Delhi Supply Code and Performance Standards (Removal of Difficulty) Second Order, 2018
Order - THE ELECTRICITY ACT 2003
- Kind: Order
- Under: THE ELECTRICITY ACT 2003
Text of this order
Page 1 of 2
Delhi Electricity Regulatory Commission
Viniyamak Bhavan, C-Block, Shivalik, Malviya Nagar, New Delhi-110017
F.17(174)/DERC/Engg./17-18/5856
Order
(Date of Order: 06.02.2018)
Whereas the Delhi Electricity Regulatory Commission (Supply Code and Performance
Standards) Regulations, 2017 (hereinafter referred to as Regulations) provides for release
of temporary electricity connection on payment of certain charges.
And whereas Regulations 16(14) and 16 (15) of the Regulations provide for extension of
the period of temporary connection on the payment of applicable electricity charges,
provided it is applied at least one day before the date of expiry of temporary
connection.
And whereas for release of temporary connection, as per Regulation 16(9)(i) of the
Regulations, along with other charges, a onetime non-refundable charge for
consumables, non-retrieval of equipment etc. is payable by the consumer.
And whereas DERC Order dated 31.8.17 regarding schedule of charges and procedure
under the Regulations provides for separate rates of onetime non-refundable charges in
respect of temporary connection at HT Supply and LT Supply.
And whereas, the distribution licensees are facing difficulty for want of clarification in
regard to the following issues of temporary connection:
(i) Whether onetime non-refundable charges for consumables include the charges
for service line,
(ii) Whether onetime non-refundable charges are to be taken again from the
applicant even if the period of connection is extended before the date of expiry of
temporary connection,
(iii) The rates of charges payable by the consumer, who applies for temporary
connection at LT supply, load of which qualifies under HT supply category.
Now, therefore, the Delhi Electricity Regulatory Commission in exercise of its powers
conferred under Regulation 85 of the Regulations, hereby makes this Order in respect of
the provisions for release of temporary connection, not inconsistent with provisions of
the Act and the Regulations, to remove the difficulty, namely:-
1. Short Title & Commencement :- (1) This order shall be called Delhi Electricity
Supply Code and Performance Standards (Removal of Difficulty) Second Order, 2018.
(2) This order shall come into force on the date of its issue.
Page 2 of 2
2. Temporary connection:
2.1 Onetime non-refundable charges: (1) Onetime non-refundable charges for
consumables include the charges for service line.
(2) The distribution licensee shall provide the service line required for release of
temporary connection, which shall remain the property of the distribution licensee.
2.2 Demand of onetime non-refundable charges again: (1) If the temporary
connection is applied before the date of its expiry, the distribution licensee shall not,
again, demand one-time non-refundable charges.
(2) The distribution licensee on receipt of the application from the consumer for
extension of temporary supply shall immediately raise the bill for the previous period
after adjusting the security deposit and the consumer shall make the payment of the
balance amount, if any, before the extension of temporary connection.
(3) The balance amount of security deposit of existing connection, if any, available
with the distribution licensee after adjustment of final bill shall be accounted for in the
new demand note for the security deposit.
2.3 The applicable charges for temporary connection at LT supply, load of which
qualifies under HT supply category: (1) On receipt of an application for
temporary connection at LT supply, load of which qualifies under HT supply category,
the distribution licensee shall provide connection at LT supply and shall demand the
non-refundable charges notified in DERC Order dated 31.8.2017 both for HT supply and
LT supply.
(2) The metering of such temporary connection shall be done at HT supply point.
Illustration: For an application for temporary connection at LT supply for a load 925
kVA, which qualifies for HT supply, the non-refundable charges to be payable by the
applicant shall be as under:
Load Demanded HT Charges LT Charges Total
925 kVA Rs.9,25,000/-
(925x1000)
Rs.1,16,250/- {Rs.1,00,000/-
(4x25,000) for 860 (4x215)
kVA based on Rs.25,000/-
for every 215 kVA and
Rs.16250/- (65x250) for
balance 65 kVA based on
Rs. 250 per kVA subject to
a maximum of Rs.25,000/-}
Rs.10,41,250/-
Sd/-
(B. P. Singh)
Member