Rule 174, Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008: Use of winches and climbers for suspended scaffold
Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 - Rule 174
Text of rule 174
Use of winches and climbers for suspended scaffold
174. Use of winches and climbers for suspended scaffold.—The
employer shall ensure at a construction site of a building or other construction
work that,—
(a) no suspended scaffold is raised or lowered by winches or climbers
unless such scaffold is made of sound material, adequate strength
and has been tested and certified safe for use of winches or climbers
for such raising or lowering by a competent person before being
taken into use;
Section 40(2)
(p)
Section 40(2)
(p)
Section 40(2)
(p)
82
(b) all suspended scaffolds counter–balanced by counter-weights, are
of types, approved by the Chief Inspector before being taken into
use for building or other construction work;
(c) the working platform of a suspended scaffold is securely fastened to
the building or structure as to be safe and to prevent such platform
from swinging; and
(d) the safe working load, which a suspended scaffold can carry, is
displayed where such scaffold is being used.
Previous and next
Questions people ask
Is rule 174 of Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 still in force?
No repeal of Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 is recorded.