Text of rule 70
Mixing and pouring of concrete
70. Mixing and pouring of concrete.—The employer shall ensure at a
construction site of a building or other construction work that,—
(a) the concrete mixture does not contain any material which may
unduly affect the setting of such concrete, weaken such
concrete or corrode steel used with such concrete;
(b) when dry ingredients of concrete are being mixed in confined
spaces such as silos—
(i) the dust shall be exhausted at the time of such mixing; and
(ii) in case the dust cannot be exhausted as specified in sub-
clause (i), the building workers shall wear respirators at
the time of such mixing;
(c) when concrete is being tipped from buckets, building workers
are kept out of the range of any kickbacks of such buckets;
and
(d) loads are not dumped or placed on setting concrete so as to
avoid damage to green concrete.
Previous and next
Questions people ask
Is rule 70 of Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 still in force?
No repeal of Punjab Building and Other Construction Workers ( (Regulation of Employment and Conditions of Service) Rules, 2008.) Rules, 2008 is recorded.