Form 3, TAMIL NADU WINE (MANUFACTURE) RULES, 2006: FORM 3
TAMIL NADU WINE (MANUFACTURE) RULES, 2006 - Form 3
Text of form 3
FORM 3
FORM 3
(See rule 4)
To
The Commissioner of Prohibition and Excise,
Chepauk, Chennai-600 005.
Application for grant of privilege and licence under rule 4 of the
Tamil Nadu Wine (Manufacture) Rules 2006.
Dated...........................
Application of.............................resident of....................................
carrying on business at .................................................. ........Manufacture
of Wine:
(1) The undersigned Thiru ........................................../for himself /
acting on behalf ........................................... applies for grant of privilege
and a licence to manufacture wine under the Tamil Nadu Wine
(Manufacture)Rules,2006,.............at ............................................................
in the district .......................................of .......................................in the
State of Tamil Nadu.
(2) The applicant desires to administer the Wine Manufactory Unit
with the apparatus of the following sizes and descriptions, namely :-
................................................... .............................................
................................................... .............................................
(3) In the event of a licence being granted, the applicant proposes
to commence the manufacture of wine within ..................................on the
.....................................
(4) Plans and estimates of the premises and buildings to be used
as a wine manufactory and for store house and other purposes
connected with the business are annexed for approval. The applicant
undertakes to erect buildings and to make all necessary structural or
other alterations and additions to the premises and buildings which the
Commissioner may, from time to time, direct and in all respects to conform
to the Commissioner's directions as to the maintenance of the premises
and buildings in a proper state in regard both to the repair and conditions
of the buildings and premises and their sanitation and suitability to the
purposes of a manufactory under the rules in that behalf for the time
being in force.
32
(5) The applicant undertakes to comply in all respects with (a) the
provisions of the Tamil Nadu Prohibition Act, 1937; (b) the provisions of
the Tamil Nadu Wine (Manufacture) Rules 2006, applicable to the wine
manufactory, and (c) the conditions which may be entered in the licence
applied for.
(6) A certificate from the municipality or other local authority to the
effect that there are no objections on sanitary ground to the carrying on of
the business in the locality, to the premises and buildings proposed is
attached.
(7) Any further plans, estimates or information required will
promptly be supplied.
(8) The applicants is / are ready and willing to deposit the sum of
Rs....... as Security for the due performance by him / them of each and all
of the requirements of the Tamil Nadu Wine (Manufactory) Rules, 2006 of
the licence.
(9) Certified that the following documents are enclosed.
1. Annexure to the application duly filled in.
2. A full description of site and plan of the building in which the
wine manufactory is located.
3. A statement in triplicate specifying the number size and
description of all the vessels and apparatus which are
proposed to be used in the manufacture of wine.
4. A statement showing the quantity of wine proposed to be
manufactured during the currency of licence, and
5. particulars of the kinds of wine proposed to be manufactured
I / we declare that the particulars furnished are correct and in case
if they are found illegal or false I/we am / are liable for all legal and other
actions.
(Signed).............................
* Here enter the full name and address of the applicant. If more
than one person is concerned in obtaining a licence, the full name and
address of each of such person must be given. If the application is from
33
a institution, the full name and principal place of business of the
institution and the names of each partner thereof must to be stated.
To be signed by each applicant ( if more than one) or some person
legally authorized to sign for him, or for the institution when the
application is from an institution.
34
ANNEXURE TO FORM 3 (APPLICATION FOR LICENCE)
1. (a) Name and address of the
applicant. (furnish the name of the
person in whose name the
license to be issued).
(b) Name and address of the
Institution
(c) Whether public / private Limited or
proprietary concern registration
details under the relevant
Acts/Authority to be furnished.
2. Capital Structure--
(a) In case of Limited
Company-
(i) Authorised
(ii) Issued
(iii) Paid up
(iv) Borrowing, if any
(b) in case of other-
(i) Capital
(ii) Borrowing, if any
(c) Details of investment
I. Fixed Assets-
(i) Land Rs.
(ii) Buildings Rs.
(iii) Plant or
machinery Rs.
(iv) Others, if any Rs.
----------
Total Rs.
-----------
II. Working capital Rs.
Audited financial statement for the last
three years in the case of existing
institution should be enclosed.
3. Location
4. Plant and machinery-
(i) Value of plant and machinery of
description to be imported or of
imported origin.
(ii) Value of plant and machinery of
description of indigenous origin.
5. Raw materials required for production-
(i)Type of raw materials required and
source of requirement.
35
(ii) A full description of the Vineyard
established by the applicant. ( copies
of supporting documents)
(iii)Quantity of alcohol, if any required
per year in the manufacture of
fortification of wine proposed for
manufacture
(iv)Source of procurement of alcohol
6. Water and power requirement --
(i) Particulars of requirements
(ii) Whether necessary permission
has been secured from the
concerned authority with details of such
permission
7. Process of manufacture of wine --
(a) Brief process of manufacture of wine
(b) Standard and quantity of products
proposed to be manufactured.
8. Technical Assistance--
(i) Whether any foreign collaboration
or know-how is envisaged and if so
the letter of intent is issued.
(ii)Details of collaboration within the
country
9. Forecast of time factors-
(a) Time required to erect machinery
after the grant of licence.
(b) Time required to start production
after the licence is granted.
10. Item of
manufacture
Annual capacity
quantity, value
(In metric measures)
Estimated
annual production
Unit value
Product
(1) (2) (3) (4)
11. Employment potential
(i) Supervisor
(ii) Skilled
(iii) Unskilled
12. (a) Any Special facilities required from
the Government.
(b) Special features, if any, of
the scheme.
13. (i) Chalan number and date in support of
Payment of fees towards the
application fee, privilege fee and
licence fee with place of remittance.
36
(ii) Whether the chalan in original is
enclosed.
Date: Signature of the Applicant
37
Previous and next
Questions people ask
Is form 3 of TAMIL NADU WINE (MANUFACTURE) RULES, 2006 still in force?
No repeal of TAMIL NADU WINE (MANUFACTURE) RULES, 2006 is recorded.