Regulation 3, The Himachal Pradesh Electricity Regulatory Commission (Guidelines and Formats for Tariff Filing) Regulations, 2005: Definitions
The Himachal Pradesh Electricity Regulatory Commission (Guidelines and Formats for Tariff Filing) Regulations, 2005 - Regulation 3
Text of regulation 3
Definitions
3. Definitions.- In these regulations, unless the context otherwise requires:
(a) “Act” means the Electricity Act, 2003 (36 of 2003);
(b) “annexure” means the annexure to these regulations;
(c) “annual capacity index” means the average of the daily capacity indices over a
full year;
(d) “annual capacity utilisation” means the actual energy generated in a year
divided by the maximum energy it is capable of generating in a year;
(e) “Capacity Index (CI)” means declared capacity (MW) x 100/ maximum
available capacity (MW);
(f) “commercial operation” means when control of the loading of the generator is
turned over to the system dispatcher;2
(g) “Commission” means the Himachal Pradesh Electricity Regulatory Commission;
(h) “declared capacity” means the capacity to be available from the plant over the
peaking hours of the next day, as declared by the generator.
Explanation .-
For this purpose the peaking hours shall be not less than 3 hours within a 24 hour period;
1
Published in R. H.P. (Extra) dated 3
rd
November, 2005 at p. 4277-4398.
Compendium of HPERC Regulations, March 2021
(i) “design energy” means the quantum of energy, which could be generated in a 90
percent dependable year with 95 percent availability of installed capacity of the
station on annual basis;
(j) “Government” means Government of Himachal Pradesh;
(k) “licence” means a licence granted under Section 14 of the Act to undertake intra-
state transmission or distribution of electricity;
(l) “licensed business” means the functions and activities, which the licensee is
required to undertake in terms of the licence granted or being a deemed licensee
under the Act;
(m) “licensee” means a person who has been granted a licence and includes deemed
licensee in the State of Himachal Pradesh;
(n) “maximum available capacity” means maximum capacity the plant could
generate with all units running, under the prevailing conditions of water levels,
flows and with 100% gate openings;
(o) “normative value” means a value above which a hydro station would gain
incentives.
Explanation.-
For this purpose the normative value shall be 85% or as may be determined by the
Commission from time to time;
(p) “primary energy” means the quantum of energy generated up to the design
energy on per year basis at the generating station;
(q) “primary energy charge” means 90% of the lowest variable charge of the
thermal power station in the concerned region and the balance of total charges
would be recovered as capacity charges;
(r) “secondary energy” means the quantum of energy generated in excess of the
design energy on per year basis at the generating station;
(s) "tariff” means a schedule of standard prices or charges (termed 'rates'), together
with terms and conditions for the application of the tariff to a supply of electricity
or electricity related service;
(3) Words and expressions used and not defined in these regulations but defined in the
Act shall have the meanings as assigned to them in the Act.
Previous and next
Questions people ask
Is regulation 3 of the Himachal Pradesh Electricity Regulatory Commission (Guidelines and Formats for Tariff Filing) Regulations, 2005 still in force?
No repeal of the Himachal Pradesh Electricity Regulatory Commission (Guidelines and Formats for Tariff Filing) Regulations, 2005 is recorded.