LawGrids logoLAWGRIDS.ORG

Form 3, TAMIL NADU WINE (MANUFACTURE) RULES, 2006: FORM 3

TAMIL NADU WINE (MANUFACTURE) RULES, 2006 - Form 3

Text of form 3

FORM 3

FORM 3 (See rule 4) To The Commissioner of Prohibition and Excise, Chepauk, Chennai-600 005. Application for grant of privilege and licence under rule 4 of the Tamil Nadu Wine (Manufacture) Rules 2006. Dated........................... Application of.............................resident of.................................... carrying on business at .................................................. ........Manufacture of Wine: (1) The undersigned Thiru ........................................../for himself / acting on behalf ........................................... applies for grant of privilege and a licence to manufacture wine under the Tamil Nadu Wine (Manufacture)Rules,2006,.............at ............................................................ in the district .......................................of .......................................in the State of Tamil Nadu. (2) The applicant desires to administer the Wine Manufactory Unit with the apparatus of the following sizes and descriptions, namely :- ................................................... ............................................. ................................................... ............................................. (3) In the event of a licence being granted, the applicant proposes to commence the manufacture of wine within ..................................on the ..................................... (4) Plans and estimates of the premises and buildings to be used as a wine manufactory and for store house and other purposes connected with the business are annexed for approval. The applicant undertakes to erect buildings and to make all necessary structural or other alterations and additions to the premises and buildings which the Commissioner may, from time to time, direct and in all respects to conform to the Commissioner's directions as to the maintenance of the premises and buildings in a proper state in regard both to the repair and conditions of the buildings and premises and their sanitation and suitability to the purposes of a manufactory under the rules in that behalf for the time being in force. 32 (5) The applicant undertakes to comply in all respects with (a) the provisions of the Tamil Nadu Prohibition Act, 1937; (b) the provisions of the Tamil Nadu Wine (Manufacture) Rules 2006, applicable to the wine manufactory, and (c) the conditions which may be entered in the licence applied for. (6) A certificate from the municipality or other local authority to the effect that there are no objections on sanitary ground to the carrying on of the business in the locality, to the premises and buildings proposed is attached. (7) Any further plans, estimates or information required will promptly be supplied. (8) The applicants is / are ready and willing to deposit the sum of Rs....... as Security for the due performance by him / them of each and all of the requirements of the Tamil Nadu Wine (Manufactory) Rules, 2006 of the licence. (9) Certified that the following documents are enclosed. 1. Annexure to the application duly filled in. 2. A full description of site and plan of the building in which the wine manufactory is located. 3. A statement in triplicate specifying the number size and description of all the vessels and apparatus which are proposed to be used in the manufacture of wine. 4. A statement showing the quantity of wine proposed to be manufactured during the currency of licence, and 5. particulars of the kinds of wine proposed to be manufactured I / we declare that the particulars furnished are correct and in case if they are found illegal or false I/we am / are liable for all legal and other actions. (Signed)............................. * Here enter the full name and address of the applicant. If more than one person is concerned in obtaining a licence, the full name and address of each of such person must be given. If the application is from 33 a institution, the full name and principal place of business of the institution and the names of each partner thereof must to be stated. To be signed by each applicant ( if more than one) or some person legally authorized to sign for him, or for the institution when the application is from an institution. 34 ANNEXURE TO FORM 3 (APPLICATION FOR LICENCE) 1. (a) Name and address of the applicant. (furnish the name of the person in whose name the license to be issued). (b) Name and address of the Institution (c) Whether public / private Limited or proprietary concern registration details under the relevant Acts/Authority to be furnished. 2. Capital Structure-- (a) In case of Limited Company- (i) Authorised (ii) Issued (iii) Paid up (iv) Borrowing, if any (b) in case of other- (i) Capital (ii) Borrowing, if any (c) Details of investment I. Fixed Assets- (i) Land Rs. (ii) Buildings Rs. (iii) Plant or machinery Rs. (iv) Others, if any Rs. ---------- Total Rs. ----------- II. Working capital Rs. Audited financial statement for the last three years in the case of existing institution should be enclosed. 3. Location 4. Plant and machinery- (i) Value of plant and machinery of description to be imported or of imported origin. (ii) Value of plant and machinery of description of indigenous origin. 5. Raw materials required for production- (i)Type of raw materials required and source of requirement. 35 (ii) A full description of the Vineyard established by the applicant. ( copies of supporting documents) (iii)Quantity of alcohol, if any required per year in the manufacture of fortification of wine proposed for manufacture (iv)Source of procurement of alcohol 6. Water and power requirement -- (i) Particulars of requirements (ii) Whether necessary permission has been secured from the concerned authority with details of such permission 7. Process of manufacture of wine -- (a) Brief process of manufacture of wine (b) Standard and quantity of products proposed to be manufactured. 8. Technical Assistance-- (i) Whether any foreign collaboration or know-how is envisaged and if so the letter of intent is issued. (ii)Details of collaboration within the country 9. Forecast of time factors- (a) Time required to erect machinery after the grant of licence. (b) Time required to start production after the licence is granted. 10. Item of manufacture Annual capacity quantity, value (In metric measures) Estimated annual production Unit value Product (1) (2) (3) (4) 11. Employment potential (i) Supervisor (ii) Skilled (iii) Unskilled 12. (a) Any Special facilities required from the Government. (b) Special features, if any, of the scheme. 13. (i) Chalan number and date in support of Payment of fees towards the application fee, privilege fee and licence fee with place of remittance. 36 (ii) Whether the chalan in original is enclosed. Date: Signature of the Applicant 37

Previous and next

All provisions of TAMIL NADU WINE (MANUFACTURE) RULES, 2006

Questions people ask

Is form 3 of TAMIL NADU WINE (MANUFACTURE) RULES, 2006 still in force?

No repeal of TAMIL NADU WINE (MANUFACTURE) RULES, 2006 is recorded.