Form D, Building Bye laws 2008: Form-D
Building Bye laws 2008 - Form D
Text of form D
Form-D
Form-D
Application for Completion Certificate of Layout Plan
(Bye-laws No. 2.1.8)
………………………………………………..Development Authority
Part-A
1. (i) Name of Applicant……………………………………………
(ii) Present Address………………………………………………..
2. Khasra/Plot No. and Name of Scheme /Locality / Ward……………………………………………………..
3. Area of plot( in sq meters)………………………………………………………
4. Permissible land-use…………………………………………..
i. Date of Approval of lay-out Plan……………………………………………..
ii. Permit No. ………………………………………………
iii. In case unauthorized development has been
got compounded, copy of Completion plan may
be enclosed giving details of Receipt No. and
Date of deposit of Completion Fee. ………………………………………………..
5. Details of Land-Use
S No. Category of
land-use
As per approved plan Developed Deviation
Area (sq
mts)
Percentage
Area (sq
mts)
Percentage Area (sq
mts)
Percentage
1. 2. 3. 4. 5. 6. 7. 8.
(i)
(ii)
(iii)
(iv)
(v)
Residential
Commercial
Other
Park and
Open Space
Roads and
Streets
6. Position of Facilities
S No. Facilities Provision in approved
plan
Provision in Completion Plan
No. Area(sq mt) Complete Incomplete
No. Area(sq
mt)
No. Area(sq
mt
i. Primary school
ii. Higher Secondary School
iii. Degree College
iv. Dispensary
v. Hospital
vi. Post Office
vii. Community Centre
viii. Police Station
ix. Fire Station
x. Telephone Exchange
xi. Bus Station
xii. Taxi Stand
xiii. Public Utilities
xiv. Other facilities
7. Following development may be recorded on Layout Plan:-
i. Roads
ii. Tree plantation on sides of roads(Arboriculture)
iii. Culvert
iv. Street lightning
v. Drinking water distribution system in which service valves, air value, fire hydrants are shown and
diameter of underground water pipes are recorded.
vi. Location of overhead tank and underground with wires and their capacity, number of pumps and their
capacity.
vii. Sewer System in which diameter of pipe, location of man holes and street pits giving invert level.
viii. Location of sewage pumping station, its capacity and number of pumps and capacity (if the self
development has been undertaken by the developer).
ix. Arrangement for drainage of rainwater.
x. Electricity Supply System, in which location of transformers and 11 K.V.A sub-station and capacity of
transformers is recorded.
xi. Final disposal of sewer- details of connection with the Trunk Sewer Line of Development Authority /
Housing and Development Board / Local Body etc.
xii. Ground water recharging system.
8. Position / Arrangement of connection with infrastructure system of the city
i. Roads
ii. Drainage of water (arrangement of connection with the trunk drain ).
iii. Arrangement of drinking water (arrangement of connection with the Jan Sansthan / Development
Authority / Local body, etc.)
iv. Electricity arrangement (position of connection with the 33 K.V.A. / 11K.V.A. line and position of
transformers.
v. Position of connection with the Sewer / Trunk Sewer.
9. Internal alterations in Lay-out Plan
i. Is/ is not under the Bye-laws Yes / No
ii. If in contravention of bye-laws, the same has been compounded Yes / No
OR
Revised Plan is approved (If yes, Enclose the certificate) Yes / No
10. Information with regard to standards and specification of development work
There has been no deviation in Standards and Specification of development works approved with Layout Plan.
OR
There is deviation in Standards and Specifications of development works, the approval for which has been
obtained from department concerned (certificate is enclosed). Now there is no such deviation as is not
approved by the competent authority.
Certificate by applicant
Certified that the above statement is true as per my / our personal knowledge. The distribution of the land-use
in Layout Plan is in accordance with the plan approved by the Development Authority. All facilities and
development are as per the contract. Therefore, completion certificate of the above said layout plan may please
be issued to me or/us.
Enclosed Documents
1.
2.
3.
Date:
Signature of Applicant Authorized for Application
NOTE: The above information will be given only by the person authorized for application. Certificate of
authorization will be enclosed.
Part-B Appendix-3
Certificate of Registered Architect / Town Planner
(For layout plan)
I have inspected the area located at ……………………………………..ward /……………………………. scheme of Shri /
Smt.…………………………………………. (Name of Applicant) on…………………………….. (date) and all information given above has
been found correct after spot enquiry. In this context my enquiry report is as under:-
All development works are in conformity with the standards and specifications, pre- determined and approved by
(Name of authority) ……………………………………….Development Authority.
OR
Development scheme is in conformity with the layout plan approved by the Development Authority-applicable Bye-
laws.
OR
There is a deviation from approved layout plan in the developed scheme, which has been recorded at the serial number-
9 and Compoundable deviation has been got compounded.
In view of the above circumstances, it is recommended to issue completion certificate.
Signature Name & Address of
Registered
Architect/ Town Planner
………………………………………………
License
no………………………………………………
Date of Validity of
License…………………………………………
Date:
Part-C
Certificate of Registered licensed person in regard to the rain water harvesting
(For layout plan)
In the developed the scheme provision of rainwater harvesting (ground water recharging system) is in conformity with
the layout plan approved by the Development Authority / applicable Bye-laws.
Signature Name & Address of
Registered
Licensed person
………………………………………………
License
no………………………………………………
Date of Validity of
License…………………………………………
Date:
Part-D
Finding of Development Authority and Completion Certificate
(To be issued on the photocopy of part ‘A’,’B’ and ‘C’ of the Application)
The above certificate given in respect of developed scheme on plot number………………………….. situated in
………………………………….ward / scheme/ locality / sector coma has been examined by Shri………………………………,(
designation)………………………………………, Development Authority on……………………………….. (date) and the same has been
found correct in accordance with the layout plan approved by the Authority. Therefore, Completion Certificate is issued
in accordance with the section 15 ka (2) of UP Urban Planning and Development Act-1973.
Signature………………………………………….
Designation………………………………………
(Seal of Office)
Appendix-4
Form of application for Construction/ Re-Construction or Alternate in the Building.
(Bye-law No.-3.1.2)
To,
……………………………………………
…………………………………………….
Sir,
I hereby apply for construction or alteration in the Building number………………………………… on plot
number………………………………….. Shazra no………………………………. , Locality/ Bazaar……………………………. colony /
Street……………………………………… City …………………………………under Building Constructions Bye-law number 3.1.2 and for
this purpose submit plan and specification (item number 1 to 4) in four copies, which are duly signed by me and licensed
technical person………………………………(Name in Block letters), License number………………………………… who will supervise
this construction and other declarations and required form (item number 5 to 6) are also enclosed.
1. Site Plan
2. Building Plan
3. Plan for Services
4. General Specifications
5. Certificate of Land ownership
6. Photocopy of Receipt of Application Fee.
Kindly approve the above construction and grant permission for execution of work.
Signature of Owner……………………………………….
Name of Owner………………………………………….
Address of Owner……………………………………
………………………………………………………………………..
Date : ………………………………………..
Appendix-5
Form for giving information of commencement of Building Construction
(Bye-law No.-3.1.6)
To,
…………………………………………
…………………………………………
…………………………………………
………………………………………….
Sir,
I hereby certify that construction/ re-construction/ or alteration in my Building number………………………………… Sazra
no………………………………. ,located at ……………………………. colony / Street……………………………………… Locality/ Bazaar, City
…………………………………will commence on ………………………………(date) in accordance with the plan No…………………………..,
approved by the Licensed technical person………………………………(Name ), License number…………………………………
Signature of owner of the Building
Name of Owner of
Building……………………
Address of
Owner…………………………………
Of Building…………………………………………..
Date: …………………………………………………..
Appendix-6
(Form ’A’ - PAGE 1/4)
Form ’A’
Application form for completion Certificate of Residential Building
(For residential building on the plot of area of more than 300 square meters only)
(Bye-law No.-3.18)
……………………………………Development Authority
Part-A
1. (i) Name of Applicant
(ii) Present Address
2. Plot No. and Name of Scheme/ Locality/ Ward No.
3. Area of Plot (in sq meters)
4. Permissible use of building
5. (i) Date of approval of Building plan
(ii) Permit No.
(iii) If auto approved, give details of the
Provision along with other relevant
details which may prove that this
matter covered by provision for auto
approval and the prescribed
conditions have been met.
6. (i) If unauthorized construction has been
compounded, give no. and date of approval
of Completion Plan
(ii) Date/ Dates and Receipt No./Nos. of
Payment of Completion Fee, also enclose
certified copy of Completion Plan
Receipt No.
Date:
7. Position of Construction (Builder to give details as per approved plan/ Completion plan , whichever is applicable)
S No. Provisions Permissible Built Approved/ Compounded
1. 2. 3. 4. 5.
7.1 Set-Back(in meters)
a) Front
b) Rear
c) Right
d) Left
7.2 Basement(area in sq meters)
7.3 Amenities (yes/no)
a) Water Supply (Yes/ No)
b) Sewage (Yes/ No)
c) Drainage (Yes/ No)
d) Electricity supply (Yes/ No)
e) Rooftop rain water harvesting system (Yes/ No)
f) Solar Water heating plant( in plots (Yes/ No)
Of area of more than 500 sq meters)
7.4 Internal alternations in the building:-
a) Under Building Bye-laws (Yes/ No)
b) If in contravention of bye-laws, the same is compounded (Yes/ No)
Appendix-6
(Form ’A’ - PAGE 2/4)
8. Certified that the above details are true as per may/ our personal knowledge. There is no such unauthorized
construction as has not been compounded. Therefore, completion Certificate carried out in the above building.
Enclosed documents:
1.
2.
3.
Signatures of applicant
Authorized for applying
(with the proof of authorization)
Date:-
Appendix-6
(Form ’A’ - PAGE 3/4)
Certificate of Registered Architect/ Engineer
(For residential building)
Part-B
I have inspected the Building No………………………………(with Address) ………………………………………of Shri /
Smt.…………………………………………. (Name of Applicant) on…………………………….. (date). All the information given above has
been found correct after spot enquiry. In inferences of my enquiry are as under:-
i. Built Building is in accordance with plan approved by the Development Authority/ approved compounding plan.
OR
ii. Any deviation from approved plan or approved compounding plan in the building has been given in serial
number 7.
OR
iii. The portion in the building which was not compoundable has been demolished. Rest of the construction is in
accordance with the approved plan / compounding plan.
In the above circumstances coma completion certificate is recommended to be issued.
Signature ……………………………………
Name & address……………………………..
Of registered …………………………………….
Architect/Engineer……………………………..
Registration No.
Of Council of
Architecture/ License No. ……………………
Period of validity
Of License ……………………………………………
Date:
Part-C
Certificate of Registered Licensed person regarding Rain Water Harvesting
(For residential building)
Provisions of Rainwater harvesting (rooftop rainwater harvesting system) has been done in the building constructed in
compliance of Building Plan approved by the Development Authority / applicable Bye laws.
Signature ………………………..
Name & Address of
Registered………………………..
Licensed Person………………….
License No………………………….
Date:-
Appendix-6
(Form ’A’ - PAGE 4/4)
Confirmation and Completion certificate of Development Authority
(To be issued on photocopy of Part ‘A’, ’B’ and ‘C’ of the application)
Part-D
The above certificate given in respect of the building constructed on plot number……………………………… situated
in…………………………………………. / scheme / locality / sector…………………………………… has been examined by
Shri………………………………………………….(Designation)…………………………………, Development Authority and has been found
correct according to the plan approved by the Authority. Therefore, completion certificate is issued in accordance with
the section 15 ka (2)of UP Urban Planning and Development Act, 1973.
OR
There is no need of spot inspection / verification in view of following reasons. Therefore, Completion Certificate is
issued on the basis of certificate submitted by Architect / Engineer.
1.
2.
Signature …………………………………..
Designation ……………………………….
Seal OF Office ……………………………
Date……………………………………………
Appendix-6
(Form ’B’ - PAGE 1/4)
Form’B’
Form of application for Completion Certificate of Group Housing, Commercial and Multi
storey Building
(Bye-law No. 3.1.8)
…………………………………. Development Authority
Part-A
1. (i) Name of Applicant
(ii) Present Address
2. Plot No. and Name of Scheme/ Locality/ Ward No.
3. Area of Plot (in sq meters)
4. Permissible use of building
5. (i) Date of approval of Building plan
(ii) Permit No.
(iii) If auto approved, the details of provision
If information of rejection of Building Plan is
Not given within the prescribed period from
Date of submission of Building Plan:-
Receipt No. and Date of submission of Plan.
Attach attested copy of the receipt.
6. (i) If unauthorized construction has been got
compounded, attach copy of Completion plan.
(ii) Receipt No. and date of payment of
Completion fee and attach attested copy of
The Receipt.
7. Position of Construction (Builder to give details as per approved plan/ Completion plan , whichever is applicable)
S No. Provisions Permissible Built Approved/ Compounded deviation
1. 2. 3. 4. 5.
7.1 Land Coverage(Percentage)
7.2 F.A.R
7.3 Set-Back(in meters)
a) Front
b) Rear
c) Right
d) Left
S No. Provisions Permissible Built Approved/ Compounded deviation
1. 2. 3. 4. 5.
7.4 (a) basement Area (in sq meters)
(b) Usage of Basement
7.5 Stilt Floor
(a) Area
(b) Usage
7.6 Parking (Area in sq meters)
7.7 Height of Buildings (in meters)
7.8 No. of Storeys
8. Works related to Fire fighting
(Attach certificate of Completion Of Fire Fighting System from Chief Fire Officer).
9. Amenities to be shown on plan:
(a) Water Supply
(b) Sewage
(c) Drainage
Appendix-6
(Form ’B’ - PAGE 2/4)
(d) Solar Water Plant
(e) Electricity Supply
(f) Lift
(Attach certificate of Completion Of lift from Chief Electrical inspector, U.P.).
10. Garbage shoot (Yes/No.)
11. Aviation Lights if situated in the Aviation Area (installed/ Not-installed)
12. Rain Water harvesting System
(attach certificate of Registered
Licensed Technical person) (Yes/No)
13. Internal Alterations in the building
(a) Under the Bye- laws (Yes/ No)
(b) If in contravention off Bye-laws, the same has been compounded (Yes/No)
Certified that the above details are true according to my/ our personal knowledge. There is no such unauthorized
construction under the Building Bye-Laws as has not been compounded . Completion Certificate for construction on
the above plot may please be issued.
Enclosed documents:
1.
2.
3.
Signatures of applicant
Authorized for applying
(with certificate of having been
authorized)
Date:-
NOTE:
1. The above information will be given only by the person authorised for making application. The certificate of
having been authorized will be enclosed.
2. Separate application will have to be submitted for each block in Building Complex.
Appendix-6
(Form ’B’ - PAGE 3/4)
Part-B
Certificate of Registered Architect/ Engineer
(For of Group Housing, Commercial and Multi storey Building)
Certified that construction / re-construction / alternation / modification of work in Building number ……………………………
are situated at plot number ………………………………..khasra number…………………………………., of Shri / Smt. ……………….(Name
of applicant) has been done in my supervision. All information’s given above are correct. In this regard my report is as
under:-
The constructed building is in accordance with applicable Bye-laws and approved plan/ approved compounding plan.
OR
Any deviation from approved Plan / approved compounding Plan in the building constructed has been given in serial
number 7.
The building is adequate for the purpose for which it has been constructed / re-constructed / altered. It is of high quality
and is safe on the basis of structure. The building is fully adequate and safe for inhabitation.
Therefore, issuance of completion certificate is recommended.
Signature ……………………………………
Name & address……………………………..
Of registered …………………………………….
Architect/Engineer……………………………..
Registration No.
Of Council of
Architecture/ License No. ……………………
Period of validity
Of License ……………………………………………
Date:
Part-C
Certificate of Registered Licensed person regarding Rain Water Harvesting
(For of Group Housing, Commercial and Multi storey Building)
The provision of Rainwater harvesting (Rooftop Rainwater harvesting system) has been made in the building
constructed in accordance with the Building Plan approved by the Development Authority / applicable Bye-laws.
Signature ………………………..
Name & Address of
Registered………………………..
Licensed Person………………….
License No………………………….
Date:-
Appendix-6
(Form ’B’ - PAGE 4/4)
Part-D
Confirmation and Completion Certificate of Development Authority
(To be issued on photocopy of Part ‘A’, ’B’ and ‘C’ of the application)
The above certificate given in respect of building constructed on plot number…………………………………. situated in
……………………………………..(ward / scheme / locality / sector) has been examined by Shri ………………………………………………..
(designation), Development Authority and the construction has been found correct according to the plan approved by
the Authority on ………………………………..(date). Therefore Completion Certificate is issued in accordance with Section-15
ka (2) of UP Urban Planning and Development Act, 1973.
Signature …………………………………..
Designation ……………………………….
Seal OF Office ……………………………
Date……………………………………………
Appendix-6
(Form ’C’ - PAGE 1/4)
Form-‘C’
Application form for Completion Certificate of Buildings other than Residential, Group
Housing, Commercial and Multi Storey buildings.
(Bye-law No. 3.1.8)
…………………………………. Development Authority
Part-A
1. (i) Name of Applicant
(ii) Present Address
2. Plot No. and Name of Scheme/ Locality/ Ward No.
3. Area of Plot (in sq meters)
4. Permissible use of building
5. (i) Date of approval of Building plan
(ii) Permit No.
(iii) If auto approved, the details of provision
If information of rejection of Building Plan is
Not given within the prescribed period from
Date of submission of Building Plan:-
Receipt No. and Date of submission of Plan.
Attach attested copy of the receipt.
6. (i) If unauthorized construction has been got
compounded, attach copy of Compounding plan.
(ii) Receipt No. and date of payment of
Completion fee
(iii) Attach attested copy of the same.
7. Position of Construction (Builder to give details as per approved plan/ Completion plan , whichever is applicable)
S No. Provisions Permissible Built Approved/ Compounded deviation
1. 2. 3. 4. 5.
7.1 Ground Coverage(Percentage)
7.2 F.A.R
7.3 Set-Back(in meters)
a) Front
b) Rear
c) Right
d) Left
e) Basement(Area in sq meters)
7.4 Amenities
a) Water supply Yes/No
b) Sewage Yes/No
c) Drainage Yes/No
d) Electricity Supply Yes/No
8. Internal Alterations in the building
(a) Within the Bye- laws (Yes/ No)
(b) If in contravention off Bye-laws, the same has been compounded
(Yes/No)
Appendix-6
(Form ’C’ - PAGE 2/4)
Certified that the above details are true according to my/ our personal knowledge. There is no such unauthorized
construction under the Building Bye-Laws as has not been compounded. Completion Certificate for construction on
the above plot may please be issued.
Enclosed documents:
1.
2.
3.
Signatures of applicant
Authorized for making application
(with certificate)
Date:-
NOTE:
1. The above information will be given only by the person authorised for making application. The certificate of
having been authorized will be enclosed.
2. Separate application will have to be submitted for each block in Building Complex.
Appendix-6
(Form ’C’ - PAGE 3/4)
Part-B
Certificate of Registered Architect/ Engineer
(For of Group Housing, Commercial and Multi storey Building)
Certified that construction / re-construction / alternation / modification of work in Building number ……………………………
are situated at plot number ………………………………..khasra number…………………………………., of Shri / Smt.
……………………………….(Name of applicant) has been done in my supervision. All information’s given above are correct. In
this regard my report is as under:-
The constructed building is in accordance with applicable Bye-laws and approved plan/ approved Compounding plan.
OR
Any deviation from approved Plan / approved Compounding Plan in the building constructed has been given in serial
number 7.
The building is appropriate for the purpose for which it has been constructed / re-constructed / altered. It is of high
quality and is safe on the basis of structure. The building is fully adequate and safe for inhabitation.
Therefore, issuance of completion certificate is recommended.
Signature ……………………………………
Name & address……………………………..
Of registered …………………………………….
Architect/Engineer……………………………..
Registration No.
Of Council of
Architecture/ License No. ……………………
Period of validity
Of License ……………………………………………
Date:
Part-C
Certificate of Registered Licensed person regarding Rain Water Harvesting
(For of Group Housing, Commercial and Multi storey Building)
The provision of Rainwater harvesting (Rooftop Rainwater harvesting system) has been made in the building
constructed in accordance with the Building Plan approved by the Development Authority / applicable Bye-laws.
Signature ………………………..
Name & Address of
Registered………………………..
Licensed Person………………….
License No………………………….
Date:-
Appendix-6
(Form ’C’ - PAGE 4/4)
Part-D
Confermation and Completion Certificate of Development Authority
(To be issued on photocopy of Part ‘A’, ’B’ and ‘C’ of the application)
The above certificate given in respect of building constructed on plot number…………………………………. situated in
……………………………………..(ward / scheme / locality / sector) has been examined by Shri ………………………………………………..
(designation), Development Authority and the construction has been found correct according to the plan approved by
the Authority on ………………………………..(date). Therefore Completion Certificate is issued in accordance with Section-15
ka (2) of UP Urban Planning and Development Act, 1973.
Signature …………………………………..
Designation ……………………………….
Seal OF Office ……………………………
Date……………………………………………
Appendix-12
Eligibility of Structural Engineers on the basis of Construction Work and Earthquake Zone
(Bye-law No.-13.5)
Category
of Work
Category- wise limit of
construction works-for
structural designing of
which engineers
designated in column
4&5 will be authorized.
Earthquake zones
where
constructions will
be situated
Minimum experience of
supervision of designing and
construction of multi-storey
buildings and related
infrastructure engineer(in
years)
Other Details
For Graduate
Civil
Engineer
For Post
Graduate
Structural
Engineer
1. 2. 3. 4. 5. 6.
(A) For multi storey
buildings of maximum 4
storey or height of 12
meters or covered area
upto 2500 sq meters/
important infrastructure
facilities
i. Upto Zone
3
ii. Zone 4&5
3
5
1
3
-
-
(B) For multi-storey
buildings of maximum 8
storey or 24 meters
height or covered area
upto 5000 sq meters/
important infrastructure
facilities
i. Upto Zone
3
ii. Zone 4&5
7
9
5
7
-
-
(C) For multi-storey
buildings of maximum 8
storey or height more
than 24 meters or
covered area upto 5000
sq meters/ important
infrastructure facilities
From zone 1 to 5 10 8 Structural design will
have to be got counter-
signed by professor of
Structural Engineering
of I.I.T, Roorkee
University or any other
designated Technical
Institute.
Appendix-13
Eligibility of site Civil Engineer for supervision of Construction works
(Rule no.-13.5)
Category
of Work
Category- wise limit of
construction works-for
structural designing of
which engineers
designated in column
4&5 will be authorized.
Earthquake zones
where
constructions will
be situated
Minimum experience of
supervision of designing and
construction of multi-storey
buildings and related
infrastructural facilities
Other Details
For Graduate
Civil Engineer
For Post
Graduate
Structural
Engineer
1. 2. 3. 4. 5. 6.
(A) For multi storey buildings
of maximum 4 storey or
height of 12 meters or
covered area upto 2500
sq meters/ important
infrastructure facilities
iii. Upto Zone 3
iv. Zone 4&5
6
10
3
5
For each 2500
square meter
covered area , one
site engineer of
prescribed eligibility
will be posted for
supervision.
(B) For multi-storey buildings
of maximum 8 storey or
24 meters height or
covered area upto 5000
sq meters/ important
infrastructure facilities
iii. Upto Zone 3
iv. Zone 4&5
Not
authorized
As above
6
10
As above
(C) For multi-storey buildings
of maximum 8 storey or
height more than 24
meters or covered area
upto 5000 sq meters/
important infrastructure
facilities
From zone 1 to 5 As above 15 As above
Appendix-14
Classification Of Expert Inspecting Civil Engineers
(Bye-law No. 13.5)
Category
of Work
Category- wise
limit of
construction
works-for
structural
designing of
which engineers
designated in
column 4&5 will
be authorized.
Earthquake zones where
constructions will be
situated
Minimum experience of
supervision of designing
and construction of multi-
storey buildings and related
infrastructural facilities
Other Details
For
Graduate
Civil
Engineer
For Post
Graduate
Structural
Engineer
1. 2. 3. 4. 5.
(A) For multi storey
buildings of
maximum 4 storey
or height of 12
meters or covered
area upto 2500 sq
meters/ important
infrastructure
facilities
i. Upto Zone 3
ii. Zone 4&5
5
7
-
(B) For multi-storey
buildings of
maximum 8 storey
or 24 meters
height or covered
area upto 5000 sq
meters/ important
infrastructure
facilities
i. Upto Zone 3
ii. Zone 4&5
8
10
(C) For multi-storey
buildings of
maximum 8 storey
or height more
than 24 meters or
covered area upto
5000 sq meters/
important
infrastructure
facilities
From zone 1 to 5 15 For inspection of these
construction works, joint
panel of two serving/
retired experts will be
deputed, out of which one
except should have been of
minimum level of Chief
Engineer/ Equivalent in the
Engineering department/
under taking of state/
central government and
the second expert will be
of the level of Professor in
civil Engineering Deptt. Of
any designated Technical
Institute as far as possible.
In case of non-availability
of these, both the experts
will be of the level of Chief
Engineer/Equivalent.
Previous and next
Questions people ask
Is form D of Building Bye laws 2008 still in force?
No repeal of Building Bye laws 2008 is recorded.