Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006 - Rule 214
Text of rule 214
General Provision
214. General Provision.- The employer shall ensure at a construction site of a building or
other construction work that,-
(a) all pile driving equipments are of good design and sound construction taking into
account the ergonomic principles and are properly maintained;
(b) a pile driver is firmly supported on a heavy timber sill, concrete bed or other
secured foundation;
(c) in case a pile driver is required to be erected in dangerous proximity to an
electrical conductor, all necessary precautions are taken to ensure safety;
-84-
(d) the hoses of steam and air hammer are securely lashed to such hammer so as to
prevent them from whipping in case connection or break;
(e) adequate precaution is taken to prevent the pile driver from over-turning;
(f) all necessary precautions are taken to prevent hammer from missing the pile; and
(g) a responsible person for inspecting pile driving equipment, inspects such
equipment before taking it into use and takes all appropriate measures as required
for the safety of building workers before commencing pilling work by such
equipment.
Previous and next
Questions people ask
Is rule 214 of Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006 still in force?
No repeal of Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006 is recorded.