Rule 69, THE BUILDING AND OTHER CONSTRUCTION WORKERS' (REGULATION OF EMPLOYMENT AND CONDITIONS OF SERVICE) JHARKHAND RULES, 2006: Rigging of derricks
THE BUILDING AND OTHER CONSTRUCTION WORKERS' (REGULATION OF EMPLOYMENT AND CONDITIONS OF SERVICE) JHARKHAND RULES, 2006 - Rule 69
Text of rule 69
Rigging of derricks
69. Rigging of derricks. - The employer shall ensure at a construction site of a building or other
construction work that every derrick has current and relevant rigging plans and any other
information necessary for the safe rigging of such derricks and its gear.
10. Securing of derrick foot - the employer shall ensure at a construction site of a building or other
construction work that appropriate measures are taken to prevent the foot of a derrick being
lifted out of its socket or support.
71. Construction and maintenance of lifting gear - The employer shall ensure at a construction
site of a building or other construction work that-
(a) every lifting gear is -
(i) of good design and construction, sound material and adequate strength to perform the
work for which it is used ;
(ii) free from patent defects; and
(iii) properly maintained in good repair and working order;
(b) components of the loose gear, at the time of its use, are renewed if one of its dimensions at
any point has decreased by ten per cent or more by user ;
(c) a chain is withdrawn from use when it is stretched and increased in length which exceeds
five percent of its length or when a link of such chain is deformed or is other-wise
damaged or raised scraps of defective welds is appeared on it;
(d) rings, hooks, swivels and end links attached to a chain are of the same material as that of
such chain;
(e) the voltage of electric supply to any magnetic lifting device does not fluctuate by more
than plus ten per cent, or minus ten percent.
37
72. Test and periodical examination of lifting gears - The employer shall ensure at a construction
site of a building or other construction work that -
(a) a lifting gear is initially tested for the manufacturer by a competent person, in a manner
specified in Schedule I annexed to these rules before taking into use or after undergoing
any substantive alterations which renders its any part liable to affect its safety and such
gear alters such test shall subsequently be retested for the use of its owner at least once in
every five years;
(b) a lifting gear in use is thoroughly examined once at least in every twelve months by a
competent person;
(c) a chain in use is thoroughly examined once at least every month by a responsible person
for its use;
(d) certificates of initial and periodical tests and examinations of loose gears under these rules
are obtained in Form VII annexed to these rules.
73. Ropes - The employer shall ensure at a construction site of a building or other construction work
that -
(a) no rope is used for building or other construction work unless -
(i) it is of good quality and free from patent defects ; and
(ii) in the case of wire rope, it has been tested and examined by a competent person in
the manner specified in Schedule I annexed to these rules;
(b) every wire rope of lifting appliance or lifting gear used for building or other construction
work is inspected by a responsible person for such use, once at least in every three
months;
Provided that after any such wire is broken in such rope, it shall thereafter be inspected
once at least in every month by the responsible person;
(c) no wire rope is used for building or other construction work if in any length of eight
diameters of such wires, the total number of visible broken wires exceeds ten per cent of
the total number of wires in such rope, or such rope shows sign of excessive wear,
corrosion or other defects which in the opinion of the person who inspects it is unfit for
use;
(d) eye splices and loops of ropes for the attachment of hooks, rings and other such parts to
wire ropes are made with suitable thimble.
(e) a thimble or loop splice made in any wire rope sling conforms to the following
standards, namely :-
(i) wire rope sling shall have at least three tucks with full strand of rope and two tucks
with one-half of the wires cut out of each of such strand in all cases, such strands
shall be tucked against the lay of the rope;
38
(ii) protruding ends of such strands in any splice of wire rope slings shall be covered or
treated so as to leave no sharp points ;
(iii) a fiber rope or a rope sling shall have at least four tucks; tail of such tuck being
whipped in a suitable manner ; and
(iv) a synthetic fiber rope or rope sling shall have at least four tucks with full strand
followed by further truck with one-half filaments cut out of each of such strand and
final tuck with one half of the remaining filaments cut-out from such strands. Any
portion of the splices containing such trucks, with reduced number of filaments, shall
be securely covered with suitable tape or other materials;
Provided that nothing contained in this sub-clause shall apply where any other form of
splice, which may be shown to be as efficient as the splice with above standards, is used.
74. Heat treatment of lifting gears - The employer shall ensure at a construction site of a building
or other construction work that -
(a) all chains other than bridle chains attached to derricks and all rings, hooks, shackles and
swivels used in hoisting or lowering of such derricks are effectively annealed under
supervision of a competent person and at the following intervals, namely;-
(i) such chains, rings, hooks, shackles and swivels which are not more than twelve and a
half millimeter of length are so annealed at least once in every six months ; and
(ii) all other such chains, rings, hooks, shackles and swivels are so annealed at least
once in every twelve months.
Provided that such annealing as referred to in sub-clause (i) and sub-clause (ii) shall not be
required if the Inspector, having jurisdiction, after obtaining the approval of the Chief Inspector
directs that such chains, rings, hooks, shackles and swivels undergo some other treatment and in
such cases the treatment directed by such Inspector shall be followed :
Provided further that in case of such chains, rings, hooks, shackles and swivels used solely on
such derricks and other hoisting appliances which are-worked by hand, the provisions of sub-
clause (i) and sub-clause (ii), as the case may be, shall apply as if for the period of six months
and twelve months the periods of twelve months and two years have respectively been
substituted therein:
Provided also that in case where the Inspector, having jurisdiction, is of the opinion that owing
to the size, design material or frequency of use of any such chains, rings, hooks, shackles and
swivels, the requirement of this clause for annealing is not necessary for the protection of
building worker, he may after obtaining the approval of the Chief Inspector certify in writing to
such employer that subject to the conditions specified in such certification, such chains, rings,
hooks, shackles and swivels are exempted from such annealing and thereafter the provision of
this clause shall apply subject to such exemption:
39
Provided also that this clause shall not apply to -
(i) pitched chains, working on sprocket or sprocketed wheels;
(ii) rings, hooks and swivels permanently attached to pitched chains, pulley blocks or
weighing machines;
(iii) hooks and swivels having ball bearings or other case hardened parts.
(b) a chain or a loose gear made of high tensile steel or alloy steel is plainly marked with a
mark indicating that it is so made;
(c) no chain or loose gear made of high tensile steel or alloy steel is subjected to any form of
heat treatment except where such treatment is necessary for the purpose of repair of such
chain or loose gear and that such repair is made under the direction of the competent
person;
(d) that the wrought iron gear, the past history of which is not traceable, is suspected of being
heat treated at incorrect temperature, is normalized before using it on any building or
other construction work.
Previous and next
Questions people ask
Is rule 69 of THE BUILDING AND OTHER CONSTRUCTION WORKERS' (REGULATION OF EMPLOYMENT AND CONDITIONS OF SERVICE) JHARKHAND RULES, 2006 still in force?
No repeal of the BUILDING AND OTHER CONSTRUCTION WORKERS' (REGULATION OF EMPLOYMENT AND CONDITIONS OF SERVICE) JHARKHAND RULES, 2006 is recorded.