Regulation 5, JSERC (open access inter state transmission & distribution) regulation 2005: Criteria for Allowing Access
JSERC (open access inter state transmission & distribution) regulation 2005 - Regulation 5
Text of regulation 5
Criteria for Allowing Access
5. Criteria for Allowing Access.-(i) (a) The long-term access shal! be
allowed to the Intra-State transmission system in accordance with the transmission
planning criterion stipulated in the Grid Code.
(b) The long-term access to distribution system shall be allowed in accordance
with distribution planning criteria of the distribution licensee approved by the
Commission.
(o) Provided that !orig-term access to intra-State transmission system and
distribution system shall _be allowed to Open Access Customers phasewise from
the dates as specified in Clause 34 of these Regulations.
(ii) The short-terms access to Intra-State transmission system and distribution
system shall be allowed, if request can be accommodated by utilizing:- ·
(a) Inherent design margins;
(b) Margins available due to variation· in power flows: and
(c) Margins available due to in-built spare capacity created to cater to future
load growth;
.inarknano Local Acts SS]
I
I
I.
(d} Margins available due to part use/non-use or capacity:
Provided that short-terms access shall be allowed to Open Access Customers
phase wise from dates as specified Clause 34 of these Regulations.·
Previous and next
← Regulation 4Categorisation of Transmission/Distribution CustomersRegulation 6 →Criteria for Allotment/Reservation of Transmission/Distribution Capacity
All provisions of JSERC (open access inter state transmission & distribution) regulation 2005
Questions people ask
Is regulation 5 of JSERC (open access inter state transmission & distribution) regulation 2005 still in force?
No repeal of JSERC (open access inter state transmission & distribution) regulation 2005 is recorded.