Rule 99, Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008: Depth of trenches
Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 - Rule 99
Text of rule 99
Depth of trenches
99. Depth of trenches.—The employer shall ensure at a construction
site of a building or other construction work that,—
(a) where the depth of a trench requires two lengths of sheet
piling, one above the other, the lower piling is set inside the
bottom strings or walls of the upper piling and such sheet
piling is driven down and braced as the excavation continues;
and
(b) all metal sheet piles used in excavation or a trench are welded
end to end and secured by other similar means.
Previous and next
Questions people ask
Is rule 99 of Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 still in force?
No repeal of Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 is recorded.