( 129 )
This is Digitally Signed Gazette. To verify, visit :
https://egazette.chd.gov.in
GOVERNMENT OF INDIA
Published by Authority
No. 015] CHANDIGARH, FRIDAY, JANUARY 30, 2026 (MAGHA 10, 1947 SAKA)
CHANDIGARH ADMINISTRATION
ENGINEERING DEPARTMENT
Notification
The 30th January, 2026
No.G1/2026/42.—In exercise of the powers conferred under Sections 131, 133 and 134 of
the Electricity Act, 2003 as amended from time to time read with Government of India, Ministry of
Home Affairs, New Delhi Notification bearing No. S.O.721(E) dated 22nd June, 2004 and all other
powers enabling him in this behalf, the Administrator, Union Territory, Chandigarh hereby makes
the following amendments in the Chandigarh Electricity Reforms Transfer Scheme, 2025
(hereinafter referred to as the “Principal Transfer Scheme”).
1) Short Title, Extent and Commencement
i. This Scheme may be called “Chandigarh Electricity Reforms Transfer (First Amendment)
Scheme, 2026.”
ii. It extends to the whole of the Union Territory of Chandigarh.
iii. It shall come into force on the date of its notification in the official gazette.
2) That clause (I) of Para 1 of Part B of the Principal Transfer Scheme shall be substituted as
under namely:
“(I) "Opening Balance Sheet" shall mean the opening balance sheet of the Company and
the terms and conditions thereof as provided in Schedule 'E1'. The figures mentioned in the
said schedule are tentative and subject to revision, if any, by the Hon’ble JERC so as to
reflect the exact position of the assets, liabilities, personnel and proceedings transferred to
the company on 31.01.2025."
3) That in Para (1) in Part D of the Principal Transfer Scheme, the following amendments shall be
made: -
(i) clause (b1) shall be inserted after clause(b) namely:
Digitally signed by
SURESH BALA
Date: 2026.01.30
16:01:19 IST
Reason: Published
Location:
Signature Not Verified
130 CHD. ADMN GAZ. JAN. 30, 2026 (MAGHA. 10, 1947 SAKA)
This is Digitally Signed Gazette. To verify, visit :
https://egazette.chd.gov.in
"(b1) In addition to the assets and liabilities specified in Schedule 'B', such other assets as
are identified and approved for transfer by the Chandigarh Administration shall stand
transferred to CPDL and are enumerated in Schedule 'B-2', which shall form part of this
Scheme."
(ii) clause (c) shall be substituted as under:
"The Personnel as set out in Schedule-'D' shall be transferred and assigned to the
Company as provided under Part E of this Scheme except the personnel listed at
Sr. No. 198 of Schedule-'D' (as per "Adjustment Policy for Persons with Disabilities
(PwBD) of the Electricity Wing of the Engineering Department, UT Chandigarh,
2025", notified by the Chandigarh Administration on 03.01.2025).
4) That the following words and expressions shall be inserted in Para (2) of Part E of the Principal
Transfer Scheme after the words "Company" namely:
"The said committee shall come to an end by efflux of time once the Principal
Transfer Scheme shall become final after the expiry of twelve months from the date
of its notification."
5) That following para shall be inserted after para 8 in Part D of the Principal Transfer Scheme
"8.1; In addition to the assets and liabilities specified in Schedule 'C' of the Principal
Transfer Scheme, the assets, liabilities and obligations specified in Schedule 'C-1'
shall also vest with EWEDC.
6) That para (1) of Part E of the Principal Transfer Scheme shall be substituted as under:
"On the Transfer Date, the Personnel as per Schedule-'D' shall stand assigned to
undertake the services in the Company on as is where is basis except the personnel
listed at Sr. No. 198 of Schedule-D (as per "Adjustment Policy for Persons with
Disabilities (PwBD) of the Electricity Wing of the Engineering Department, UT
Chandigarh, 2025", notified by the Chandigarh Administration on 03.01.2025)."
7) In Schedule 'B' (1)(a) of the Principal Transfer Scheme, comma (,) shall be inserted between the
words and expressions "right of way" and "buildings".
8) That building detailed at Serial number 5 in Part 2 (iii) of Schedule B-1 of the Principal Transfer
Scheme shall stand omitted.
Note:
1. The Opening Balance Sheet of the Company along with other terms and conditions shall be
such are as specified in Schedule ‘E-1’.
By order and in the name of the Administrator
Union Territory of Chandigarh
(Sd.) . . .,
Secretary Engineering
Chandigarh Administration
CHD. ADMN GAZ. JAN. 30, 2026 (MAGHA. 10, 1947 SAKA) 131
This is Digitally Signed Gazette. To verify, visit :
https://egazette.chd.gov.in
Schedule ‘B-2’
Functions and Assets transferred to Company
Sr. No. Details
1. 66/11 KV and 33/11 KV Grid Sector-18 Chandigarh.
2. 66/11 KV Grid S/Stn. Sarangpur, Chandigarh.
3. 66/11 KV Grid S/Stn., Raipur Kalan, Chandigarh.
4. 33KV/11 KV Grid S/Stn., Industrial Area Ph-1, Chandigarh.
5. 33 & 66 KV Grid S/Stn. Sec-34, Chandigarh.
6. Office Building of Executive Engineer Electricity OP Division No-1 Sector-17,
Chandigarh.
7. Office Building of Executive Engineer Electricity OP Division No-4, Sector-34
Chandigarh
8. Office building of SDO-1, Sector-23, Chandigarh.
9. Office Building of SDO-5, Ind. Area Ph-1, Chandigarh
10. Office building of SDO-10, Sector-40, Chandigarh.
11. 1. 11 KV Indoor S/Stn. Sector-43A
2. 11 KV Indoor S/Stn. Sector-41A
3. 11 KV Indoor S/Stn. Sector-41B
4. 11 KV Indoor S/Stn. Sector-42B
5. 11 KV Indoor S/Stn. Sector-42C
6. 11 KV Indoor S/Stn., Sector-43B
7. 11 KV Indoor S/Stn., Sector-44A
8. 11 KV Cabin Type Sub Station., Sector-44A
9. 11 KV Cabin Type Sub Station., Sector-44B
10. 11 KV Indoor S/Stn., Sector- 44C
11. 11 KV Indoor S/Stn., Sector- 44D
12. 11 KV Cabin Type Sub Station., Sector-45A
13. 11 KV Indoor S/Stn., Sector -45A
14. 11 KV Cabin Type Sub Station., Sector-63
132 CHD. ADMN GAZ. JAN. 30, 2026 (MAGHA. 10, 1947 SAKA)
This is Digitally Signed Gazette. To verify, visit :
https://egazette.chd.gov.in
Schedule ‘C-1’
Functions and Assets not transferred to Company
Sr. No. Details
1. Division No. 2 Office Building, BBMB Complex, Ind.Area, Ph-1, UT Chandigarh.
2. Power Controller Office Building, BBMB Complex, Ind.Area, Ph-1, UT
Chandigarh.
3. Store Sub Division Building, BBMB Complex, Ind.Area, Ph-1, UT Chandigarh.
4. Consumer Grievance Redressal Forum (CGRF) Office Building, Sec-19, UT
Chandigarh.
5. Division No. 3 Office Building, Sector 19, UT Chandigarh.
6. Sub Div No. 2 Office Building, Sector 10, UT Chandigarh.
7. Sub Div No. 3 Office Building, Sector 18-C, UT Chandigarh.
8. Sub Div No. 4 Office Building, Sector 15-C, UT Chandigarh.
9. Sub Div No. 9 Office Building, Sector 43, UT Chandigarh
10. SCADA Centre Building, Sec-18, UT Chandigarh.
11. Computer Cell Office Building, Sec-17, UT Chandigarh.
12. Diesel Power House, Sec-26, UT Chandigarh.
13. 66 KV Grid Sub Station and 4-Nos. Power Transformers, BBMB Complex,
Ind.Area, Ph-1, UT Chandigarh.
14. 220 KV Ganguwal-Mohali line along with 4 No. Bays.
15. 66 KV line Dhulkote – BBMB line.
16. Residential Colonies/Quarters in Sec-28,52, New Power House (BBMB
Complex), Diesel Power House(Sec-26), Ind. Area Ph-1 & 2, 220 KV G/S/Stn
Kishangarh Manimajara, UT Chandigarh.
CHD. ADMN GAZ. JAN. 30, 2026 (MAGHA. 10, 1947 SAKA) 133
This is Digitally Signed Gazette. To verify, visit :
https://egazette.chd.gov.in
Schedule ‘E-1’
TENTATIVE OPENING BALANCE SHEET
As per the accounts on the Transfer Date i.e. 31.01.2025 (FY 2024-25), Opening Balance Sheet is
as under:
Liabilities Rs.
Equity 1,704,019988
Reserves 11,01,87,601
Current Liabilities
Power Purchase Payables 78,38,93,512
Statutory Dues Payable 21,904,045
Staff related liabilities 16,869,478
Deposit work receipts 264,947,547
Deposit and Retention from Suppliers and Contractors 44,738,755
Liability for Material 3,301,155
Interest Payable on CSD 96,491,025
Consumers Security Deposits 1,343,230,876
Total 4,38,95,83,982
Assets Rs.
Gross Block 5,878,065,007
Less: Accumulated Depreciation 3,592,107,232
Net Block 2,285,957,775
Capital Work in Progress -
Current Assets
Inventory
16,376,973
Sundry Debtors
642797460
Short-term Loans and Advances
4,729,873
Receivables from UT 1,439,721,901
Total 4,38,95,83,982
The Opening Balance Sheet for the company has been prepared based on the audited
accounts of EWEDC as on 31.01.2025 (FY 2024–25) by AG UT, except for Consumer
134 CHD. ADMN GAZ. JAN. 30, 2026 (MAGHA. 10, 1947 SAKA)
This is Digitally Signed Gazette. To verify, visit :
https://egazette.chd.gov.in
Security Deposits amounting to
31.01.2025, against 166.83 Cr. (including interest) already stand deposited with the company.
The final revision shall be done with the purpose of reflecting the exact position of the Assets,
Liabilities, Personnel and Proceedings transferred to the Company on the Transfer Date subject to
approval by Hon’ble JERC.
The Opening Balance Sheet for the Company has been prepared to reflect all movements up to
the Transfer Date, in accordance with the following principles:
I. Gross Fixed Assets Accumulated Depreciation and CWIP as per movements based on
audited numbers
II. Movement in equity value as per principles of JERC approval.
III. Inventory, Short Term Loan and Advances, Staff Related Liabilities, Deposit Work Receipts,
Deposit and Retention from Suppliers & Contractors, Liability for Material, Interest Payable
on CSD shall be updated with audited numbers as on Transfer Date.
IV. Consumer Security Deposit shall be updated with value equal to the consumer security
deposits of all consumers as reflected in the consumer database as on Transfer Date.
V. Receivables from Administration shall be equal to sum of revised Consumer Security Deposit
and revised Interest Payable on CSD as on Transfer Date.
VI. Sundry Debtors shall be receivables corresponding to energy supplied to consumers in the
immediate one (1) month period prior to the Transfer Date.
VII. Power Purchase Payables shall be payables corresponding to power procured in the
immediate one (1) month period prior to the Transfer Date.
CHD. ADMN GAZ. JAN. 30, 2026 (MAGHA. 10, 1947 SAKA) 135
This is Digitally Signed Gazette. To verify, visit :
https://egazette.chd.gov.in
CHANDIGARH ADMINISTRATION
ENGINEERING DEPARTMENT
Notification
The 30th January, 2026
No. G1/2026/43.—Whereas the Chandigarh Administration, Engineering Department vide
Notification No. G1/2025/120 dated 31.01.2025 had notified the Scheme called the "Chandigarh
Electricity Reforms Transfer Scheme, 2025" (hereinafter referred to as "said scheme") for providing
and giving effect to the transfer of distribution of electricity functions together with the assets,
liabilities, interests, rights, functions, obligations, proceedings and personnel of EWEDC to the
Chandigarh Power Distribution Limited and for the purposes of Part D of the said scheme,
01.02.2025 was notified as the effective date of such transfer.
Whereas the transfers under the said scheme were provisional for a period of
twelve (12) months from the Transfer Date in order to enable the Chandigarh Administration to
exercise the right to alter, vary, modify, add or otherwise change the terms of such transfers
including the values of Assets, proceedings and Liabilities transferred in such manner as the
Administration may consider appropriate. Further, during the period of twelve (12) months the said
scheme was amended vide Chandigarh Administration notification bearing No. G-1/2026/42 dated
30.01.2026.
Now therefore, the transfers within the said scheme as amended from time to time
has become final after the expiry of period of twelve (12) months as provided in the said scheme
with effect from 01.02.2026 and the words "Provisional Transfer" wherever referred to in the said
scheme as amended from time to time shall be read as "Final Transfer".
By order and in the name of the Administrator
Union Territory of Chandigarh
(Sd.) . . .,
Secretary Engineering
Chandigarh Administration
015—Ptg. & Sty. Deptt., U.T., Chd.
“No legal responsibility is accepted for the contents of publication of advertisements/public notices in this part of the
Chandigarh Administration Gazette. Persons notifying the advertisements/ public notices will remain solely, responsible for
the legal consequences and also for any other misrepresentation etc. ”