act; (8) “intra-State entity” means a person whose metering and energy accounting is done by the State Load Despatch Centre or by any other authorised State Utility. (9) “long term open access” means the use of the intra-State transmission and/or distribution system for a period exceeding 12 years but not exceeding 25 years; (10) “long term open access customer” means a person who has been granted long- term open access; (11) “medium term open access” means the use of the intra-State transmission and/or distribution system for a period exceeding 3 months but not exceeding 3 years; (12) “medium term open access customer” means a person granted medium-term access; (13) “month” means a calendar month as per the British calendar; (14) “nodal agency” means the State Load Despatch Centre for arranging short-term open access to any transmission and/or distribution system under these regulations; (15) “open access customer” means a person, who has availed or intends to avail of open access under these regulations, and includes a short term open access customer or a generating company (including the captive generating plant) or a licensee or a consumer permitted by the Commission to receive supply of electricity from a person other than distribution licensee of his area of supply, or a State Government entity authorised to sell or purchase electricity; (16) “open access in distribution” means the non-discriminatory provision for the use of the distribution system and associated facilities by any licensee or customer or person engaged in generation, in accordance with these regulations; (17) “open access transaction” means a transaction for exchange of energy (MWh) between a specified buyer and a specified seller, directly or through a trading licensee, from a specified point of injection to a specified point of drawal for a fixed or varying quantum of power (MW) for any time period during a month; Compendium of HPERC Regulations, March 2021 3 (18) “open access in transmission” means the non-discriminatory provision for the use of the transmission system and associated facilities by any licensee or customer or person engaged in generation, in accordance with these regulations; (19) “short term open access” means open access for a period upto one (1) month at one time; (20) “short term open access customer” means a person who has availed or intends to avail short term open access;. (21) “State” means the State of Himachal Pradesh; (22) “State network” means network owned by the State Transmission Utility, distribution licensee or any other person granted licence by the State Commission to construct, operate and maintain the transmission system; (23) “ Supply Code” means the Supply Code specified by the Commission under section 50 and clause (x) of sub-section (2) of section 181 of the Act; (24) “time block” means 15 minutes time period specified in the Grid Code for the purposes of scheduling and despatch of power; and (25) other words and expressions used in these regulations and not defined herein but defined in the Act or the Grid Code or the Supply Code, shall have the same meaning as are assigned to them in the Act, or the Grid Code, or the Supply Code, as the case may be. CHAPTER-II SHORT TERM OPEN ACCESS IN INTRA-STATE TRANSMISSION

Previous and next

All provisions of The Himachal Pradesh Electricity Regulatory Commission (Short Term Open Access) Regulations, 2010

Questions people ask

Is regulation 2 of the Himachal Pradesh Electricity Regulatory Commission (Short Term Open Access) Regulations, 2010 still in force?

No repeal of the Himachal Pradesh Electricity Regulatory Commission (Short Term Open Access) Regulations, 2010 is recorded.