Rule 70, Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008: Mixing and pouring of concrete

Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 - Rule 70

Text of rule 70

Mixing and pouring of concrete

70. Mixing and pouring of concrete.—The employer shall ensure at a construction site of a building or other construction work that,— (a) the concrete mixture does not contain any material which may unduly affect the setting of such concrete, weaken such concrete or corrode steel used with such concrete; (b) when dry ingredients of concrete are being mixed in confined spaces such as silos— (i) the dust shall be exhausted at the time of such mixing; and (ii) in case the dust cannot be exhausted as specified in sub- clause (i), the building workers shall wear respirators at the time of such mixing; (c) when concrete is being tipped from buckets, building workers are kept out of the range of any kickbacks of such buckets; and (d) loads are not dumped or placed on setting concrete so as to avoid damage to green concrete.

Previous and next

All provisions of Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008

Questions people ask

Is rule 70 of Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 still in force?

No repeal of Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 is recorded.