Rule 129, THE BUILDING AND OTHER CONSTRUCTION WORKERS' (REGULATION OF EMPLOYMENT AND CONDITIONS OF SERVICE) JHARKHAND RULES, 2006: Piling, shoring and bracing
THE BUILDING AND OTHER CONSTRUCTION WORKERS' (REGULATION OF EMPLOYMENT AND CONDITIONS OF SERVICE) JHARKHAND RULES, 2006 - Rule 129
Text of rule 129
Piling, shoring and bracing
129. Piling, shoring and bracing. - The employer shall ensure at a construction site of a building or
other construction work that, -
(a) plank used for sheet piling in excavation or tunnelling work is of sound material with
adequate strength;
(b) shores and braces used in excavation or tunnelling work are of adequate dimensions and
are so placed as to be effective for their intended purposes;
59
(c) earth supported shores or braces used in excavation or tunnelling work bear against a
footing of sufficient area and stability to prevent the shifting of such shores or braces.
Previous and next
Questions people ask
Is rule 129 of THE BUILDING AND OTHER CONSTRUCTION WORKERS' (REGULATION OF EMPLOYMENT AND CONDITIONS OF SERVICE) JHARKHAND RULES, 2006 still in force?
No repeal of the BUILDING AND OTHER CONSTRUCTION WORKERS' (REGULATION OF EMPLOYMENT AND CONDITIONS OF SERVICE) JHARKHAND RULES, 2006 is recorded.