Rule 190, Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008: Operation of pile-driving equipment
Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 - Rule 190
Text of rule 190
Operation of pile-driving equipment
190. Operation of pile-driving equipment.—The employer shall ensure
at a construction site of a building or other construction work that,—
(a) only experienced and trained building worker operates pile-driving
equipment so as to avoid any probable danger from such
operation;
(b) pile-driving operations are governed by generally prevalent and
accepted signals so as to prevent any probable danger from
such operations;
(c) every building worker, employed in pile driving operation or in
the vicinity of such pile driving operation, wears ear protection
and safety helmet or hard hat and safety shoes;
(d) precast piles are manufactured at a distance at least equal to
twice the length of the longest pile, from the place of pile-driving
operations; and
(e) when a pile driver is not in use, the hammer of such pile driver
is blocked at the bottom of the head of such pile driver.
Previous and next
Questions people ask
Is rule 190 of Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 still in force?
No repeal of Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 is recorded.