Rule 190, Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008: Operation of pile-driving equipment

Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 - Rule 190

Text of rule 190

Operation of pile-driving equipment

190. Operation of pile-driving equipment.—The employer shall ensure at a construction site of a building or other construction work that,— (a) only experienced and trained building worker operates pile-driving equipment so as to avoid any probable danger from such operation; (b) pile-driving operations are governed by generally prevalent and accepted signals so as to prevent any probable danger from such operations; (c) every building worker, employed in pile driving operation or in the vicinity of such pile driving operation, wears ear protection and safety helmet or hard hat and safety shoes; (d) precast piles are manufactured at a distance at least equal to twice the length of the longest pile, from the place of pile-driving operations; and (e) when a pile driver is not in use, the hammer of such pile driver is blocked at the bottom of the head of such pile driver.

Previous and next

All provisions of Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008

Questions people ask

Is rule 190 of Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 still in force?

No repeal of Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 is recorded.