The Madhya Pradesh (investment in power generation project) Policy 2012
Notification - Electricity Act, 2003
- Kind: Notification
- Under: Electricity Act, 2003
Text of this notification
~~ wwwogovtpressmponic.in
it ~~~ fc8:rr ~ "WfiCff %.
~~r(l~
(~)
W~~~
~ 254J ~, ~,~ 28 ~ 2012-~ 7, ~ 1934
Bhopal, the 28th May, 2012
POLICY
No. F- 1- 011 09 1 XIII: The Government of Madhya Pradesh (GoMP) formulates this Policy, namely
the Madhya Pradesh (Investment in Power Generation Projects) Policy, 2012 for implementation
of Thermal power projects in the State by Independent Power Producers (IPPs).
This Policy will be applicable to all future Independent Power Producers (IPPs) who intend to setup
Thermal power projects and seek assistance of Government of Madhya Pradesh in this regard. This
policy supersedes provisions of Madhya Pradesh (Investment in Power Generatipn Projects)
Policy, 2010 in so far as it relates to the policy for future projects.
To meet the objectives of this Policy, the GoMP, on a first come first serve basis, shall execute a MoU
as per annexure 1 with only those developers who meet the qualification criteria according to this
Policy. However, it shall not be binding on the GoMP to execute a MoU, with any Developer, who
meets all the qualification criteria under this Policy.
A. Policy for IPPs
Henceforth, MoUs under this Policy shall be executed and be governed by the following Policy
provisions.
507
508 ll~ ~, fc;qicn 28 ~ 2012
1. Eligibility Criteria for selection of Developer
a. Technology: A power project of any capacity based on the conventional fuel (coal or gas),
but preferably utilizing super critical! ultra super critical! CFBC technology or integrated coal!
IGCe technology or carbon sequestration technology shall be developed.
b. Technical Criteria: To demonstrate technical capacity and experience, the Developer !IPP
company signing an MoU shall satisfy the following:
i. The Developer must have experience in development! construction of projects (not
necessarily in the power sector) during the last ten (10) years, whose aggregate
capital cost must not be less than the amount equivalent to Rs. 0.75 crore per MW of
the maximum capacity (expected gross capacity) of the power station proposed to be
set up. Out of these projects, the capital cost of at least one project should be
equivalent or more than Rs. 0.125 crore per MW of the maximum capacity (expected
gross capacity) of the power station proposed to be set up. For this purpose, capital
expenditure incurred on projects that have been completed at least seven (7) days
prior to the date of the Expression of Interest (EOI) shall be considered. Further, in
case a clearly identified part of a project has been put into commercial operation, the
capital expenditure on such part of the project shall be considered, if certified as
completed, by the statutory auditor of such Developer.
D.evelopment of project shall mean successful commissioning of a project in which
the single company !Iead member in case of a consortium! such company(ies) that
directly or indirectly control(s)1 or is controlled by or is under common control with the
single company or the lead member of the consortium held equity stake of not less
than twenty-siX percent (26%) from the time of financial closure till the time of
commissioning of such project(s).
ii. The Developer signing a MoU for developing a power project under this Policy may
be a single company or a consortium of companies coming together to develop the
Power Project.
iii. However, in case of a consortium, one of the member companies shall be identified
as the lead member in the consortium. The criterion (i) above shall apply to the lead
member in case of a consortium; in which case the Lead Member's share in the SPY
shall not be less than fifty one percent (51 %). Change in constituents of the
consortium, other than the lead member, will be permissible till the signing of the
Implementation Agreement (IA). However, the change in the constituents of the
consortium, except for the lead member, after signing of lA, and before executing the
PPA, shall require express written consent of the Secretary (Energy), GoMP. Post
execution of the PPA, this shall be governed by the prOVisions of the PPA. Change in
the lead member shall not be permitted at any stage.
iv. In case the Developer is a single company, it shall sign the MoU and the
Implementation Agreement under this Policy with the GoMP. In case the Developer is
1 Control shall mean ownership by one (1) company of at least twenty six percent (26%) of the voting rights and
equity of the other company.
1=[~ ~, fc::;:rfcn 28 ~ 2012 508 (1)
a consortium, then the lead member, on behalf of the consortium, or the SPY, shall
sign the MoU and Implementation Agreement under this Policy with the GoMP.
c. Financial criteria: The Developer signing theMoU must fulfill following minimum financial
requirements:
i. Net-worth: Rs. 0.50 crore or equivalent US$2 per MW of the proposed capacity of the
project proposed to be set up, if the maximum capacity does not exceed 2,000 MW.
In case the maximum capacity of the project proposed to be set up exceeds 2,000
MW, the net worth requirement shall be Rs. 1,000 crores or Rs. 0.25 crore per MW or
equivalent US$ of the proposed capacity whichever is higher. The above computation
shall be derived from any of the past three (3) years audited annual accounts of the
Developer.
In case the Developer has issued any fresh equity capital during the current financial
year but until a date seven (7) day prior to the submission of the EOI, the same shall
be permitted to add to the Developer's Net-worth subject to the statutory Auditor of
the Developer certifying to this effect.
Net-worth for this purpose shall be compute~ as below
• Net-worth
:::
Add:
Subtract:
Subtract:
Subtract:
Share capital3
Reserves
Revaluation reserves
Intangible assets
Miscellaneous expenditures to the extent not written
off and carry forward losses.
ii. Annual Turnover: Rs. 1.20 crore or equivalent US$ per MW of the proposed
capacity of the project to be set up, if the maximum capacity does not exceed 2,000
MW. In case the maximum capacity of the project to be set up exceeds 2,000 MW,
the annual turnover requirement shall be Rs. 2,400 crore or Rs. 0.60 crore or
eqUivalent US$ per MW of the proposed capacity of the project, whichever is higher.
The above computation shall be derived from any of the past three (3) years aUdited
annual accounts of the Developer.
d. In case of interest expressed by a consortium under this Policy, the financial criteria shall be
met individually and collectively by all the Members in the Bidding consortium and shall be
computed in proportion of their proposed equity stake in the SPY as mentioned in the
consortium agreement.
e. For the purposes of meeting the financial criteria, the single company I lead member of the
consortium may use the financial capability of such company(ies) that directly or indirectly
controls or is controlled by or is under common control with the single company I lead
member of the consortium.
2 The US$-Indian Rupee Exchange rate for the purpose of this Policy shall be considered as the corresponding IT buying rate specified by
the State Bank ofIndia seven days before the date of signing the MoU.
) Share capital for this purpose shall only inclu&" equity share capital with voting rights
508 (2) 11~ ~,~ 28 ~ 2012
f. For the purpose of meeting the technical and financial criteria, only unconsolidated audited
annual accounts shall be used. However, audited consolidated annual accounts of the
Developer being a single company I lead member of a consortium I SPV may be used for the
purpose of financial criteria provided such single company I Lead member in case of a
consortium I SPV has at least twenty-six percent (26%) equit-y-in-each-company whose
accounts are merged in the audited consolidated accounts and provided further. that the
financial capability of such companies (of which accounts are being merged in the
consolidated accounts) shall not be considered again for the purpose of evaluation of the
financial criteria.
g. In case of a consortium slgnmg a MoU under this Policy, the lead member shall be
responsible for performance of all the duties and obligations of the Developer under this
Policy.
2. Administrative Support
a. Land: It shall be the responsibility of the Developer to identify the project site. The
Developer I SPV shall undertake a preliminary feasibility of acquiring land at the
potential sites, make all possible endeavors to procure land and only if necessary. the
Government may be approached to for land acquisition. Government may facilitate
acquisition of private land subject to the provisions of Land Acquisition Act and
prevalent Rehabilitation and Resettlement policy. Available Government land can be
allotted for such !PPs as per prevalent Government regUlations.
b. Water: The State Government, through its Energy Department will provide necessary
assistance for allocation of water from the source identified by the developer, in
accordance with the prOVisions of the applicable law and rules subject to availability.
c. Fuel Sourcing: The responsibility of sourcing and transportation I supply of fuel to
the project shall lie with the Developer. The State Government may recommend the
fuel linkage to the project covered under this Policy.
d. Power Evacuation: The State Government, through the State Transmission Utility or
other assignees, will facilitate the clearances and approvals for connecting the Power
Station to the nearest STU I CTUsubstation. However, the responsibility for obtaining
the clearances and approvals shall remain with the Developer.
The Developer would need to bear the cost of dedicated transmission line required to
connect the project to STUICTU, cost of interfacing at both ends, and cost of
replacement I up gradation I augmentation of existing equipment or transmission
systems etc.
3. Supply of Power under this policy to GoMP or its nominated agency
It will be binding on the Developer to sell power to the extent of ten percent (10%) of the total
power generated (ex-bus) to the GoMP or its nominated agency at variable cost, as
determined by the Appropriate Electricity Regulatory Commission.
4, Charge on sale of electricity outside the state
a, It will be binding on the Developer to contribute on annual basis a contribution @ 6
paise per unit of thEl energy sent out of the State from the Thermal Power Plant,
during the relevant year as per procedure prescribed by the State Govt. in this regard.
508 (3)
b. The amount to be deposited as stated above will be over and above the power
provided to the state as per the provisions of Clause 3 above, but will not be made for
energy sold within the State of Madhya Pradesh.
5. Implementation methodology
a. A Developer, intending to setup an Independent Power Project under this Policy, shall
be required to enter into a MoU with the Energy Department, GoMP.
b. The MoU signed shall remain valid for twelve (12) months from the date of signing of
such MoU. This period could be extended at the discretion of the GoMP.
c. The Developer, signing a MoU under this Policy, shall be required to submit a
Detailed Project Report (DPR) before signing the Implementation Agreement. This
DPR should contain the details of generation technology, fuel, water and land
utilization, environment pollution control technology, preliminary financial viability,
expected tariffs, etc.
d. The activities and milestones to be achieved by the Developers shall follow the
schedule and timelines given in item 6. Unless extended by GoMP, non-compliance
of the schedule within specified timelinas shall result in cancellation of MoU and
withdrawal of all facilities provided to the Developer.
e. The Secretary (Energy), GoMP will regularly monitor the implementation of the
project.
6. Milestones and its timeline to be achieved by the Developer
Sr. Activitiesl
Documents to be submitted
No. Milestone
TimeJine by the Developers on
achievement of milestone
1 Technical and Before signing the Detailed Project Report
commercial Implementation Agreement (DPR)
Feasibility studies (IA)
2 Water Allocation Before·signing the In Principle Water Allocation
Implementation Agreement
(IA)
3 Land Acquisition At least twenty five percent Land Registration I Transfer
(25%) of identified land deed I Land lease agreement
acquired before signing the
Implementation Agreement
(JA)
4 Environment Impact Before signing the Copy of ToR issued for
Assessment Implementation Agreement appointment of consultant for
(IA) carrying out E1A
7. An Implementation Agreement (IA) will be signed after achieving the above milestones within
the validity period of the MoU as per the proforma attached as annexure 2 to this policy.
508 (4) 1=[~ ~,~ 28 ~ 2012
8. Power to remove difficulties
Notwithstanding anything contained in the foregoing sections of the Madhya Pradesh
(Investment in Power Generation Projects) Policy, 2012, the Government of Madhya Pradesh,
through the Energy Department, shall have the powers to relax I issue clarifications, if any, on
any matter related to the interpretation of any provisions under this Policy in consultation with
the concerned State Govt. Departments I Agencies, including necessary changes in the MoU,
relaxation in the qualification criteria, Implementation Agreement and the standard power
purchase agreement
This Policy shall come into effect from the date of issuance and shall remain effective until further
orders.
MOHAMMED SULEMAN, Secy. (Energy).