LawGrids logoLAWGRIDS.ORG

Section 92, The Guwahati Metropolitan Drinking Water and Sewerage Board Act, 2009: Permission of Board required for works to be carried out by other public authorities

The Guwahati Metropolitan Drinking Water and Sewerage Board Act, 2009 (10 of 2009) - Section 92

Text of section 92

Permission of Board required for works to be carried out by other public authorities

92. (1) A railway, telegraph line, electric line or street can be constructed and structure of any kind can be erected on any drain or any water works constructed or maintained by or vested in the Board, only after obtaining written permission from the Board. (2) If any, telegraph line, electric line or street be constructed or any other Structure is erected on any drain or any water works as aforesaid without the written permission of the Board, the Board may remove or otherwise deal with the same as it deems fit. (3) The expenses incurred by the Board in so doing shall be paid by the owner of the street or of the structure or as the case may be, by electricity administration or the person offending and shall be recovered in accordance with the rules which may be specified under this Act.

Previous and next

All sections of The Guwahati Metropolitan Drinking Water and Sewerage Board Act, 2009

Questions people ask

Is section 92 of the Guwahati Metropolitan Drinking Water and Sewerage Board Act, 2009 still in force?

No repeal of the Guwahati Metropolitan Drinking Water and Sewerage Board Act, 2009 is recorded.