Regulation 20, Delhi Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2005: ~ W"{ \iff~-~OR
Delhi Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2005 - Regulation 20
Text of regulation 20
~ W"{ \iff~-~OR
20. ~ W"{ \iff~-~OR.-~ fuln
":;fCj"'f~"-;q-I~*-~')owWl bTU~~-~ ~ ~~m ~
3r:p:m:~0fi14qllf1 ~m'01l1~t1..n~, ~-~ om
~ ~ fcf;<:rr ~ I
-Brfi:rn~, ~
~~J3Tfu.~'
DEUII ELECfRlCITY REGlJLATORY COMMISSlON
NOTIFICATION
Delhi, the 3rd January, 2006
No. F. 11(133)/2003IPower/12iNo. F. 8(18)/DERCI
200S-06/363S.-In exercise of powers conferred by
Sections 39, 40, 42 read with Section 181 of the Electricity
Act, 2003, the Delhi Electricity Regulatory Commission,
makes the following regulations for the introduction of
open access to the Transmission and Distribution System
and tenns and conditions thereof:
1. Short Title and Commencement.-(I) These
regulations may be called the Delhi Electricity Regulatory
Commission (Terms and Conditions for Open Access)
Regulations, 2005.
(2) These regulations shall come into force on
the date of its publication in Official Gazette
(3) These regulations shall ex1.endto the National
Capit:11Territ.ory of Delhi.
2. Definitions.-(l) In these Regulations, unless
the context otherwise requires-
(a) "Act" means tile Electricity Act, 2003 (36 of2003);
(b) "Central Commission" means the Central
Electricity Regulatory Commission constituted
under Section 76 of the Act;
(c) "Commission" means the Delhi Electricity
Regulatory Commission being the Commission
for the National Capital Territory ofDelhi in tenus
of the first proviso to sub-section (1) to section
82 of the Act;
Cd) "Grid Code" means Grid Code specified by the
Ccnnal Commission under clause (h) of sub-
section (1) of Section 79 oftlle Act and includes
State Grid Code specified by the Commission
under clause (h) of sub-section (l) of Section 86
ofthc AcL
(c) "Nodal Agency" means for the purpose of'
arranging long-term open access in
Transmission, the Stllte Transmission Utility and
fOf tJle purspose of arranging short-term open
access the State Load Despatch Centre. For the
open access in Distribution, both for short-term
and long-term, the "Nodal Agency" shall be the
State Load Despatch Centre;
(f). "Open Access Customer" means a consumer
pemlitted by the Commission to receive supply
of- electricity from a person, other thlln
distribution 1icel~see of his area of supply, and
the expressions includes a generating company
and a licensee, who has aVililed of or intends to
avail of open access. .
(g) "State" shall rilean National Capital Territory of
Delhi;
(h) "State Government" means the Lieutenant
Governor of National Capital Territory of Delhi
appointed by the President under article 239 and
designated as such under article 239 AA of the
Constitution;
(i) "State Transmission Utility (STU)" means the
State Transmission Utility operating as such,
under the Act, in the State;
G)" "State Load Dispatch Centre (SLDC)" means
State Load Dispatch Centre operating as such,
under the Act, in the State;
(2) Words :1nd expressions occurring in these
Regulations and not defined hereinabove shall bear the
same meaning assigned to them in the Act.
3. Extent of Application.- These Regulations sl1
apply to open access for llse of intra-state transmission
system and distribution Systems in the State within the
meaning of tile term defined in sub-section (37) and sub-
section (19), respectively of Section 2 of the Act.
4. Eligibility for Open Access and Conditions.-
(1) The Licensees, the Generating companies, incluuiltg
the persons who have established a captive generating
plant and the intending consumers, shall be eligible for
non-discriminatory open access to the intra-state
transmission system of the State Transmission Utilitv or
any transmission licensee, subject to the availabilit~' of
adequllte transmission facility in the Intra-State
Transmission System of the State' and' further, subject to
the payment of the transmission charges, as may be
determined by the COllmlissiol1,from time to time:
provided that in the event such open access is for
the use by a consumer including the transmission or for
otherv.ise conveyance or wheeling of electricity, as required
by any person for delivery to such consumer, in the area of
I
PART IV] DELHI GAZETTE. EXTRAORDINARY II
supply of a DistributioIl Licensee in the State, the open
access to the illtra-state traIlsmission systcm shall be
subject to paymellt of a surcharge. as Jllay be determined
by the COlllmission, from time to time, ullder sub-section
(2) of Section 42 of the Act.
(2) The Licensees, the Gener(lting cOlllpimies,
including the pcrsons 'vvho hiNe established a captive
generating pl(lnt and the intending consumer, shall be
eljgible for open access to Di stribut ion Systelll of the
Distribution Licellsee, ill (lccordance with the phases for
introduction of open access as provided under reglliation
5, herein, and further subject to the absellce of oper<ltjollal
constraints in tJle Distribution System ,111dalso the payment
of the wheelillg charges and surcharge, as may be
detennined by tJlC Commission from time to timc •
ProVided thilt ill the event such opell access is for
the use by a consumer incJudll1g the conveyance or
wheeling '01' electricity as required by any person for
delivery to snch consumer in lhe orea of supplv of a
Distrihution LicellSI.:Z·,In tlte St(lte, the open access to the
Distribution System shall be subject to paynwllt or an
additional surcliarge ~s m:1)' be. detenlllilcd by Ih~
COJ1U1lission as provided under sub-sectJOIl (4) of Section
42 oft he Act
Explanation.-FoI the purpose of thc open ilCCCSS
under tJlcse regulations, Ihe oper:3tiomll t;()Jlstr;jjnt~ inlile
Distribution System sh:lll include the 3vailabiliry of the
adequate c(!pdciry in the Dlstnbll{ioll Sy:;telll, approp! IJte
metering and r:llergy :1ccounting systelll where the
electriCIty to be wlleeJcd can be con Cell.\' 1l11.:;·l::'UJed (illd
accounted lor
5. Pha~e~of introduction of Open Access ---( I) The
Open Access slwll be allowed to tJle intra-statc lr:lI1SIIIJSS10n
system in the St::l1eimmedi:llely, subject to 111csJtisf3ction
of the conditions coniained in the Act or in these
Rq,'Ulat ions
(7) Thr Oren /I,('rf'~:;In tlie Dist.rihution System in
the State shall be allowed in the DIStribuLioIl SYSI(,JIlsublect
(0 Ihe abc,cllcc of oper:lI ion:tl COllst.ra.illls in (he- foJlowi Jl~
phases'
------------_._-------
SJ. PC) nicH];] r~ Dale of
No, IJltJ'odliction
(l Dcllvcl) of elect rici tv f,lr use lSI July. 2007
by the ConsulIlers wi tJl the
connected IO:ld OrflVe MW
and above
b Delivcry of electricity for usc
by tlte Conslllllers witlt (he
con!lected IO:ld of tilrcG MW
1st J;lJl .20()S
dlld :lbove,
, [)cIIIT!\ (I[ L'!c'(trie itl f(lr IIQ'
h\'IIIL' ('DI1:-'III1ICI, \\ lilt IIll'
l.OIIIlL'liL'd 1(l;ld (If (111,' '-.l\V
,;11<1 ;1l1(11 c'
\..)
\
(3) The Commission may allow Open Access to
consumers with capacity requirement less than one MW
after the 1st July. 200~, subject to revieY" of the operational
constraints alld other factors,
G. Special Provisions for existing Opcn Acccss
cuslomcrs.-The persons availing open access to the
Intra-State Transmission System and the Distribution
System in the State under an existing agreement or
arrangement. shall be entitled to continue to avail theopen
access on the (erlllS and conditions applicilble to them as
before, for the period of the existing agreement or
arnlngemcllt. subject 10 the payment of the transmission
charges, the wheeling charges and the applicable
surcharges as may be detennined by the Commission, from
time to lime.
7. Categorisation of Open Access Customcrs.-
(I) Subject 10 the prO\iisions of reb'lllation 6, the open
access customers shall be divided into two categories,
based on the dllration oruse of the ln1ril-StMe Tran~mission
System or titcDistribution System, namely.-
(a) Long-term Open Access Customers; or
(b) Short-term Open Access Customers.
(1\ The persons availing or intemding to ElvmJ of
the open access for a period of one year or less shall be
categonse as the short-term access customers
(3) The per:;om :l\':llling or intending to :Jwlil orlhe
open access for a period o[more tll<ln five year shall be the
long-term open access customers,
(4) ShorHeml open access customer shaH be eligIble
to obtain fresh open access after the expiry afthe term and
shall be ueJted as;) new applicant for capacity allocat.ion,
8. Allotment Priority.-(l) The priority for
allowing open access shall be decided generally on the
criteria that. the long-term open access customer shall be
givcn priority over the shorHeml open access custOl1ler.
(2) The open access shall be allowed only after
deternllJllllg the capad ty available in the jutro-slate
transmission system ilnd the operational constraints,
including the Gapacity available in the Distribution System.
the UlllisalJon tJlerCOr by tJle existing customers and the
capacity already committed for Transmission, DiSlnbutioll
and ReLaii Supply of Electricity to the consumers of the
Distribution Licensees ill lhe Slate,
n) Subject to llle above, the decision to allow opell
access slt"ll be made on the basis orfirst-come-first-serve,
(:1) The Commission Jllay in the public interest <lnd
ror rcasoJlS 10 be recorded III writing. by a general or special
order, deli'lte from the Jlorms provided above ilnd allo\\'
open acces~ to any person in the Intra-Slate Transmission
SV>.lcJ1l;llld or the DJ~tJiL)lJtlon Systelll,
'J. Dl'1Lmlillatioll ofCapacity,-{l) Thcavailahili{v
of ClP;IC!1\' in the Int ra-St;l(e Transmission System for IOllg-
12 DELHl GAZETTE. EXTRAORDfNARY
tell11 open access sll:lll be determined by the State
Transmission Utility and for silo rH enll open access, it shall
be determined by the Slate load Desp(ltc)l Centre, aIier
consi deri ng the representa tJ un of the Tr<1nsrni s~i on
Licellsees and the persoll seeking open access.
(2) The avaibbiJity of capacity in the Distribution
System, for long-term and short-term open access,
including the existence or absence of operational
constraints affecting the open access being allowed shall
be de1.ermin«d by the State Load Despatch Centre aHer
considering the representation oflhe distribution licen ee
:md the person seeking Ihe open access.
(3) In the event of any dispute on the capacity of
the Transmission System available or the existence or
absence of operational constraints ill the Distributjon
System. to be determined by the St.ate Transmission Utility
or State Load Despatch Centre, as the case may be, the
same shall be referred to the Commission for adjudicatioll
(.:I) The CommissIOll may while deciding on the
disputc undcr sub-regulation (3) above, or otJlerwise, by a
general or special order, made from time to time, lay down
the conditions to be compl ied by the persons seeking open
access to the Dist.ribution System in regard to operational
constraints and the open (lccess shall be allowed subject
to the due satisfaction of such conditions
(5) The conditions to be satisfied may include
const rllction. operation or maint.enance of dedicated
electric lines or works from the sub-stations or feeder line
or undertaking such other works as the Commission Jllay
decide to be necessary for open access without operational
constraints
]O. Procedure for seeking Open Access.----{)) The
persons seeking open access shall, apply to the concerned
nodal agency The appiic<ltion hall contain details
regarding rna:-Jmum pOvver (l'v1W IKW) to be transmitted or
\\'heeled in Ihe system and accordingly t.he capacity in the
system 10 be earmarked for the appltcal1t, tJle point of
injection. the point ofdrawaJ, durat.ion and hOUlSof availing
oJlen access and any other additional infoml3.tiOll tJlat may
be required by the Nodal Agency
(2) Application for open access should be
:Jccomp:.Jnicd by a non-refuJldable processing fee as given
JII titble belo"v\' .
Paniculars Amounl (Rs)
TI3JlSIllissiuli Opel!
A ....c:~s
Long Term One lakli
Sllort Term Ten t1101IS;'llld
Lon'Tcnn Twnty fiveDistribution Opcn
/\Cces~ IhOtlsa!ld
Shnn Telll] Two thOllsand flye
hundred
('j '1 :,,' ;\,.d:il ~'L'l'liC\ ~il<lli. III consu!181JOn \\lth
~1:!iC 1r;lIICJlw,:iull Uniny or St;lIe LOJC Dispatch (Cillil'.
,;~ the ~::;, n,.,·' h: :,' ',l".~ till" C:lj):\l"P\ :1\ ;]ijabJe <illd the
l \lqt.:II(:· (II ;Jt'~l"IlC::: 01 opcr;lIlOn:1l cOllslr;lI!liS III
pc:rlll!:t1il,: "iXI! ;l:CC:.'. :wel COI!llllll1l!ClIC the dccisl01l Ie<
the flpplicant within the time fr;nne presclibed below.
Sl.
No.
NoTypc of service/activity MaxiJIlUIll
processing time
2 3
(a)
Short-term Service (for the
period to be treated on first-
come-first-service basis)
For the sallle day (Emergency
only)
Four hours from
receipt of the
applicaLion.
Eight hours from
receipt of the
application
Two days from
receipt of the
application.
Three days from
receipt of the
app Iica Lion.
(b) Up to one day (Request
received at least one day
in advance)
Up to one week(c)
Cd) More than a week
2.
(a)
Long-tenn Service
Intimation regarding feasibility
of access without system
strengthening
Thirty days from
receipt of the
application.
(b) Intimation of results of studies SiAl)' d(l),s from
for system stiengthening with receipt of the
cost estimates and completion application,
scheduled
(4) The Nodal Agency shall decide on the capacity
available or the existence of operational constraints,
consistent with the principles and guidelines as decided
bv tilC State Transmission Utility. State Transformation
Uti lity shall decided such principles within thirty d:,. . f
publication ofthese Regulations
(5) The Nodal Agency shall also infrom the
applicant ofOte prerequistes required for the activation of
open access. Such prerequisites shall be as directed by
the Commission from time the time.
ll. Non-Utilisation ofopcll accesscapacity.-{l) In
the event of inability of the slJort-tenn open access
customer to utilize, continuously for more than four hours,
on any day, full or substantial part of the capacity allocated
:0 hilll, such a shon-term open access customer shall imrom
the respect.ive State Load Dil:>patch Centre of his inability
to utilise tJle capacity, along wiTh rp.r1S0ns, thereof, and
lIl;IV ::;urrclldeJ the usc 01 capaClty allocated to him.
HowC"vcr. such short-term open access cu::;tl.lrllcrshall bear
full transmission and or wheeling charges b:l~cd 011 the
0rtgmal reserved capacity till the time such Glpacity is
;dlo1\cd fO SOIlICotlier C!Jstomer.
(2) ./)... Jong-len11 open access ClistOilic·J shall n01
;c! IqlllSil or lr:illsJcr his rights 2nd oblig;;t ions laid daVin
III tile long-term open :lccess agrecmenl mtilout orior
:lpproval of the Nodal Agency. The rcllll<llllSllllle~l of
t
I
1
.,"
DELHI GAZETTE: EXTRAORDINARY 13
transfer of sueh ri~hts and obligations by (l long-term
opell access customer shall be subject to paymeJlt of
compellsation by the customer, as per the terms of the
long· term open access agreement.
(3) The State Load Dispatch Centre m(l), cancel or
reduce the capacity allocated to a short-term open access
customer when such a short-term open access customer,
frequently under-utilizes lhe allocated capacity or fails to
inform of his inabi lity to utilise the allocated ctlpaeity to
the State Load Dispi:ltch Centre, Transmissiom Licensee
or Distribution Liccnsee, as the case may be :
Provided the capacity allotted shall not be reduced
or cancelled under this clause \-vithout notice to such
customer whose reserved allotted capacity is sought to be
cancelled or reduced
(4) The surplus capacity available as a result of its
surrender by tJle short:tenn open access customer, under
sub-regulation (I) above or reduction or cancellation of
capacity by the State Load Dispatch Centre, under sub-
regulation (3) above, lIlay be allocated to illl)' other short-
term open access customer
12. Applicable Chargt·s.-(l) The Open Access
Customers shall pay the transmission charges, wheeling
charges, surcharges, additional surcharges, scheduling
charges (payable to State Load Dispatch Centre),
unscheduled inter-change (Vl) charges, reactive energy
charges and such other charges as the Commission may
determine from time to time, (IS a part of the tariff under
Sections 61,62 and 86 of the Act or oUlenvise decide or
;mtllorise the Nod::!! Agency to charge in exercise of its
rcgulrltory powers under the Act.
(2) The Commission, while determininglhe charges
for open access to the Transmission System or the
Distribution System. provide for adjustment oflosses in
the system either in temlS of money or in !llC quantum of
c1eetriciry to be delivered at the destination, after the
transmission and/or wheeling of electricity as the
Commission considers to be appropriate.
13. CurtRilmcnt j)riorit)' .-\l-l1len bccaue of transmission
cOllstraints or othenvise, it becomes necessary (0 curtail
(he (r;l1IsJllis~ion service, the shon-term open access
customers shall be curtailed first followed by the long-term
open access customers:
Provided thnt within ;1 catcgorl'. the open access
cllstomers shall have equal curt'liln\p.1l1 priority and shall
be curWiled on prOfJta basis
PrOI'ldcd futherthat in c;lse oj sneh curtailment, the·
lJ:1I1~1~11'~IUIIor wheeling cli,lrrcs p;lld b~"open access
lLl~tulllt'lsshal! be reduced ill propOJtioll (0 their curtailed
C;qldl II\'
14. Oi Ill'! CUlilliliom.-( 1) TIll O~llli Al,LC~~,-ustoll1ers
~h;t11nlcet the Illctering rcqllifCllll'llI~ ;I~ tlte: ('01nrnission
Ii;:!\ rlli,'ct fl{1!11lillie to tiliit' Th,' Illctcr~ ~lt;J!1:Jlw<lYsbe
1:i.lllll.lIil,·U ill Ll.liUd cOlldlll(11i :Iild sh:J!! he- ()pen for
11:'jll'.Jllln bl ;i!1\ persoll ;ll!th')ii',cd hI' (he cOJlccrned
I kl 11'.l·l·
(2) The Open Access cus10mers shall abide by the
Grid Code, the Sta1e Grid Code and instmctions giv~n bv
St:lte Translllission Utility,the State Load Dispatch CeIl(r~
and other au(horities from (ime 10 time.
(3) The Open Access customer shall abide by the
provisions of the Act, rules and regulations C:lnd the
directions, guidelines and Orders oHIle Commission ll111de
from time to time.
]5. Infonnatiol1 System.- The State Load Despatch
Centre shall maintain the following infomlation on their
websites in a separate web-page titled ··Open Access
lnfonnalion" :
(I) A status report on the current short-term
customers.indicC:lting :-
(a) Name of the customer;
(b) Period ofthe access granted (start date/time and
end date/time);
(c) Point(s) of injection;
(d) PoiJ1((s) ofdrawal;
(e) TransmissionlDistribution system used (in temlS
of area and ownership);
(f) Reserved capacJty; and
Applicable rate (Rs. per MW per day)(g)
(2) MonOl-wise and year-wise report on post shon-
teml customers indicating :-
(a) NaJJ1e ofilie customer;
(b) Period of the access granted (start date/time and
end date time);
(c) Poinl(s) of injection;
(d) Point(s) ofdrawal;
(e) TransmissionlDistribution systems used;
(f) Reserved capacity;
(g) Applicable rate (Rs per MW per day); and
(ll) Actual load factor.
]6. Dispute Resolution.-(l) The complaints
rcgarding all grievances and disputes relating to open
access shall be made to the State Trilllsmission Utility or
State Load Dispatch Centre, as tJle case may be, which
may investigate and endeavour to resolve the grievance
anucabJy.
(2) if State Transmission Utility or State Load
Dispatch Centse IS unable to redress the grievance or
complaint or dispute, Ole matter may be referreu to Llle
Commission, by the St(lte Transmission Utility or Sfate
Loarl DispW']j Centre as the case DlflYhr., for :l~jlldic;JlioJl
17. Issue of Onl(~rs and Practice Directions.- Subject
10 the pI\J\'i.~iulIs uf [Ill' Ad, <1IU.Ilhes~ regulations. the
COJl1l1llssion Illay, frolll timc 10 time, issllc Orders and
Practice Directions in regard to the implementation ofthcsc
regulations and procedure to be followed 011 various
matlers. whiclt the. COll1missioll has becn empowered h
tJlese reglll,ltions to direct and matlers incidental or ancilla n
thereto.
) 4 DELHl GAZETTE E'>"''TRAORDfNARY
18. Powers to Remove Difticu)tie~~Jfany difficult)' aJises
in gi\illg effect 10 an~' of Ihe provisions of these
regulations, Ihe COJlUllissioll may do or IInder!ake to do
things or by a gt:JJcnll or special order, di rect the
Tran f)lission or Distribution Licensee, 10 take suitable
action, nOI being inCOllsist nl with tlle Act, which appears
to the CommissiOll 10 be necessary or expedient for the
purpose of removing difficu!tjes.
19. })owcr to Amcnd.-The Commi sion Illay, at allY time
va1)', aj{cr or modi (y ,lilY provi ion oftlles regulations.
20. rn(Juidcs and Jnvcstiga(ions.-AIJ inquiries,
investigation and ,ldjudic<'ltion shall be done by the
COlllrnissionfhroliPhaproc dill a pertheprovisionsof
DERC (Collduct of Business) Regul<l!ions, 200).
SOMIT DASGUPTA, Sec)'
$ANDEEP KUMAR., AddJ. Seey (Power)
I rlni~'{: 1:\ th:.: :d;i/i.lt',l.'f (;p\,i uf Inti':t Pr(':-;~: Rin!" HI..):nl. \!;-l:-.';lrHlfl. NL'\'\' D"':hi~}1{}U()4
a!1d i'llhl!',hcd hv the Controller oj Pllhlic;,t;ons, Delhl,j jO()54.
Previous and next
Questions people ask
Is regulation 20 of Delhi Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2005 still in force?
No repeal of Delhi Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2005 is recorded.