Rule 187, Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006: Stacking of cement and other material bags
Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006 - Rule 187
Text of rule 187
Stacking of cement and other material bags
187. Stacking of cement and other material bags.— The employer shall ensure at a
construction site of a building or other construction work that,—
(a) a stack pile is not more than 10 bags in height unless such stack pile is stacked in
a suitable enclosure or otherwise adequately supported;
(b) while removing bags from the stack pile, the stability of such stack pile is
ensured;
(c) bags containing cement or lime are stored in dry places:
-71-
(d) the materials like bricks, tiles or blocks are stored on a firm ground;
(e) reinforcing steel is stored according to its shape, size and length;
(f) stack of reinforcing steel is kept as low as possible:
(h) no pipe is stored on rack or in stack where such pipe is likely to fall by rolling;
(h) the angle of repose is maintained where loose materials are stacked; and
(i) when dust laden material is to be stored or handled, measures are taken to
suppress the dust produced by such storing or handling and suitable personal protective
equipment are supplied to and used by the building workers working for such storing and
handling.
CHAPTER XIX
Scaffold.
Previous and next
Questions people ask
Is rule 187 of Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006 still in force?
No repeal of Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006 is recorded.