LawGrids logoLAWGRIDS.ORG

Rule 5, The Kerala Irrigation and Water Conervation Rules, 2005: Construction and commissioning of irrigation works by the Government

The Kerala Irrigation and Water Conervation Rules, 2005 - Rule 5

Text of rule 5

Construction and commissioning of irrigation works by the Government

5.Construction and commissioning of irrigation works by the Government.— The particulars of the irrigation work to be published in the Gazette by the Government under section 8 of the Act shall include the following, namely:— (i) Name of work (ii) Details of estimate (a) estimate cost (b) actual cost (iii) Date of sanction (iv) Date of commencement of work (v) Ayacut area (a) Village/Panchayat (b) Taluk/District (vi) Date of commissioning (vii) Whether commissioning partly or fully. 2[5A. Grant of permission to construct, install, fix or lay any structure over, across, along, or inside an irrigation work--- (1) The Superintending Engineer, under whose jurisdiction the irrigation work falls, shall be the authority under section 5 of the Act to grant permission to construct, install, fix or lay any structure over, across, along, or inside an irrigation work. (2) Every application for grant of permission under section 5 shall be made to the Superintending Engineer, under whose jurisdiction the irrigation work falls, in Form No.3A, accompanied by a fee of Rs.100 (Hundred only) by means of a Treasury Chalan remitted in the Head of Account “0701-80-Gen-other receipts – 103- sale of water for other purpose.” (3) On receipt of an application under sub-rule 2, the Superintending Engineer, under whose jurisdiction the irrigation work falls, shall call for a detailed report from the Irrigation Officer, within 30 days of such receipt and thereafter on the basis of the report and after due enquiry, he may grant or refuse to grant permission, by a speaking order within days of the receipt of the report. (4) The report of the Irrigation Officer shall, among other details, if any, contain the following details, namely:- (a) whether the grant of permission to construct, install, fix, or lay any structure over, across, along, or inside the irrigation work as per the plan, design, or drawings is feasible or any modification is required. 1. Substituted by G.O(P) No.1/2018/WRD dated 18th February, 2018, S.R.O No.125/2018. 2. Inserted by G.O(P) No.1/2018/WRD dated 18th February, 2018, S.R.O No.125/2018. 3 (b) whether the grant of permission to construct, install, fix, or lay any structure over, across, along, or inside the irrigation work as per the plan, design, or drawings would cause damage or disturbance for the functioning of the irrigation work; (c) whether any future development of the irrigation work would be adversely affected if permission is granted; (d) whether beneficiary of any irrigation work would be adversely affected if permission is granted; (e) whether the ecology, environment, or natural resources would be adversely affected if permission is granted; (f) whether in his opinion, permission may be granted or refused in light of the above; (g) if permission can be granted upon complying with any special conditions, the conditions thereof; (h) if permission should not be granted, the specific reasons thereof; (5) Where permission is decided to be granted, it shall be granted in the format given in Schedule V; (6) On grant of permission, the applicant shall execute an agreement with the Superintending Engineer, under whose jurisdiction the irrigation work falls, in the format given Schedule VI; (7) It shall be the duty of the Irrigation Officer to ensure that no person or agency shall construct, install, fix or lay any structure over, across, along or inside an irrigation work, except in accordance with the permission granted by the Superintending Engineer, under whose jurisdiction the irrigation work falls, and after executing agreement specified in Schedule VI and he shall be liable for any default.

Previous and next

All provisions of The Kerala Irrigation and Water Conervation Rules, 2005

Questions people ask

Is rule 5 of the Kerala Irrigation and Water Conervation Rules, 2005 still in force?

No repeal of the Kerala Irrigation and Water Conervation Rules, 2005 is recorded.