LawGrids logoLAWGRIDS.ORG

Regulation 20, JSERC (open access inter state transmission & distribution) regulation 2005: Unscheduled Inter-change (UI) charges

JSERC (open access inter state transmission & distribution) regulation 2005 - Regulation 20

Text of regulation 20

Unscheduled Inter-change (UI) charges

20. Unscheduled Inter-change (UI) charges.-(i) The mismatch betwesn the scheduled and the actual drawal at drawal point(s) and scheduled and the actilial injection point(s) shall be met from the grid and shall be governed ur pricihg mechanism applicable to the Inter-State transactions as per ABT Tariff. · I, (ii) A separate bill for UI charges shall be issued to the direct customers a,nd in case of the embedded customers, a composite U! bill for the.State as a whole sliall be issued the segregation for which shall be done at the State level by SLDC. JI

Previous and next

All provisions of JSERC (open access inter state transmission & distribution) regulation 2005

Questions people ask

Is regulation 20 of JSERC (open access inter state transmission & distribution) regulation 2005 still in force?

No repeal of JSERC (open access inter state transmission & distribution) regulation 2005 is recorded.