LawGrids logoLAWGRIDS.ORG

Regulation 17, The Himachal Pradesh Electricity Regulatory Commission (General Conditions of Distribution Licence) Regulations, 2004: Electricity supply code and distribution code

The Himachal Pradesh Electricity Regulatory Commission (General Conditions of Distribution Licence) Regulations, 2004 - Regulation 17

Text of regulation 17

Electricity supply code and distribution code

17. Electricity supply code and distribution code. - (1) The distribution licensee shall abide by the electricity supply code and distribution code as may be directed by the Commission from time to time. (2) (a) The electricity supply code may amongst others provide for recovery of electricity charges, intervals for billing of electricity charges, disconnection of supply for non-payment thereof, restoration of supply of electricity, tampering, distress or damage to electrical plant, electric lines or meter, entry of the distribution licensee or of any person acting on his behalf for disconnecting supply and removing the meter, entry for replacing, altering or maintaining electric lines or electrical plant or meter. 16 Compendium of HPERC Regulations, March 2021 (b) The Commission may, at the instance of the licensee, issue directions relieving the licensee of its obligations under the electricity supply code in respect of such parts of the licensee’s distribution system and to such extent as may be directed by the Commission. (3) In addition to the electricity supply code the Commission may from time to time approve at the request of the distribution licensee other conditions applicable for supply of electricity by the distribution licensee in the area of distribution. (4) The distribution code may amongst others, cover all material technical aspects relating to connections, and the operation and use of the distribution system including the operation of the electrical lines and electrical plant and apparatus connected to the distribution system in so far as relevant to the operation and use of the distribution system and shall include, but not be limited to, the distribution planning and connection code containing - (a) planning code specifying the plan for laying the distribution lines and the service lines in the area of supply, the technical and design criteria and procedures to be applied by the licensee in the planning and development of the licensee’s distribution system; and (b) connection conditions specifying the technical, design and operational criteria to be complied with by any person connected or seeking connection with the licensee’s distribution system; and the distribution code specifying the conditions under which the licensee shall operate the licensee’s distribution system and under which persons shall operate their plant and/or distribution system in relation to the licensee’s distribution system, in so far as it is necessary to ensure the security and quality of supply and safe operation of the licensee’s distribution system under both normal and abnormal operating conditions. (5) The distribution code shall be designed so as to permit the development, maintenance and operation of an efficient, co-ordinated and economical distribution system. (6) The distribution licensee shall, till the electricity supply code conditions of supply or distribution code comes into force, follow the same practices which have been followed by the supply licensees in the State with such modifications as may be directed or permitted by the Commission. (7) The distribution licensee shall from time to time, as appropriate, review the distribution code and its implementation in consultation with the transmission licensee, trading licensee, generating companies and such other persons as the Commission may order. The licensee shall also undertake such review as and when directed to do so by the Commission. Following any such review, the licensee shall send to the Commission - (a) a report on the outcome of such review; (b) any proposed revisions to the distribution code as the licensee (having regard to the outcome of such review) reasonably thinks fit for the achievement of the objectives of the distribution code and his licence; and (c) all written representations or objections received during such review. Compendium of HPERC Regulations, March 2021 17 (8) All revisions to the distribution code electricity supply code and the conditions of supply shall require approval from the Commission. (9) The licensee shall make available to any person requesting for it, copies of the distribution code, the electricity supply code and conditions of supply and practices thereto in force at the relevant time, at a price not exceeding the reasonable cost of duplicating it. (10) A compilation of the existing codes and practices relating to construction of the licensee’s distribution system and its distribution facilities shall be filed with the Commission by the licensee within 90 days of the grant of his licence. The licensee shall follow the existing codes and practices with such modification as the Commission may direct from time to time. The construction practices shall be reviewed and upgraded by the licensee from time to time, as appropriate, based on relevant technological improvements and changes.

Previous and next

All provisions of The Himachal Pradesh Electricity Regulatory Commission (General Conditions of Distribution Licence) Regulations, 2004

Questions people ask

Is regulation 17 of the Himachal Pradesh Electricity Regulatory Commission (General Conditions of Distribution Licence) Regulations, 2004 still in force?

No repeal of the Himachal Pradesh Electricity Regulatory Commission (General Conditions of Distribution Licence) Regulations, 2004 is recorded.