Regulation 35, JSERC (open access inter state transmission & distribution) regulation 2005: Information System
JSERC (open access inter state transmission & distribution) regulation 2005 - Regulation 35
Text of regulation 35
Information System
35. Information System.-Each State Load Despatch Centre shall post
following information on their websites in a so separate web page titled "Open
access information"
(i) Floor rate of rupees per MW per day for the short-term customers {ST _RATE)
for each system of the State Transmission Utility or the State Electricity Board or
any other transmission/distribution licensee with details calculations in support of
such rate in respect of all the transmission/distribution licensees situated within the
State.
(ii) A status report on the current short-term customers indicating:
(a) Name of customers;
(b) Period of the access granted.(start date and end date);
(c) Point(s) of Injection;
(d) Point(s) of drawal;
(e) Transmission system/distribution system used (in terms of region and
ownership;
(f) Reserved capacity; and
(g) Applicable rate (Rs. per MW per day).
Note.-The status report shall be updated upon every change in status.
(iii) Month-wise and year-wise on past short-terms customers indicating:
(a) Name of.the customers;
(b) Period of the access granted (start date and end date);
(c) Point(s) of injection;
S. No. Phases Contracted electrical Date from which Open Access
power. shall be allowed to open
access customers
1 Phase I 25 MW and more November 1, 2005
2 Phase! 10 MW or more April 1, 2006
3 Phase II 1 MW or more April 1, 2008
(iv) The collection and disbursement of the unscheduled Inter-change charges
and the reactive energy charges shall be governed In accordance with the procedure
and methodology specified by the Commission from time to time.
34. Phasing of Open Access.-Open Access customers shall bev allowed
to avail access to the transmission system and distribution system in the following
phases:
[ ~egs. 33-35 Jharkhand L.ocai Acts 106]
I'
l
I I
I
!
I
1 ·
I
I.,
!
(v) The information regarding average energy losses for the previous 12
months in case of Trensrnisslon system and in case of distribution
system voltage level wise for the last financial year.
36. The publication of the web-based lnfor;,,ation system shall commence
within 90 days in case of the State Load Despatch Centre. All licensees shall-make
available the above information to State Load Despatch Centre.
37. STU and Transmission licensees shall declares current long-term customers
using their system (including self-use and use by unbundled agencies which were
previously integrated) with details thereof either on their own websites or on the
website of the Load Despatch Centre within 180 days.
Note.-This list shall be updated as and when change in status takes place.
Previous and next
All provisions of JSERC (open access inter state transmission & distribution) regulation 2005
Questions people ask
Is regulation 35 of JSERC (open access inter state transmission & distribution) regulation 2005 still in force?
No repeal of JSERC (open access inter state transmission & distribution) regulation 2005 is recorded.