Rule 126, Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006: Piling, shoring and bracing
Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006 - Rule 126
Text of rule 126
Piling, shoring and bracing
126. Piling, shoring and bracing.- The employer shall ensure at a construction site of a
building or other construction work that,-
(a) plank used for sheet piling in excavation or tunneling work is of sound material
with adequate strength;
(b) shores and braces used in excavation or tunneling work are of adequate
dimensions and are so placed as to the effective for their intended purposes;
(c) earth supported shores or braces used in excavation or tunneling work bear
against a footing of sufficient area and stability to prevent the shifting of such shores or
braces.
Previous and next
Questions people ask
Is rule 126 of Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006 still in force?
No repeal of Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006 is recorded.