Rule 119, Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006: Notification of intention to carry out excavation and tunneling work
Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006 - Rule 119
Text of rule 119
Notification of intention to carry out excavation and tunneling work
119. Notification of intention to carry out excavation and tunneling work.- (1) Every
employer carrying out any excavation or tunneling work at a construction site of a building or
other construction work shall, within thirty days, prior to the commencement of such
excavation or tunneling work. inform in writing the detailed layout, plans method of
construction and schedule of such excavation or tunneling work to the Chief Inspector of
Inspection of Building and Construction.
(2) In case compressed air is used in such excavation or tunneling work or any work
incidental to or required for such excavation or tunneling work, the technical details and
drawings of all man-locks and medical locks together with names and address of all
construction medical officers having qualification as laid down in Schedule-Xl to these rules
and so appointed by such employer for the purpose of such excavation or tunneling work
shall be sent to Chief Inspector of Inspection of Building and Construction.
Previous and next
Questions people ask
Is rule 119 of Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006 still in force?
No repeal of Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006 is recorded.