LawGrids logoLAWGRIDS.ORG

Form D, Building Bye laws 2008: Form-D

Building Bye laws 2008 - Form D

Text of form D

Form-D

Form-D Application for Completion Certificate of Layout Plan (Bye-laws No. 2.1.8) ………………………………………………..Development Authority Part-A 1. (i) Name of Applicant…………………………………………… (ii) Present Address……………………………………………….. 2. Khasra/Plot No. and Name of Scheme /Locality / Ward…………………………………………………….. 3. Area of plot( in sq meters)……………………………………………………… 4. Permissible land-use………………………………………….. i. Date of Approval of lay-out Plan…………………………………………….. ii. Permit No. ……………………………………………… iii. In case unauthorized development has been got compounded, copy of Completion plan may be enclosed giving details of Receipt No. and Date of deposit of Completion Fee. ……………………………………………….. 5. Details of Land-Use S No. Category of land-use As per approved plan Developed Deviation Area (sq mts) Percentage Area (sq mts) Percentage Area (sq mts) Percentage 1. 2. 3. 4. 5. 6. 7. 8. (i) (ii) (iii) (iv) (v) Residential Commercial Other Park and Open Space Roads and Streets 6. Position of Facilities S No. Facilities Provision in approved plan Provision in Completion Plan No. Area(sq mt) Complete Incomplete No. Area(sq mt) No. Area(sq mt i. Primary school ii. Higher Secondary School iii. Degree College iv. Dispensary v. Hospital vi. Post Office vii. Community Centre viii. Police Station ix. Fire Station x. Telephone Exchange xi. Bus Station xii. Taxi Stand xiii. Public Utilities xiv. Other facilities 7. Following development may be recorded on Layout Plan:- i. Roads ii. Tree plantation on sides of roads(Arboriculture) iii. Culvert iv. Street lightning v. Drinking water distribution system in which service valves, air value, fire hydrants are shown and diameter of underground water pipes are recorded. vi. Location of overhead tank and underground with wires and their capacity, number of pumps and their capacity. vii. Sewer System in which diameter of pipe, location of man holes and street pits giving invert level. viii. Location of sewage pumping station, its capacity and number of pumps and capacity (if the self development has been undertaken by the developer). ix. Arrangement for drainage of rainwater. x. Electricity Supply System, in which location of transformers and 11 K.V.A sub-station and capacity of transformers is recorded. xi. Final disposal of sewer- details of connection with the Trunk Sewer Line of Development Authority / Housing and Development Board / Local Body etc. xii. Ground water recharging system. 8. Position / Arrangement of connection with infrastructure system of the city i. Roads ii. Drainage of water (arrangement of connection with the trunk drain ). iii. Arrangement of drinking water (arrangement of connection with the Jan Sansthan / Development Authority / Local body, etc.) iv. Electricity arrangement (position of connection with the 33 K.V.A. / 11K.V.A. line and position of transformers. v. Position of connection with the Sewer / Trunk Sewer. 9. Internal alterations in Lay-out Plan i. Is/ is not under the Bye-laws Yes / No ii. If in contravention of bye-laws, the same has been compounded Yes / No OR Revised Plan is approved (If yes, Enclose the certificate) Yes / No 10. Information with regard to standards and specification of development work There has been no deviation in Standards and Specification of development works approved with Layout Plan. OR There is deviation in Standards and Specifications of development works, the approval for which has been obtained from department concerned (certificate is enclosed). Now there is no such deviation as is not approved by the competent authority. Certificate by applicant Certified that the above statement is true as per my / our personal knowledge. The distribution of the land-use in Layout Plan is in accordance with the plan approved by the Development Authority. All facilities and development are as per the contract. Therefore, completion certificate of the above said layout plan may please be issued to me or/us. Enclosed Documents 1. 2. 3. Date: Signature of Applicant Authorized for Application NOTE: The above information will be given only by the person authorized for application. Certificate of authorization will be enclosed. Part-B Appendix-3 Certificate of Registered Architect / Town Planner (For layout plan) I have inspected the area located at ……………………………………..ward /……………………………. scheme of Shri / Smt.…………………………………………. (Name of Applicant) on…………………………….. (date) and all information given above has been found correct after spot enquiry. In this context my enquiry report is as under:- All development works are in conformity with the standards and specifications, pre- determined and approved by (Name of authority) ……………………………………….Development Authority. OR Development scheme is in conformity with the layout plan approved by the Development Authority-applicable Bye- laws. OR There is a deviation from approved layout plan in the developed scheme, which has been recorded at the serial number- 9 and Compoundable deviation has been got compounded. In view of the above circumstances, it is recommended to issue completion certificate. Signature Name & Address of Registered Architect/ Town Planner ……………………………………………… License no……………………………………………… Date of Validity of License………………………………………… Date: Part-C Certificate of Registered licensed person in regard to the rain water harvesting (For layout plan) In the developed the scheme provision of rainwater harvesting (ground water recharging system) is in conformity with the layout plan approved by the Development Authority / applicable Bye-laws. Signature Name & Address of Registered Licensed person ……………………………………………… License no……………………………………………… Date of Validity of License………………………………………… Date: Part-D Finding of Development Authority and Completion Certificate (To be issued on the photocopy of part ‘A’,’B’ and ‘C’ of the Application) The above certificate given in respect of developed scheme on plot number………………………….. situated in ………………………………….ward / scheme/ locality / sector coma has been examined by Shri………………………………,( designation)………………………………………, Development Authority on……………………………….. (date) and the same has been found correct in accordance with the layout plan approved by the Authority. Therefore, Completion Certificate is issued in accordance with the section 15 ka (2) of UP Urban Planning and Development Act-1973. Signature…………………………………………. Designation……………………………………… (Seal of Office) Appendix-4 Form of application for Construction/ Re-Construction or Alternate in the Building. (Bye-law No.-3.1.2) To, …………………………………………… ……………………………………………. Sir, I hereby apply for construction or alteration in the Building number………………………………… on plot number………………………………….. Shazra no………………………………. , Locality/ Bazaar……………………………. colony / Street……………………………………… City …………………………………under Building Constructions Bye-law number 3.1.2 and for this purpose submit plan and specification (item number 1 to 4) in four copies, which are duly signed by me and licensed technical person………………………………(Name in Block letters), License number………………………………… who will supervise this construction and other declarations and required form (item number 5 to 6) are also enclosed. 1. Site Plan 2. Building Plan 3. Plan for Services 4. General Specifications 5. Certificate of Land ownership 6. Photocopy of Receipt of Application Fee. Kindly approve the above construction and grant permission for execution of work. Signature of Owner………………………………………. Name of Owner…………………………………………. Address of Owner…………………………………… ……………………………………………………………………….. Date : ……………………………………….. Appendix-5 Form for giving information of commencement of Building Construction (Bye-law No.-3.1.6) To, ………………………………………… ………………………………………… ………………………………………… …………………………………………. Sir, I hereby certify that construction/ re-construction/ or alteration in my Building number………………………………… Sazra no………………………………. ,located at ……………………………. colony / Street……………………………………… Locality/ Bazaar, City …………………………………will commence on ………………………………(date) in accordance with the plan No………………………….., approved by the Licensed technical person………………………………(Name ), License number………………………………… Signature of owner of the Building Name of Owner of Building…………………… Address of Owner………………………………… Of Building………………………………………….. Date: ………………………………………………….. Appendix-6 (Form ’A’ - PAGE 1/4) Form ’A’ Application form for completion Certificate of Residential Building (For residential building on the plot of area of more than 300 square meters only) (Bye-law No.-3.18) ……………………………………Development Authority Part-A 1. (i) Name of Applicant (ii) Present Address 2. Plot No. and Name of Scheme/ Locality/ Ward No. 3. Area of Plot (in sq meters) 4. Permissible use of building 5. (i) Date of approval of Building plan (ii) Permit No. (iii) If auto approved, give details of the Provision along with other relevant details which may prove that this matter covered by provision for auto approval and the prescribed conditions have been met. 6. (i) If unauthorized construction has been compounded, give no. and date of approval of Completion Plan (ii) Date/ Dates and Receipt No./Nos. of Payment of Completion Fee, also enclose certified copy of Completion Plan Receipt No. Date: 7. Position of Construction (Builder to give details as per approved plan/ Completion plan , whichever is applicable) S No. Provisions Permissible Built Approved/ Compounded 1. 2. 3. 4. 5. 7.1 Set-Back(in meters) a) Front b) Rear c) Right d) Left 7.2 Basement(area in sq meters) 7.3 Amenities (yes/no) a) Water Supply (Yes/ No) b) Sewage (Yes/ No) c) Drainage (Yes/ No) d) Electricity supply (Yes/ No) e) Rooftop rain water harvesting system (Yes/ No) f) Solar Water heating plant( in plots (Yes/ No) Of area of more than 500 sq meters) 7.4 Internal alternations in the building:- a) Under Building Bye-laws (Yes/ No) b) If in contravention of bye-laws, the same is compounded (Yes/ No) Appendix-6 (Form ’A’ - PAGE 2/4) 8. Certified that the above details are true as per may/ our personal knowledge. There is no such unauthorized construction as has not been compounded. Therefore, completion Certificate carried out in the above building. Enclosed documents: 1. 2. 3. Signatures of applicant Authorized for applying (with the proof of authorization) Date:- Appendix-6 (Form ’A’ - PAGE 3/4) Certificate of Registered Architect/ Engineer (For residential building) Part-B I have inspected the Building No………………………………(with Address) ………………………………………of Shri / Smt.…………………………………………. (Name of Applicant) on…………………………….. (date). All the information given above has been found correct after spot enquiry. In inferences of my enquiry are as under:- i. Built Building is in accordance with plan approved by the Development Authority/ approved compounding plan. OR ii. Any deviation from approved plan or approved compounding plan in the building has been given in serial number 7. OR iii. The portion in the building which was not compoundable has been demolished. Rest of the construction is in accordance with the approved plan / compounding plan. In the above circumstances coma completion certificate is recommended to be issued. Signature …………………………………… Name & address…………………………….. Of registered ……………………………………. Architect/Engineer…………………………….. Registration No. Of Council of Architecture/ License No. …………………… Period of validity Of License …………………………………………… Date: Part-C Certificate of Registered Licensed person regarding Rain Water Harvesting (For residential building) Provisions of Rainwater harvesting (rooftop rainwater harvesting system) has been done in the building constructed in compliance of Building Plan approved by the Development Authority / applicable Bye laws. Signature ……………………….. Name & Address of Registered……………………….. Licensed Person…………………. License No…………………………. Date:- Appendix-6 (Form ’A’ - PAGE 4/4) Confirmation and Completion certificate of Development Authority (To be issued on photocopy of Part ‘A’, ’B’ and ‘C’ of the application) Part-D The above certificate given in respect of the building constructed on plot number……………………………… situated in…………………………………………. / scheme / locality / sector…………………………………… has been examined by Shri………………………………………………….(Designation)…………………………………, Development Authority and has been found correct according to the plan approved by the Authority. Therefore, completion certificate is issued in accordance with the section 15 ka (2)of UP Urban Planning and Development Act, 1973. OR There is no need of spot inspection / verification in view of following reasons. Therefore, Completion Certificate is issued on the basis of certificate submitted by Architect / Engineer. 1. 2. Signature ………………………………….. Designation ………………………………. Seal OF Office …………………………… Date…………………………………………… Appendix-6 (Form ’B’ - PAGE 1/4) Form’B’ Form of application for Completion Certificate of Group Housing, Commercial and Multi storey Building (Bye-law No. 3.1.8) …………………………………. Development Authority Part-A 1. (i) Name of Applicant (ii) Present Address 2. Plot No. and Name of Scheme/ Locality/ Ward No. 3. Area of Plot (in sq meters) 4. Permissible use of building 5. (i) Date of approval of Building plan (ii) Permit No. (iii) If auto approved, the details of provision If information of rejection of Building Plan is Not given within the prescribed period from Date of submission of Building Plan:- Receipt No. and Date of submission of Plan. Attach attested copy of the receipt. 6. (i) If unauthorized construction has been got compounded, attach copy of Completion plan. (ii) Receipt No. and date of payment of Completion fee and attach attested copy of The Receipt. 7. Position of Construction (Builder to give details as per approved plan/ Completion plan , whichever is applicable) S No. Provisions Permissible Built Approved/ Compounded deviation 1. 2. 3. 4. 5. 7.1 Land Coverage(Percentage) 7.2 F.A.R 7.3 Set-Back(in meters) a) Front b) Rear c) Right d) Left S No. Provisions Permissible Built Approved/ Compounded deviation 1. 2. 3. 4. 5. 7.4 (a) basement Area (in sq meters) (b) Usage of Basement 7.5 Stilt Floor (a) Area (b) Usage 7.6 Parking (Area in sq meters) 7.7 Height of Buildings (in meters) 7.8 No. of Storeys 8. Works related to Fire fighting (Attach certificate of Completion Of Fire Fighting System from Chief Fire Officer). 9. Amenities to be shown on plan: (a) Water Supply (b) Sewage (c) Drainage Appendix-6 (Form ’B’ - PAGE 2/4) (d) Solar Water Plant (e) Electricity Supply (f) Lift (Attach certificate of Completion Of lift from Chief Electrical inspector, U.P.). 10. Garbage shoot (Yes/No.) 11. Aviation Lights if situated in the Aviation Area (installed/ Not-installed) 12. Rain Water harvesting System (attach certificate of Registered Licensed Technical person) (Yes/No) 13. Internal Alterations in the building (a) Under the Bye- laws (Yes/ No) (b) If in contravention off Bye-laws, the same has been compounded (Yes/No) Certified that the above details are true according to my/ our personal knowledge. There is no such unauthorized construction under the Building Bye-Laws as has not been compounded . Completion Certificate for construction on the above plot may please be issued. Enclosed documents: 1. 2. 3. Signatures of applicant Authorized for applying (with certificate of having been authorized) Date:- NOTE: 1. The above information will be given only by the person authorised for making application. The certificate of having been authorized will be enclosed. 2. Separate application will have to be submitted for each block in Building Complex. Appendix-6 (Form ’B’ - PAGE 3/4) Part-B Certificate of Registered Architect/ Engineer (For of Group Housing, Commercial and Multi storey Building) Certified that construction / re-construction / alternation / modification of work in Building number …………………………… are situated at plot number ………………………………..khasra number…………………………………., of Shri / Smt. ……………….(Name of applicant) has been done in my supervision. All information’s given above are correct. In this regard my report is as under:- The constructed building is in accordance with applicable Bye-laws and approved plan/ approved compounding plan. OR Any deviation from approved Plan / approved compounding Plan in the building constructed has been given in serial number 7. The building is adequate for the purpose for which it has been constructed / re-constructed / altered. It is of high quality and is safe on the basis of structure. The building is fully adequate and safe for inhabitation. Therefore, issuance of completion certificate is recommended. Signature …………………………………… Name & address…………………………….. Of registered ……………………………………. Architect/Engineer…………………………….. Registration No. Of Council of Architecture/ License No. …………………… Period of validity Of License …………………………………………… Date: Part-C Certificate of Registered Licensed person regarding Rain Water Harvesting (For of Group Housing, Commercial and Multi storey Building) The provision of Rainwater harvesting (Rooftop Rainwater harvesting system) has been made in the building constructed in accordance with the Building Plan approved by the Development Authority / applicable Bye-laws. Signature ……………………….. Name & Address of Registered……………………….. Licensed Person…………………. License No…………………………. Date:- Appendix-6 (Form ’B’ - PAGE 4/4) Part-D Confirmation and Completion Certificate of Development Authority (To be issued on photocopy of Part ‘A’, ’B’ and ‘C’ of the application) The above certificate given in respect of building constructed on plot number…………………………………. situated in ……………………………………..(ward / scheme / locality / sector) has been examined by Shri ……………………………………………….. (designation), Development Authority and the construction has been found correct according to the plan approved by the Authority on ………………………………..(date). Therefore Completion Certificate is issued in accordance with Section-15 ka (2) of UP Urban Planning and Development Act, 1973. Signature ………………………………….. Designation ………………………………. Seal OF Office …………………………… Date…………………………………………… Appendix-6 (Form ’C’ - PAGE 1/4) Form-‘C’ Application form for Completion Certificate of Buildings other than Residential, Group Housing, Commercial and Multi Storey buildings. (Bye-law No. 3.1.8) …………………………………. Development Authority Part-A 1. (i) Name of Applicant (ii) Present Address 2. Plot No. and Name of Scheme/ Locality/ Ward No. 3. Area of Plot (in sq meters) 4. Permissible use of building 5. (i) Date of approval of Building plan (ii) Permit No. (iii) If auto approved, the details of provision If information of rejection of Building Plan is Not given within the prescribed period from Date of submission of Building Plan:- Receipt No. and Date of submission of Plan. Attach attested copy of the receipt. 6. (i) If unauthorized construction has been got compounded, attach copy of Compounding plan. (ii) Receipt No. and date of payment of Completion fee (iii) Attach attested copy of the same. 7. Position of Construction (Builder to give details as per approved plan/ Completion plan , whichever is applicable) S No. Provisions Permissible Built Approved/ Compounded deviation 1. 2. 3. 4. 5. 7.1 Ground Coverage(Percentage) 7.2 F.A.R 7.3 Set-Back(in meters) a) Front b) Rear c) Right d) Left e) Basement(Area in sq meters) 7.4 Amenities a) Water supply Yes/No b) Sewage Yes/No c) Drainage Yes/No d) Electricity Supply Yes/No 8. Internal Alterations in the building (a) Within the Bye- laws (Yes/ No) (b) If in contravention off Bye-laws, the same has been compounded (Yes/No) Appendix-6 (Form ’C’ - PAGE 2/4) Certified that the above details are true according to my/ our personal knowledge. There is no such unauthorized construction under the Building Bye-Laws as has not been compounded. Completion Certificate for construction on the above plot may please be issued. Enclosed documents: 1. 2. 3. Signatures of applicant Authorized for making application (with certificate) Date:- NOTE: 1. The above information will be given only by the person authorised for making application. The certificate of having been authorized will be enclosed. 2. Separate application will have to be submitted for each block in Building Complex. Appendix-6 (Form ’C’ - PAGE 3/4) Part-B Certificate of Registered Architect/ Engineer (For of Group Housing, Commercial and Multi storey Building) Certified that construction / re-construction / alternation / modification of work in Building number …………………………… are situated at plot number ………………………………..khasra number…………………………………., of Shri / Smt. ……………………………….(Name of applicant) has been done in my supervision. All information’s given above are correct. In this regard my report is as under:- The constructed building is in accordance with applicable Bye-laws and approved plan/ approved Compounding plan. OR Any deviation from approved Plan / approved Compounding Plan in the building constructed has been given in serial number 7. The building is appropriate for the purpose for which it has been constructed / re-constructed / altered. It is of high quality and is safe on the basis of structure. The building is fully adequate and safe for inhabitation. Therefore, issuance of completion certificate is recommended. Signature …………………………………… Name & address…………………………….. Of registered ……………………………………. Architect/Engineer…………………………….. Registration No. Of Council of Architecture/ License No. …………………… Period of validity Of License …………………………………………… Date: Part-C Certificate of Registered Licensed person regarding Rain Water Harvesting (For of Group Housing, Commercial and Multi storey Building) The provision of Rainwater harvesting (Rooftop Rainwater harvesting system) has been made in the building constructed in accordance with the Building Plan approved by the Development Authority / applicable Bye-laws. Signature ……………………….. Name & Address of Registered……………………….. Licensed Person…………………. License No…………………………. Date:- Appendix-6 (Form ’C’ - PAGE 4/4) Part-D Confermation and Completion Certificate of Development Authority (To be issued on photocopy of Part ‘A’, ’B’ and ‘C’ of the application) The above certificate given in respect of building constructed on plot number…………………………………. situated in ……………………………………..(ward / scheme / locality / sector) has been examined by Shri ……………………………………………….. (designation), Development Authority and the construction has been found correct according to the plan approved by the Authority on ………………………………..(date). Therefore Completion Certificate is issued in accordance with Section-15 ka (2) of UP Urban Planning and Development Act, 1973. Signature ………………………………….. Designation ………………………………. Seal OF Office …………………………… Date…………………………………………… Appendix-12 Eligibility of Structural Engineers on the basis of Construction Work and Earthquake Zone (Bye-law No.-13.5) Category of Work Category- wise limit of construction works-for structural designing of which engineers designated in column 4&5 will be authorized. Earthquake zones where constructions will be situated Minimum experience of supervision of designing and construction of multi-storey buildings and related infrastructure engineer(in years) Other Details For Graduate Civil Engineer For Post Graduate Structural Engineer 1. 2. 3. 4. 5. 6. (A) For multi storey buildings of maximum 4 storey or height of 12 meters or covered area upto 2500 sq meters/ important infrastructure facilities i. Upto Zone 3 ii. Zone 4&5 3 5 1 3 - - (B) For multi-storey buildings of maximum 8 storey or 24 meters height or covered area upto 5000 sq meters/ important infrastructure facilities i. Upto Zone 3 ii. Zone 4&5 7 9 5 7 - - (C) For multi-storey buildings of maximum 8 storey or height more than 24 meters or covered area upto 5000 sq meters/ important infrastructure facilities From zone 1 to 5 10 8 Structural design will have to be got counter- signed by professor of Structural Engineering of I.I.T, Roorkee University or any other designated Technical Institute. Appendix-13 Eligibility of site Civil Engineer for supervision of Construction works (Rule no.-13.5) Category of Work Category- wise limit of construction works-for structural designing of which engineers designated in column 4&5 will be authorized. Earthquake zones where constructions will be situated Minimum experience of supervision of designing and construction of multi-storey buildings and related infrastructural facilities Other Details For Graduate Civil Engineer For Post Graduate Structural Engineer 1. 2. 3. 4. 5. 6. (A) For multi storey buildings of maximum 4 storey or height of 12 meters or covered area upto 2500 sq meters/ important infrastructure facilities iii. Upto Zone 3 iv. Zone 4&5 6 10 3 5 For each 2500 square meter covered area , one site engineer of prescribed eligibility will be posted for supervision. (B) For multi-storey buildings of maximum 8 storey or 24 meters height or covered area upto 5000 sq meters/ important infrastructure facilities iii. Upto Zone 3 iv. Zone 4&5 Not authorized As above 6 10 As above (C) For multi-storey buildings of maximum 8 storey or height more than 24 meters or covered area upto 5000 sq meters/ important infrastructure facilities From zone 1 to 5 As above 15 As above Appendix-14 Classification Of Expert Inspecting Civil Engineers (Bye-law No. 13.5) Category of Work Category- wise limit of construction works-for structural designing of which engineers designated in column 4&5 will be authorized. Earthquake zones where constructions will be situated Minimum experience of supervision of designing and construction of multi- storey buildings and related infrastructural facilities Other Details For Graduate Civil Engineer For Post Graduate Structural Engineer 1. 2. 3. 4. 5. (A) For multi storey buildings of maximum 4 storey or height of 12 meters or covered area upto 2500 sq meters/ important infrastructure facilities i. Upto Zone 3 ii. Zone 4&5 5 7 - (B) For multi-storey buildings of maximum 8 storey or 24 meters height or covered area upto 5000 sq meters/ important infrastructure facilities i. Upto Zone 3 ii. Zone 4&5 8 10 (C) For multi-storey buildings of maximum 8 storey or height more than 24 meters or covered area upto 5000 sq meters/ important infrastructure facilities From zone 1 to 5 15 For inspection of these construction works, joint panel of two serving/ retired experts will be deputed, out of which one except should have been of minimum level of Chief Engineer/ Equivalent in the Engineering department/ under taking of state/ central government and the second expert will be of the level of Professor in civil Engineering Deptt. Of any designated Technical Institute as far as possible. In case of non-availability of these, both the experts will be of the level of Chief Engineer/Equivalent.

Previous and next

All provisions of Building Bye laws 2008

Questions people ask

Is form D of Building Bye laws 2008 still in force?

No repeal of Building Bye laws 2008 is recorded.