Rule 89, Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008: Notification of intention to carry out excavation and tunnelling work
Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 - Rule 89
Text of rule 89
Notification of intention to carry out excavation and tunnelling work
89. Notification of intention to carry out excavation and tunnelling
work.—(1) Every employer carrying out any excavation or tunnelling work at a
construction site of a building or other construction work shall, within thirty
days prior to the commencement of such excavation or tunnelling work, inform
in writing the detailed layout plans, method of construction and schedule of such
excavation or tunnelling work to the principal employer, if any, and to the Chief
Inspector.
(2) In case, compressed air is used in such excavation or tunnelling
work or any work incidental to or required for such excavation or tunnelling
work, the technical details and drawings of all man-locks and medical-locks
together with names and addresses of all construction medical officers having
qualification as laid down in Schedule IX, and so appointed by such employer for
the purpose of such excavation or tunnelling work, shall be sent to the principal
employer, if any, and to the Chief Inspector.
Previous and next
Questions people ask
Is rule 89 of Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 still in force?
No repeal of Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 is recorded.