Rule 100, Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006: Mixing and pouring of concrete
Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006 - Rule 100
Text of rule 100
Mixing and pouring of concrete
100. Mixing and pouring of concrete.—The employer shall ensure at a construction site of
a building or other construction work that,-
(a) the concrete mixture does not contain any material which may unduly affect the
setting of such concrete, weaken such concrete or corrode steel used with such concrete;
(b) when dry ingredients of concrete are being mixed in confined spaces such as
silos,-
(i) the dust shall be exhausted at the time of such mixing; and
(ii) in case the dust cannot be exhausted, as specified in sub-clause (i) the
building workers shall wear respirators at the time of such mixing;
(c) when concrete is being tipped from buckets, building workers are kept out of the
range of any kickbacks of such buckets: and
(d) loads are not dumped or placed on settling concrete.
Previous and next
Questions people ask
Is rule 100 of Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006 still in force?
No repeal of Tamil Nadu Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules,2006 is recorded.