Rule 190, THE BUILDING AND OTHER CONSTRUCTION WORKERS' (REGULATION OF EMPLOYMENT AND CONDITIONS OF SERVICE) JHARKHAND RULES, 2006: Stacking of cement and other material bags
THE BUILDING AND OTHER CONSTRUCTION WORKERS' (REGULATION OF EMPLOYMENT AND CONDITIONS OF SERVICE) JHARKHAND RULES, 2006 - Rule 190
Text of rule 190
Stacking of cement and other material bags
190. Stacking of cement and other material bags. - The employer shall ensure at a construction site
of a building or other construction work that -
(a) a stack pile is not more than ten bags in height unless such stack pile is stacked in a suitable
enclosure or otherwise adequately supported ;
(b) while removing bags from the stack pile, the stability of such stack pile is ensured;
(c) bags containing cement or lime are stored in dry places;
(d) the materials like bricks, tiles or blocks are stored on a firm ground;
(e) reinforcing steel is stored according to its shape, size and length;
(f) stack of reinforcing steel is kept as low as possible;
(g) no pipe is stored on rack or in stack where such pipe is likely to fall by rolling;
(h) the angle of repose is maintained where loose materials are stacked ;
76
(i) when dust laden material is to be stored or handled, measures are taken to suppress the
dust produced by such storing or handling and suitable
(G) personal protective equipment are supplied to and used by the building workers working for
such storing or handling.
Previous and next
Questions people ask
Is rule 190 of THE BUILDING AND OTHER CONSTRUCTION WORKERS' (REGULATION OF EMPLOYMENT AND CONDITIONS OF SERVICE) JHARKHAND RULES, 2006 still in force?
No repeal of the BUILDING AND OTHER CONSTRUCTION WORKERS' (REGULATION OF EMPLOYMENT AND CONDITIONS OF SERVICE) JHARKHAND RULES, 2006 is recorded.