LawGrids logoLAWGRIDS.ORG

Regulation 5, JSERC (open access inter state transmission & distribution) regulation 2005: Criteria for Allowing Access

JSERC (open access inter state transmission & distribution) regulation 2005 - Regulation 5

Text of regulation 5

Criteria for Allowing Access

5. Criteria for Allowing Access.-(i) (a) The long-term access shal! be allowed to the Intra-State transmission system in accordance with the transmission­ planning criterion stipulated in the Grid Code. (b) The long-term access to distribution system shall be allowed in accordance with distribution planning criteria of the distribution licensee approved by the Commission. (o) Provided that !orig-term access to intra-State transmission system and distribution system shall _be allowed to Open Access Customers phasewise from the dates as specified in Clause 34 of these Regulations. (ii) The short-terms access to Intra-State transmission system and distribution system shall be allowed, if request can be accommodated by utilizing:- · (a) Inherent design margins; (b) Margins available due to variation· in power flows: and (c) Margins available due to in-built spare capacity created to cater to future load growth; .inarknano Local Acts SS] I I I. (d} Margins available due to part use/non-use or capacity: Provided that short-terms access shall be allowed to Open Access Customers phase wise from dates as specified Clause 34 of these Regulations.·

Previous and next

All provisions of JSERC (open access inter state transmission & distribution) regulation 2005

Questions people ask

Is regulation 5 of JSERC (open access inter state transmission & distribution) regulation 2005 still in force?

No repeal of JSERC (open access inter state transmission & distribution) regulation 2005 is recorded.