Regulation 17, The Himachal Pradesh Electricity Regulatory Commission (General Conditions of Distribution Licence) Regulations, 2004: Electricity supply code and distribution code
The Himachal Pradesh Electricity Regulatory Commission (General Conditions of Distribution Licence) Regulations, 2004 - Regulation 17
Text of regulation 17
Electricity supply code and distribution code
17. Electricity supply code and distribution code. - (1) The distribution licensee shall
abide by the electricity supply code and distribution code as may be directed by the
Commission from time to time.
(2) (a) The electricity supply code may amongst others provide for recovery of
electricity charges, intervals for billing of electricity charges, disconnection of supply for
non-payment thereof, restoration of supply of electricity, tampering, distress or damage to
electrical plant, electric lines or meter, entry of the distribution licensee or of any person
acting on his behalf for disconnecting supply and removing the meter, entry for replacing,
altering or maintaining electric lines or electrical plant or meter.
16 Compendium of HPERC Regulations, March 2021
(b) The Commission may, at the instance of the licensee, issue directions relieving the
licensee of its obligations under the electricity supply code in respect of such parts of the
licensee’s distribution system and to such extent as may be directed by the Commission.
(3) In addition to the electricity supply code the Commission may from time to
time approve at the request of the distribution licensee other conditions applicable for
supply of electricity by the distribution licensee in the area of distribution.
(4) The distribution code may amongst others, cover all material technical aspects
relating to connections, and the operation and use of the distribution system including the
operation of the electrical lines and electrical plant and apparatus connected to the
distribution system in so far as relevant to the operation and use of the distribution system
and shall include, but not be limited to, the distribution planning and connection code
containing -
(a) planning code specifying the plan for laying the distribution lines and the
service lines in the area of supply, the technical and design criteria and
procedures to be applied by the licensee in the planning and development of
the licensee’s distribution system; and
(b) connection conditions specifying the technical, design and operational criteria
to be complied with by any person connected or seeking connection with the
licensee’s distribution system; and the distribution code specifying the
conditions under which the licensee shall operate the licensee’s distribution
system and under which persons shall operate their plant and/or distribution
system in relation to the licensee’s distribution system, in so far as it is
necessary to ensure the security and quality of supply and safe operation of the
licensee’s distribution system under both normal and abnormal operating
conditions.
(5) The distribution code shall be designed so as to permit the development,
maintenance and operation of an efficient, co-ordinated and economical distribution
system.
(6) The distribution licensee shall, till the electricity supply code conditions of
supply or distribution code comes into force, follow the same practices which have been
followed by the supply licensees in the State with such modifications as may be directed or
permitted by the Commission.
(7) The distribution licensee shall from time to time, as appropriate, review the
distribution code and its implementation in consultation with the transmission licensee,
trading licensee, generating companies and such other persons as the Commission may
order. The licensee shall also undertake such review as and when directed to do so by the
Commission. Following any such review, the licensee shall send to the Commission -
(a) a report on the outcome of such review;
(b) any proposed revisions to the distribution code as the licensee (having
regard to the outcome of such review) reasonably thinks fit for the
achievement of the objectives of the distribution code and his licence; and
(c) all written representations or objections received during such review.
Compendium of HPERC Regulations, March 2021 17
(8) All revisions to the distribution code electricity supply code and the conditions
of supply shall require approval from the Commission.
(9) The licensee shall make available to any person requesting for it, copies of the
distribution code, the electricity supply code and conditions of supply and practices thereto
in force at the relevant time, at a price not exceeding the reasonable cost of duplicating it.
(10) A compilation of the existing codes and practices relating to construction of
the licensee’s distribution system and its distribution facilities shall be filed with the
Commission by the licensee within 90 days of the grant of his licence. The licensee shall
follow the existing codes and practices with such modification as the Commission may
direct from time to time. The construction practices shall be reviewed and upgraded by the
licensee from time to time, as appropriate, based on relevant technological improvements
and changes.
Previous and next