The Chhattisgarh State Electricity Supply Code, 2011
Order - The Electricity Act, 2003
- Kind: Order
- Under: The Electricity Act, 2003
Text of this order
1
Chhattisgarh State Electricity Regulatory Commission
Irrigation Colony, Shantinagar, Raipur - 492 001 (Chhattisgarh)
Tele: 771-5073555, Fax:771-5073553
Raipur Dated: 28/11/2011
No.39/CSERC/2011. In exercise of powers conferred by section 43 (1) read
with section 181 (t), section 44, section 46 read with section 181 (1), section 47 (1)
read with section 181 (v), section 47(4) read with section 181 (w), section 47(2), (3)
and (5), section 48 (b) and section 50 read with section 181 (x) and section 56 of the
Electricity Act 2003 (No. 36 of 2003) and the Electricity (Removal of Difficulties)
order, 2005 issued by the Ministry of Power, Government of India on 08/06/2005, the
Chhattisgarh State Electricity Regulatory Commission hereby makes the following
Code to be known as "Chhattisgarh State Electricity Supply Code-2011" to
govern distribution and supply of electricity and the procedures thereof, such as the
systems of billing, modality of payment of bills, the powers, functions and obligations
of the distribution licensees and the rights and obligations of consumers, etc. This
Code also specifies the set of practices that shall be adopted by licensee to provide
efficient, cost effective and consumer friendly services to the consumers.
Øekad 309Øekad 309Øekad 309Øekad 309] jk;iqj]jk;iqj]jk;iqj]jk;iqj] lkseokj]lkseokj]lkseokj]lkseokj] fnukad fnukad fnukad fnukad 28282828 uoEcj 2011uoEcj 2011uoEcj 2011uoEcj 2011 & & & & vxzgk;.k 7] 'kd 1933vxzgk;.k 7] 'kd 1933vxzgk;.k 7] 'kd 1933vxzgk;.k 7] 'kd 1933
"~~ $ ~ mcfi
r it"~ 'TTTfR (FiRT mcfi
R<fiG) ~ ffl ~ a:r:p:ru. ~
"IT. 2_:_22-i?'t1ll-Fiq •1'51G/38 fu. it
f~, ~ 30·-5".'2001."
(·~.)
~ * ~ cfi I IT! I a .
. ~ sfil'!fcn
·'0'dlfl•lq~/09/2010-20'12."
2
CHAPTER 1: SHORT TITLE, SCOPE COMMENCEMENT AND REVIEW
PROCESS.
1.1 This Code may be called the “Chhattisgarh State Electricity Supply Code,
2011”.
1.2 This shall come into force from the date of its publication in the Chhattisgarh
Rajpatra.
1.3 It shall extend to the whole of the State of Chhattisgarh.
1.4 It shall apply to all persons engaged in the business of distribution of
electricity as distribution licensees including the Chhattisgarh State Power
Distribution Company (CSPDCL) and its agents, under the Electricity Act,
2003 and to the consumers of electricity. It shall also apply to all persons
exempted from distribution licence under sec.13 of the Act.
1.5 Copies of this Code and Regulations for Redressal of Consumer Grievances,
as duly amended from time to time, shall be kept in the registered offices,
regional offices, circle offices, division offices, centres of the licensees and
such other offices as may be specified by the licensees or by the
Commission.
Mechanism for review of Electricity Supply Code
1.6 The Commission shall constitute an Electricity Supply Code Review
Committee (Review Committee) to review this Code along with and
Regulations for Redressal of Consumer Grievance on regular basis. The
Review Committee shall consist of such number of persons, as the
Commission may consider necessary, adequate and will be appointed by the
Commission, including persons representing the following:
(a) Each Distribution Licensee of the State;
(b) State Transmission Utility (STU) or Transmission licensee;
(c) LT consumers, HT consumers, EHT consumers, their associations and
any consumer groups; and
(d) Any other interested group including NGO as the Commission may
think fit.
1.7 The Commission shall appoint a Chairman from among the representatives of
the licensees. The Chairman of the Review Committee shall appoint an officer
as Member Secretary. The concerned licensee shall provide all the required
support, administrative or otherwise to the Committee in the discharge of its
functions. All members of the Review Committee shall be appointed for a
period of two years.
1.8 The Review Committee shall meet at least once every six (6) months.
3
1.9 The Member Secretary of the Review Committee shall send the proceedings
of the meetings of the Committee to the Commission within 15 days of the
meetings.
1.10 The Commission may amend the Electricity Supply Code suo motu or on the
recommendations of the said Committee. However, before any amendment is
made in the Code, comments on the proposed changes shall be obtained
from all the Distribution licensees, STU, Transmission licensees and the
public.
1.11 A notice regarding amendment made in the Electricity Supply Code shall be
published by the licensee in at least two newspapers having wide circulation
in the area of supply stating that copies of the amended Electricity Supply
Code are available for purchase in the offices mentioned in clause1.5.
4
CHAPTER 2: DEFINITION
2.1 In this Code, unless it is repugnant to the context
(a) ‘Act’ means The Electricity Act, 2003 (No. 36 of 2003) as amended from
time to time
(b) ‘Agreement’ with its grammatical variations and cognate expressions
means an agreement entered in to between the licensee and the
consumer under this Code;
(c) ‘Apparatus’ means electrical apparatus and includes all machines,
fittings, accessories and appliances in which conductors are used;
(d) “Applicant” means an owner or occupier of any land/premises who files
an application form with a licensee for supply of electricity, increase or
reduction in sanctioned load/contract demand, change in title,
disconnection or restoration of supply, or termination of agreement, as the
case may be, in accordance with the provisions of the Act and the Code,
rules and regulations made thereunder or other services;
(e) “Application” means an application form complete in all respects in the
appropriate format, as required by the Distribution licensee, along with
documents showing payment of necessary charges and other
compliances;
(f) “Application form” means an application form complete in all respects in
the appropriate format, as required by the Distribution licensee, before any
payment of applicable charges;
(g) ‘Area of supply’ means the geographic area within which a licensee is
authorized by his license to supply electricity;
(h) ‘Average Power Factor’ means the average monthly power factor and
shall be the ratio expressed as a percentage of the total kilowatt hours to
the total kilovolt ampere hours supplied during the billing month; the ratio
being rounded off to two decimal figures, 5 or above in the third place of
decimal being rounded off to the next higher place in the second. In case
KWh or KVAh reading is not available, then average monthly power factor
shall be calculated on the basis of KVARh reading, if the meter has
KVARh recording feature.
(i) ‘Billing Month or Month’ means a period of about 30 days between the
two consecutive meter readings for the purpose of billing in case of
monthly billing.
(j) ‘Billing cycle’ means a period of more than 30 days between two
consecutive meter readings for the purpose of billing such as bimonthly /
trimonthly billing.
(k) ‘Breakdown’ means an occurrence relating to the equipment of the
electric energy supply system including electrical line that prevents its
normal functioning;
(l) ‘Code or Supply Code’ means the Chhattisgarh State Electricity Supply
Code, as in force from time to time;
5
(m) ‘Commission’ means the Chhattisgarh State Electricity Regulatory
Commission;
(n) ‘Conductor’ means any wire, cable, bar, tube, rail or plate used for
conducting electrical energy and so arranged as to be electrically
connected to a system;
(o) 'Connected load' means aggregate of the manufacturer’s rating of all
energy consuming devices, in the consumer’s premises, which can be
simultaneously used. This shall be expressed in KW, or HP units and can
also be determined as per the procedure laid down in clause 5.52 on
‘Rating of Installations’ in this Code;
(p) ‘Connection point’ means a point at which the consumer’s installation
and/or apparatus are connected to distribution licensee’s distribution
system;
(q) ‘Consumer’ means as defined in section 2(15) of the Act and for the
purpose of this Code shall also include a person who has applied for an
electricity connection or a person who had a connection but whose
electricity supply has been disconnected for the time being for whatever
reason.
(r) ‘Consumer’s installation’ means any composite electrical unit including
electric wires, fittings, motors and apparatus, portable and stationary,
erected and wired by or on behalf of the consumer at the consumer’s
premises;
(s) ‘Contract Load or Contract demand’ means the maximum load in KW,
KVA or HP, as the case may be, agreed to be supplied by the licensee
and contracted by the consumer and mentioned in the agreement
executed between consumer and licensee;
(t) ‘Cut-out’ means any appliance for automatically interrupting the supply of
energy through any conductor when the current rises above a
predetermined quantum, and shall also include fusible cut-out;
(u) ‘Date of release of connection’ is the date when licensee energize the
installation of consumer by connecting the distribution main through the
meter.
(v) ‘Date of commencement of Agreement’ means the day immediately
following the date of expiry of a period of one month for in case of LT
connections and three months in case of HT and EHT connections from
the date of intimation to an intending consumer of the availability of power
to its premises or the actual date of release of connection to such
consumer, whichever is earlier;
(w) ‘Demand charge’ for a billing month means a charge levied on the
consumer based on the billing demand and shall be calculated as per the
procedure provided in the tariff order, passed by the Commission, under
part VII of the Act;
(x) ‘Distribution mains’ means the portion of any main with which a service
line is, or is intended to be, immediately connected;
6
(y) ‘Distribution system’ means the system of wires and associated facilities
of distribution licensee connected to or to be connected to the installation
of the consumer. It shall also include electric line, substation and electrical
plant that are primarily maintained for the purpose of distributing electricity
in the area of supply of such distribution licensee notwithstanding that
such line, sub-station or electrical plant are high pressure cables or
overhead lines or associated with such high pressure cables or overhead
lines; or used incidentally for the purposes of transmitting electricity for
others;
(z) ‘Earthed’ or ‘connected with earth’ means connected with the general
mass of earth in such a manner as to ensure at all times an immediate
discharge of energy without danger;
(aa) ‘Electrical Inspector’ An inspector as defined in section 54 of the Act.
(bb) ‘Electric line’ means any line which is used for carrying electricity for any
purpose and includes:
(i) any support for any such line, that is to say, any structure, tower, pole
or other thing in, on, by or from which any such line is, or may be,
supported, carried or suspended; and
(ii) any apparatus connected to any such line for the purpose of carrying
electricity;
(cc) ‘Energy’ means electrical energy:
(i) generated, transmitted or supplied for any purpose, or
(ii) used for any purpose except the transmission of a message;
(dd) ‘Energy charge’ refers to a charge levied on the consumer based on the
quantity of electricity (units in KWh or KVAh as per tariff) supplied;
(ee) ‘Extra High Voltage’ or ‘Extra High Tension’ means the voltage, which
exceeds 33,000 volts subject, however, to the percentage variation as
shown in clause 3.3 of this Code;
(ff) ‘Feeder’ means a LT, HT or EHT distributor, emanating from a sub
station, to which a distribution sub station or LT, HT or EHT consumers are
connected;
(gg) ‘Fixed charges’ shall be as per the provisions of the prevailing Tariff
Order issued for the licensee by the Commission;
(hh) “Harmonics” means a component of a periodic wave having frequency
that is an integral multiple of the fundamental power line frequency of
50Hz causing distortion to pure sinusoidal waveform of voltage or current,
and as governed by IEEE STD 519-1992, namely “IEEE Recommended
Practices and Requirements for Harmonic Control in Electrical Power
Systems” and corresponding standard as may be specified in accordance
with clause (c) of subsection (2) of section 185 of the Act;
(ii) ‘High Voltage (HV) or High Tension (HT)’ means the voltage higher than
650 volts but which does not exceed 33,000 volts under normal conditions
subject to the percentage variation in clause 3.3 of this Code;
7
(jj) ‘Independent Feeder’ means a feeder constructed at the cost of
consumer or a group of consumers and supplying electricity to only that
consumer or group of consumers.
(kk) ‘Initial period of agreement’ means the period of two years starting from
the date of commencement of agreement. The initial period of agreement
shall continue till the end of the month, on which the last date of the two
year period expires;
(ll) ‘Installation’ means any composite electrical unit used for the purpose of
generating, transforming, transmitting, converting, distributing or utilizing
energy;
(mm) ‘Licensed Electrical Contractor’ means a contractor licensed as per
clause 29 of CEA Safety Regulation 2010;
(nn) 'Licensee' means a distribution licensee, granted licence for distribution
of electricity under section 14 of the Act unless the context otherwise
requires.
(oo) “Load Factor” means the ratio of the total number of units consumed
during a given period to the total number of units which may have been
consumed had the contract demand/sanctioned load been maintained
throughout the same period, and shall usually be expressed as a
percentage;
Load Factor in percentage= Actual units consumed in a given periodX100
(Contracted load in KW X No of hours in the period)
(pp) ‘Low Voltage (LV) or Low Tension (LT)’ means the voltage, which does
not exceed 230 volts under normal conditions subject, however, to the
percentage variation as per clause 3.3 of this Code;
(qq) ‘Maximum demand’ for a category of consumer shall be determine as
specified in the tariff order passed by the Commission;
(rr) ‘Medium voltage’ means the voltage higher than 230 volts but which does
not exceed 650 volts under normal conditions subject, however, to the
percentage variation as per clause 3.3 of this Code;
(ss) ‘Meter’ means a set of necessary integrating instruments and equipments
wherever required, used to measure and/or record and/or store the
electrical quantities like energy in KWh or KVAh, maximum demand in KW
or KVA, reactive energy in KVARh etc. in a given time, which include
whole current meter and metering equipment such as Current
Transformers (CT), Capacitor Voltage Transformer (CVT), Potential
Transformers (PT) with cable, wiring, where used in conjunction with such
meter or its accessories and any devices like test terminal block switches
or MCB/ load limiter or fuses used for protection and testing purposes and
any enclosure used for housing or fixing such meter or its accessories;
and shall also include any seal or sealing arrangement provided by
licensee.
(tt) ‘Point of supply’ means the point at the incoming terminals of switchgear
installed by the consumer;
(uu) ‘Power factor’ is the cosine of the electrical angle between the voltage
and current vectors in an AC electrical circuit;
8
(vv) ‘Premises’ means land, building or infrastructure or part or combination
thereof in respect of which a separate meter or metering arrangements
have been made by the licensee for supply of electricity;
(ww) ‘Rural areas’ means the areas covered by Gram Panchayats;
(xx) ‘Sanctioned load” means the load in kW, kVA or BHP, which the licensee
has agreed to supply from time to time subject to the governing terms and
conditions in the absence of an Agreement between the Distribution
licensee and the consumer;
(yy) ‘Tariff order’ in respect of a licensee means the most recent order issued
by the Commission for that licensee indicating the rates to be charged by
the licensee from various categories of consumers for supply of electricity;
(zz) ‘Theft” shall mean theft of electricity as defined in Section 135 of the Act;
(aaa) ‘Transmission licensee’ means a person who has been granted a
license under Section 14 of the Act authorizing him to establish or operate
transmission lines;
(bbb) ‘Transmission system’ means the system consisting of extra high
voltage electric lines being operated at EHV (excluding generator
interconnection facilities) owned and/or operated by the Transmission
licensee for the purposes of the transmission of electricity from one power
station to a sub-station or to another power station or between sub-
stations or to or from any external interconnection equipment up-to the
interconnection with the distribution system and includes the plant and
apparatus and meters owned or used by the transmission licensee in
connection with the transmission of electricity, but shall not include any
part of any licensee’s distribution system;
(ccc) ‘Urban areas’ means the areas covered by all Municipal Corporations
and other Municipalities Nagar Panchayat including the areas falling under
the various Urban Development Authorities, Cantonment Authorities and
industrial estates or townships;
2.2 All other expressions used herein but not specifically defined, but defined in
the Act, shall have the meaning assigned to them in the Act. The other
expressions used herein but not specifically defined in this Code or in the Act
but defined under any law passed by the Parliament applicable to electricity
industry in the state or stated in the tariff order passed by the Commission,
under section 62 of the Act shall have the meaning assigned to them in such
law. Subject to the above, the expressions used herein but not specifically
defined in this Code or in the Act or any law passed by the Parliament shall
have the meaning as is generally assigned to them in the electricity supply
industry.
9
CHAPTER 3: SYSTEM OF SUPPLY AND CLASSIFICATION OF CONSUMERS
System of Supply
3.1 The declared frequency of the alternating current (AC) shall be 50 cycles per
second.
3.2 The declared voltage of the AC supply is as follows:
(a) Low voltage (LV) or Low tension (LT)
(i) Single Phase: 230 volts between phase and neutral;
(ii) Three Phase: 400 volts between phases;
(b) High Tension (HT) - Three Phase: 11 KV or 33 KV between phases;
and
(c) Extra High Tension (EHT) - Three Phase: 132 KV or 220 KV between
phases.
For Railway traction two-phase supply may be given.
3.3 The licensee shall design and operate a distribution system in conjunction
with the transmission system. The licensee shall not permit the voltage at the
point of supply to the consumer to vary from the declared voltage which is:
(a) In the case of low voltage, by more than 6%;
(b) In the case of high voltage, by more than 6% on the higher side or by
more than 9% on the lower side;
(c) In the case of extra high voltage, by more than 10% on the higher side
or by more than 12.5% on the lower side.
Any exception to the above will only be allowed with the written consent of the
consumer and with prior approval of the Commission.
Voltage of Supply to Consumers
3.4 The supply voltage-wise minimum and maximum contract demands shall
normally be as follows.
Supply Voltage Minimum Contract Demand Maximum Contract Demand
230 volts - 3 KW
440 volts Above 3 KW 100 HP or 75 KW
11 KV 60 KVA 500 KVA
33 KV 60 KVA 10000 KVA
132 KV 4000 KVA 40000 KVA
220 KV 15000 KVA 150000 KVA
10
Provided that due to technical reasons, the licensee may relax above
provision after due approval from Commission. The HT and EHT consumers
having contract demand exceeding the maximum limit as prescribed above,
shall be levied additional charges as specified by the Commission in relevant
tariff order.
3.5 The minimum contract demand specified at clause 3.4 of this Code shall not
be applicable to generators availing start-up power and to such captive and
non-captive consumers of captive generating plant (CGP) who can reduce
their contract demand to any extent even to zero as specified in clause 12.14
and 12.15 of this Code.
3.6 In case of Railways traction, the maximum and minimum limits of contract
demand shown in clause 3.4 of this Code may be relaxed by the licensee on
mutual agreement depending on the actual requirement and feasibility.
Harmonics
3.7 The maximum permissible limit of harmonics as specified in Institute of
Electrical and Electronics Engineers (IEEE) standard 519 (1992) adopted in
clause (5) of part-II of Central Electricity Authority (Technical standard of
connectivity to the grid) Regulations 2007 (hereafter CEA (Technical Standard
Regulations) is as follows:
(a) Voltage distortion limit – Utilities responsibility
Bus Voltage Maximum individual
voltage distortion
Total maximum voltage
distortion
33KV & 132 KV 3.0 5.0
220KV 2.0 2.5
400KV 1.5 2.0
(b) Current distortion – users responsibility
The total harmonics distortion for current drawn from the transmission
system at the connection point shall not exceed 8%.
3.8 The voltage unbalance i.e. difference of voltage between any two phases on
33 KV and above shall not exceed 3% at supply point.
Load Balancing
3.9 All the consumers availing three phase supply shall balance their load in such
a way that difference in loading between each phase does not exceed 5% of
average loading between phases.
11
Classification of Consumers
3.10 The classification of consumers, tariff and conditions of supply applicable to
each category of consumers shall be as fixed by the Commission from time to
time in the tariff order passed under section 62 of the Act or otherwise. The
licensee may classify or reclassify consumers into various categories from
time to time as per classifications done by the Commission in tariff order.
3.11 Interpretation of Commission on classification of consumer and applicability of
tariff will be final and binding on licensee and consumer both.
12
CHAPTER 4: PROCEDURE FOR RELEASE OF NEW CONNECTION AND
CHANGE IN EXISTING CONNECTION.
Licensee’s Obligation to Supply
4.1 The licensee shall, on an application by the owner or lawful occupier of any
premises located in his area of license give supply of electricity to such
premises within the time limit specified as shown in clause 4.58 of this Code,
provided
(a) the supply of electricity is technically feasible,
(b) the applicant has observed the procedure specified in this Code, and
(c) the applicant bears the cost of extension for supply as specified in this
Code.
Application referred to above means the application complete in all respects in
the appropriate form, as required by the distribution licensee, along with
documents showing payment of necessary charges and other compliances
such as execution of agreement and submission of test report / approval from
Electrical Inspector etc. as the case may be.
Licensee’s obligation to extend the distribution system and consumer’s share
in cost
4.2 The licensee shall bear the cost for strengthening / upgradation of the system
for quality supply to the existing consumers which shall be recovered from the
consumers through tariff.
4.3 The cost of extension of distribution mains and extension / upgradation of the
system required up to the point of supply for meeting demand of new
consumers and load enhancement of existing consumers, shall be borne by
the consumer/applicant unless otherwise specifically mentioned in this Code
or in Misc. and General Charges as approved by the Commission as per
provision in section 46 of the Act.
4.4 In case, release of a new LT industrial connection or enhancement of load of
an existing LT industrial connection requires augmentation of capacity of
existing transformer or installation of a separate transformer, the consumer
shall be liable to bear the cost of transformer proportionate to the load
requisitioned by him only. The land/room with easy access required for
housing the transformer sub-station and switch gears shall be provided by the
consumer free of cost for which no rent or premium shall be payable by the
licensee, in case it is not possible to set up the substation in the public land.
4.5 The extension of distribution mains, notwithstanding the fact that it has been
paid for by the consumer, shall be the property of the licensee. The licensee
shall maintain it at his cost and shall also have the right to use the same
extension of distribution mains for supply of electricity to any other person,
provided that such use does not adversely affect supply to the consumer
already connected to distribution network.
13
4.6 When the licensee is ready to give supply, he shall serve a notice to the
consumer intimating that supply has been made available up to his premises
and the consumer may avail connection within one month, in case of LT
consumers, and three months, in case of HT or EHT consumers. The notice
shall be sent through registered post or by hand duly acknowledged. If the
consumer fails to avail connection within the notice period, he shall be liable
to pay charges due thereon as per the provisions of this code at the rate
specified in prevailing tariff order from the day following the end of the notice
period.
Conditions for grant of connection and consumer’s obligations:
4.7 An applicant for electricity supply shall have to lay the service line of
specifications approved by the licensee. The length of such service line from
the distribution mains to the point of supply where meter is to be installed
should not normally be more than 30 meters. The service line may be
overhead or underground with cable, and no joint in the service line shall be
allowed. Apart from laying of service line, the consumer shall be required to
pay security deposit, service connection charges and agreement charges.
The consumer shall carryout augmentation in size of service connection cable
wherever required due to enhancement of load.
4.8 Whether release of LT connection involves extension of line or not, the laying
of work of service line shall be got done by the consumer through authorized
licensed electrical contractor and submit the test report to licensee before
release of connection.
4.9 However, in cases, where extension of distribution mains is required, the
consumer may get the line extension work done through an authorized
licensed electrical contractor as per layout, drawing and design approved by
licensee. In such cases, the consumer shall be required to pay supervision
charges as approved by Commission on the cost of materials plus labour
charges. This asset on completion of line extension work be handed over to
the licensee and after release of connection, line will be owned and
maintained by licensee.
4.10 In cases where consumer intends to get the line work executed by licensed
electrical contractor, the consumer himself may procure the materials of
approved make and from approved vendors list of licensee else the
responsibility of replacement in case of failure of equipment within the
guarantee period shall rest on consumer. The material should, conform to
relevant BIS specification or its equivalent and should bear ISI mark wherever
applicable. The licensee may ask for documentary evidence to verify the
quality of materials used. The transformer sub-station installed should be in
accordance with provision in clause 5.10 to 5.17 of this Code.
4.11 Where the line extension work is done by the consumer, the consumer shall
get the work done within the timeframe as provided in clause 4.58 of this
Code, failing which the licensee may, on giving fifteen days’ notice, treat the
application for supply as cancelled.
14
PROCEDURE FOR PROVIDING NEW SERVICE CONNECTION:
Application form for Supply
4.12 Application form for supply of electricity as the case may be shall be made in
the form as prescribed in Annexure 1 / Annexure 2, copies of which shall be
made available by the licensee free of cost at its local offices.
Acknowledgement shall be issued forthwith on receipt of an application form.
Photocopies of blank form or form downloaded from the website of the
licensee may also be used by the consumer and shall be accepted by the
licensee.
4.13 The occupier of the premises, for whom supply is required, shall mention in
application form his full name and postal address with telephone/mobile
number (if available) the location where the supply is required. Any assistance
or information required in filling up the form should be given to the consumer
at the office where application form is to be submitted. The occupier of the
premises has to ensure that the work of wiring/installation of
machines/equipments is got done through a licensed electrical contractor duly
authorized to execute such work.
4.14 The licensee shall also provide new avenues for applying for new connection
or modification in existing connection through website, call centres, etc. which
will minimize the applicant’s interface with the utility during the process.
4.15 Application forms for new connection must be accompanied with self attested
photocopies of identity proof of the applicant, proof of applicant’s ownership
or occupancy over the premises for which new connection is being sought,
proof of applicant’s current address, and in specific cases, certain other
documents as detailed in clause 4.17 of this Code.
4.16 Registration-cum-processing fees as decided by the Commission shall be
levied while applying for new connection. These charges shall be adjusted by
the licensee while issuing future bill. However, in case the consumer does not
complete the formalities and his application is cancelled, the processing fee
will not be refunded to the consumer.
Proof of Identity:
Any of the following documents shall be considered as acceptable proof of
identity:
(A) If the applicant is an individual:
(i) Electoral identity card;
(ii) Passport;
(iii) Driving license;
(iv) Ration card;
(v) Photo identity card issued by Government agency;
(vi) PAN card;
(vii) Photo Certificate from Sarpanch or any village level Government
functionary like Patwari /postmaster/ in-charge of primary health
centre etc.
(viii) Unique ID (Adhar Card)
(B) If the applicant is a company, trust, educational institution, government
department etc, the application form shall be signed by a competent
15
authority along with a relevant resolution/ authority letter of the
institution concerned.
Proof of legal ownership / occupier:
Any of the following documents shall be considered as acceptable proof of
legal ownership or occupancy of premises:
(1) Copy of sale deed or lease deed/partnership deed/succession or heirship
certificate/ deed of last will.
(2) Registered General Power of Attorney;
(3) Latest Municipal tax receipt;
(4) Letter of allotment of land / house from Government authority.
(5) Certificate of Sarpanch about ownership of house in case of village.
(6) Patta issued by Government authorities.
(7) An applicant who is not an owner but an occupier of the premises shall,
along with any one of the documents listed at (1) to (6) above shall also
furnish a No Objection Certificate from legal owner of the premises.
(8) In case of supply for agriculture/ irrigation pump set, the copy of the
current Khasra map with copy of B1 giving the ‘khasra’ number of the
field where supply is required along with location of well dug. In case of
lifting of water from tank, river nala, the NOC from authorized Revenue
authority and In case of joint land owner power of attorney in the name of
applicant also to be submitted.
Proof of current address:
Any of the following documents shall be considered as acceptable proof of
current address for communication:
(1) Electoral identity card;
(2) Passport;
(3) Driving license;
(4) Ration card;
(5) Photo identity card issued by any Government agency;
(6) Statement of running Bank Account;
(7) Most recent Water / Telephone / Electricity / Gas connection Bill;
(8) Income Tax assessment order
4.17 The consumer shall also furnish, along with the application form, copies of the
following documents wherever applicable.
(a) Approval / permission of the local / statutory authority, if required under
any law /rules. This may be required for industrial connections, large
non-domestic connections and multi-consumer complexes.
16
(b) In case of a partnership firm, partnership deed, authorization in the
name of the applicant for signing the application form and agreement.
(c) In case of a Public or Private Limited Company, the Memorandum and
Articles of Association and Certificate of incorporation together with an
authorization in the name of the applicant for signing the application
form and agreement.
(d) Environmental clearance wherever required from the concerned
Department/competent authority if available at the time of submission
of application form, or else shall have to be submitted before release of
connection.
(e) SSI registration in case of small industries and registration from
Industries Department in case of other industries..
(f) In case of applications for supply of electricity to stone crushers, stone
polishing and hot-mix plants, the following additional information shall
also be furnished.:
(i) Documentary proof from the Department concerned to show that
the supply of electricity is required for at least two years; and
(ii) Permanent address of applicant.
(h) In case of industries, extract of project report relevant to power and
process requirements.
(i) The consumer shall also intimate whether the extensions work, if any,
will be done by him or the licensee.
(j) Proof of having deposited the necessary processing fee, as fixed by
the Commission.
Note: The licensee may ask for the original documents, from the consumer,
for verification.
4.18 In case the applicant for a new connection for domestic category is unable to
provide the proof of legal occupation of the premises, the officer in charge of
local office may waive such requirement and record, in writing, the reasons
thereof. But in such cases, the applicant shall execute an indemnity bond,
indemnifying the licensee against any damages payable on account of any
dispute arising out of supply of power to the premises and to authorize the
licensee to disconnect the supply in case of any dispute subsequently by
actual land owner. However, the consumer has to provide NOC from the
owner of the land in cases where extension of line is required on such land.
The security deposit to be paid by the consumers in such cases shall be equal
to the amount of ninety day’s of average consumption to be determined by the
licensee’s local office. The serving of connection to such premises shall not
be used as a proof of legal rights on the premises or for any other legal
purposes.
4.19 If the consumer, in respect of an earlier agreement executed in his name or in
the name of a firm or company with which he was associated either as a
partner, director or managing director, has any arrears of electricity dues on
the premises for which the new connection is applied and such dues are
payable to the licensee, the requisition for supply may not be entertained by
17
the licensee until the dues are paid in full. In case of a person occupying a
new property, it will be the obligation of that person to check the electricity
bills for the previous months or, in case of disconnected supply, the amount
due as per the licensee’s records immediately before his occupation and
ensure that all outstanding electricity dues as specified in the bills are duly
paid up and discharged. The licensee shall be obliged to issue a certificate of
the amount outstanding against the connection that was installed or is
installed in such premises on request made by such person within 30 days
from the date of receipt of such request and release the connection after
clearance of outstanding dues.
4.20 (i) Electricity will be supplied to a consumer at a single point for the entire
premises. For the purpose of terms and conditions of supply, premises
shall be deemed to be separate-
(a) if owned by different persons or taken on lease by different
persons, the terms of lease being valid for a period of at least two
years at the time of connection;
(b) if domestic households have relevant document from local
authorities identifying the premises as separate;
(c) if the part of domestic premises is used for non-domestic
purposes; and
(d) in case of industries, if the industrial establishment are
manufacturing different products, not as part of single
manufacturing process, and their physical locations are different
and distinct.
ii) Each separate premise will be given separate point of supply.
Provided that HT consumer may avail separate LT connection in same
premises to meet out its essential load as per provision in clause 4.40 of the
Code.
4.21 An application form shall be deemed to be received on the date of receipt of
consumer’s requisition of supply in the prescribed format of the application
form, complete in all respects and attached with all relevant documents.
An application shall be deemed to be received on the date of receipt of all
applicable charges including the security deposit in accordance with clause
6.4 and 6.5 of this Code, after receipt of the application form, execution of
agreement and other obligation by consumer such as submission of test
report / NOC from Electrical Inspector and other relevant documents as per
provision in clause 4.17 of this Code.
18
Processing of application form
4.22 The licensee shall verify the application form and the enclosed documents at
the time of its receipt. On receipt of application form complete in all respects,
the licensee shall issue a written acknowledgement to the consumer
immediately indicating its registration number. If the application is incomplete,
or otherwise the entries are defective, the shortcomings shall be intimated to
the applicant in writing within 5 working days. After receipt of application form
complete in all respect along with other relevant documents, the licensee shall
intimate the consumer, proposed date of inspection, within the time period
specified which should be within the next 2 working days in urban areas and 5
working days in rural areas.
4.23 The licensee shall maintain a permanent record of all application forms
received in an Application Register/Database. Each application form shall be
allotted a permanent application number (for identification) serially in the order
in which it was received. Separate registers/databases for different category
of applications i.e. where extension work is involved and where no extension
is required may be maintained. The licensee shall keep the
registers/databases updated with stage-wise status of disposal of each
application form.
4.24 During the inspection of premises, the licensee shall fix the point of supply
and the place where the meter shall be installed, in consultation with the
consumer:
Provided that the service line shall be laid at an accessible location and the
meter shall be fixed at the entry point of the premises in such a manner that it
is protected from elements like rain etc. and is easily accessible for reading
purpose without getting the premises unlocked or opened in accordance with
clause 8.9 and 11.64 of this Code;
4.25 Licensee shall record the correct full postal address of the premises, if not
properly provided in the application form, and note down landmarks near the
premises and the pole number from where service connection is proposed to
be given;
4.26 When the consumer’s premises has no frontage on a street and the service
line from the licensee's mains has to go upon, over or under the adjoining
premises of any other person (whether or not the adjoining premises be
owned jointly by the consumer and such other person), or in any other case,
the consumer shall bring at his own expense necessary way-leave, license or
sanction for extension of distribution mains and service line and furnish it to
the licensee. The licensee shall not arrange supply of electricity until the way-
leave, or sanction is received. It shall not be incumbent on the licensee to
ascertain the validity or adequacy of way-leave, it shall be the responsibility of
the consumer to ensure this. Any extra expense incurred in placing the supply
line in accordance with the terms of the way-leave, or sanction shall be borne
by the consumer.
19
4.27 In the event of the way-leave, or sanction being cancelled or withdrawn, the
consumer shall, at his own cost arrange for, or in case the work is carried out
by the licensee at the consumer’s request, pay full cost of any diversion of the
service line or the provision of any new service line thus rendered necessary.
In case of non-payment or delay in payment, supply of consumer is liable to
be disconnected.
4.28 In case it is possible to extend supply from the existing mains, the licensee
will forward to the consumer, within 5 working days in urban areas and 7
working days in rural areas, an advice for the service connection the amount
of security deposit and any other charges as applicable. The amount shall be
payable in full within 15 days, after which the work for laying the service line
may be taken up. In the advice (demand note) it shall be mentioned that after
payment the consumer shall execute necessary agreement, and shall submit
test report after laying of service line for availing the connection.
4.29 In case it is necessary to extend distribution line for giving supply to the
consumer, the licensee will forward to the consumer, within 10 working days
in urban areas and within 15 working days in rural areas, an advice (demand
note) containing the charges for extension of the distribution line, the amount
of security deposit and any other charges as applicable and will also intimate
additional formalities, if any, to be carried out by the consumer including
execution of agreement and submission of test report after laying of service
line for availing connection. The amount shall be payable in full within 15 days
along with completion of other formalities, after which the work for laying the
distribution lines can be taken up.
4.30 In case the consumer fails to complete the formalities within the time
stipulated in demand note, the licensee shall give him notice to complete the
formalities within the next 15 days failing which, his application for supply shall
be cancelled under intimation to consumer. Thereafter the consumer shall
have to apply afresh along with processing fees.
4.31 On payment of necessary charges including security deposit and execution of
agreement the licensee shall take up the work of extension of distribution line.
The extension work shall be completed within maximum period of 60 days for
the LT consumer (excluding pump), 90 days for HT consumers and 180 days
for EHT consumers. For agriculture pump permissible period for extension is
90 days when access to field is available and 180 days when access to field is
not available. The responsibility of way leave clearance shall rest with
consumer. The licensee after completion of extension of mains up to
consumer’s premises, and after being ready to release the connection, shall
issue a notice as per clause 4.6 of this Code.
4.32 In case the line extension work is executed by the licensee after payment of
estimated cost of work. The licensee within 90 days after completion of work
shall come out with actual expenditure incurred in the extension work and
refund the excess amount collected if any within above stipulated time. In
case of delay in refund the licensee have to pay interest @1% per month or
part thereof on amount refundable. For this purpose, date of issue of notice as
per clause 4.6 of this Code shall be considered as date of completion of work.
20
In case the amount of actual expenditure incurred is found more than
estimated and collected, the same is recoverable from consumer. If the
consumer does not pay, the same can be added in regular monthly bill after
giving due notice to consumer and action be taken for recovery.
4.33 In case the consumer prefers to execute the line extension work by himself
after paying the supervision charge to the licensee, the consumer shall give
advance intimation in writing to the licensee about commencement of
extension work for taking up necessary supervision of the work by licensee.
The consumer shall have to obtain necessary statutory clearance in advance
before commencement of the work. The consumer shall also complete the
extension work within the time schedule prescribed in clause 4.58 of this
Code, and shall intimate the date of completion of extension work in writing to
licensee.
Release of LT connection:
4.34 On receipt of test report and document related to other necessary statutory
clearances and intimation that the installation work in consumer’s premises
and service line work have been completed, the licensee shall inform the
consumer, within 3 working days, the date of inspection/testing of the
consumer’s installation, if inspection is required to be carried out. In such
case, the licensee shall inspect and test the consumer’s installation as
required of him under regulation 31 of the Central Electricity Authority
(Measures relating to Safety and Electric Supply) Regulations, 2010
(hereafter CEA Safety Regulation) in the presence of the applicant or his
authorized representative and his Licensed Electrical Contractor. If on
inspection, the licensee finds any defect (e.g. consumer’s installation not
completed, bare ends of conductor/joints not properly covered with insulating
tape, wiring of such nature that it is dangerous to life/property, etc.), he shall
intimate the same to the applicant preferably on the spot under proper receipt.
4.35 The applicant shall get all defects / rectified within 10 working days from
receipt of intimation of defects as specified in clause 4.34 of this Code and
inform the licensee in writing under acknowledgement. In case the applicant
fails to rectify such defects or fails to inform the licensee about rectification of
defects within above time limit, the application form shall stand lapsed and the
applicant will have to apply afresh. The licensee may grant additional time to
the applicant for completion of works, in case the applicant submits a written
request for the same, within 10 working days from receipt of intimation of
defects.
4.36 On receipt of information from the applicant about removal of defects, the
licensee shall on the spot stipulate a date for re-inspection of applicant’s
premises in mutual consultation with the applicant, under-written
acknowledgment. The date of re-inspection must be scheduled within 3
working days in urban areas and 5 working days in rural areas from the date
of receipt of such information after payment of necessary fee.
21
4.37 If on re-inspection the defects pointed out earlier are found to persist, the
licensee shall again record the same and hand over a copy of the same to the
applicant or his authorized representative available on site. The application
form shall then stand lapsed and the applicant shall be informed accordingly
in writing under acknowledgement:
Provided that if the applicant feels aggrieved by the licensee’s action or
omission, the applicant may file his representation to the concerned Electrical
Inspector.
4.38 If satisfied with the test results, the licensee shall arrange to install and seal
the meter in presence of the consumer and release the connection within the
stipulated time specified in this Code. A cubical for housing the meter shall be
provided by the licensee.
4.39 The recommended size and ratings of cable for service connection,
transformers and power load are shown in Annexure 10. For single phase
connection twin core cable and for 3 phase connection four core cable shall
be used for service connection.
4.40 On request of HT industrial consumer, licensee may provide a separate
independent LT connection in same premise of HT industrial connection, to
meet out its essential load during emergency on non-availability of supply in
HT connection, subject to following conditions:
(i) Maximum permissible connected load - 20 KW
(ii) Billing shall be done at non-domestic tariff.
(iii) Consumer will be required to pay necessary charges including cost of
extension, service connection charges and security deposit as per
prevailing rates.
(iv) The LT connection should be separate and isolated from installation
from which power is used in HT connection, and in no way inter-
connected with HT installation.
(v) The consumer shall be required to make foolproof arrangement to the
satisfaction of licensee to ensure that there should not be any
possibility of feed back from one supply to other. In such case LT
connection can be disconnected.
(vi) Separate LT agreement to be executed and sub clause (iv) and (v)
above will be incorporated in LT agreement.
(vii) LT connection will be provided when there is no outstanding dues
against HT connection.
22
Release of HT/EHT connection:
4.41 On receipt of an application form for supply of electricity at HT/EHT the
licensee shall inform the consumer in writing the date of inspection of the site
to examine the feasibility of the supply applied for within 5 working days. The
consumer or his authorized representative shall remain present at the time of
inspection. In case supply at EHT / connectivity at EHV sub-station is
required, the applicant may submit a copy of application to transmission
company simultaneously for connectivity. The distribution licensee and the
Transmission Licensee shall carry out joint inspection, check the feasibility of
supply, fix the take off point, point of entry of the supplier’s line, the position of
meter, metering equipment and other equipments of the supplier. The
transmission licensee shall intimate the feasibility of connectivity or otherwise
within 30 working days of receipt of the application forms and issue demand
note for estimate of charges after sanctioning the estimate within 60 days
after issue of feasibility report. After payment of necessary charges related to
extension of EHT system Distribution Company shall carry out load sanction,
and issue demand note for payment of security deposit and execution of
agreement by consumer.
4.42 In case of HT connection where connectivity is from distribution system,
feasibility certificate shall be issued within 15 days of receipt of application
form. Further within 30 days of issue of feasibility certificate licensee shall
communicate sanction of estimate and demand note indicating the amount of
security deposit and other charges relating to execution of agreement. Meter
shall be fixed at entry point of premises in such a manner that it is protected
from rain etc. and is easily accessible without getting premises unlocked or
open for reading purpose. The last span of an HT connection shall be
preferably through the Aerial Bunched Cable, and all connections of CT/PT
and meter shall be through armoured cable for both HT and EHT connections.
4.43 Supply to HT industrial consumers shall normally be given through HT feeder
exclusively meant for industries. Supply through a separate feeder from the
nearest 33/11 KV or EHT substation should be preferred in case of
continuous process industries or load of 3 MVA or more. In no case should a
line connecting two EHT sub-stations (i.e. trunk line) be tapped for giving
supply to any consumer.
4.44 Supply to HT consumer (both at 11 KV or 33 KV) shall normally not be
extended from a rural feeder. If supply is given from a rural feeder, the
consumer shall be informed that the supply shall be restricted and regulated
in accordance with the restrictions imposed on the rural feeders as per grid
conditions. Such consumer may be required to furnish a declaration to the
licensee that no claim for indemnification shall be made by the consumer for
the restrictions in supply.
23
4.45 At the point of supply, the HT & EHT consumers shall provide suitable
protective devices as per the provisions of regulation 35 of the Central
Electricity Authority (Measures relating to Safety and Electric Supply)
Regulations, 2010. The co-ordination of protection system of consumer with
licensee’s system shall have to be approved by the licensee before
commencement of supply. Meters, and associated equipment shall be
installed by the licensee at the point of supply.
4.46 HT (33KV and 11KV) consumers shall install step-down transformers with a
vector group with delta winding on the high voltage side and star winding on
the low voltage side, with the neutral terminal brought out and solidly earthed.
The transformer may preferably be energy efficient.
4.47 The consumer after completion of installation work in his premises shall
furnish to the licensee permission from electrical inspector to energize the
installation and environment clearance wherever applicable. In case of mines
permission from Inspector of Mines shall have to be furnished.
Damage to licensee’s equipment in consumer’s premises:
4.48 The meter and its accessories etc. must on no account be handled or
removed by anyone who is not an authorized employee/representative of the
licensee. Seals which are fixed on the meters/metering equipments and meter
box must on no account be tampered with, damaged or broken. It is the
consumer’s responsibility to keep in safe custody the licensee’s equipments
and seals on the meters/metering equipments within the consumer’s
premises.
4.49 In the event of any damage caused to the licensee’s equipments within the
consumer’s premises by reason of any act, neglect or default of the consumer
or his employees, the cost thereof as claimed by the licensee shall be payable
by the consumer. If the consumer fails to do so within 30 days after demand, it
shall be treated as a contravention of the terms and conditions of this code
and the electricity supply is liable to be disconnected, after due notice. The
consumer shall however be liable to pay the charges as per the provision in
relevant tariff order and shall have to clear the outstanding dues before
reconnection as per provision in clause 10.19 of the Code.
Dedicated Feeder
4.50 Consumers desirous of getting power supply from dedicated feeder may
request for such facility to the licensee. The dedicated feeder may be
extended from the substation to the consumer’s point of supply. In such cases
the consumer shall be liable to pay the cost of bay and all protection
switchgears and its accessories provided at the substation for this feeder in
addition to the cost of laying of the feeder. On receipt of such request, the
licensee will check the feasibility based on merit of providing a dedicated
feeder to the consumer’s premises. Such dedicated feeder shall be the
property of the licensee and shall be maintained by the licensee. Such feeder
shall not be used to extend supply to any other consumer within the initial
period of two years from the date of its commissioning without written consent
of the consumer who has paid the cost of line and bay.
24
4.51 Basis for assessment of light and fan load for LT connections:
For assessment of load of a building / group of buildings or multi-consumer
complex, the following norms shall be adopted:
Load
(i) Residential Use
For every 400 sq. ft. built up area or part thereof 1 KW
Provided that the assessment of load for houses for
economically weaker section (EWS) being constructed
under any scheme of the Govt., shall be as follows:-
Up to 400 sq. ft. built up area in the area of a-
a. Municipal Corporation (Nagar Nigam) 1 KW
b. Municipal Committee (Nagar Palika) 0.75 KW
c. Nagar panchayat / Grampanchayat 0.50 KW
(ii) Non-Residential Use
(a) For every 200 sq. ft. built up area or part thereof 1 KW
(b) 1000 sq.ft. built up area or part thereof for shed /
godown / school 1 KW
For assessment of load of a housing colony and non- residential plots
in the housing colony the following norms shall be adopted:
(i) For residential colonies
For every 500 sq. ft. plot area or part thereof 1 KW
(ii) For non-residential plots
For every 200 sq. ft. plot area or part thereof 1 KW
Note:
(i) The aforesaid norm for assessment of load shall not be applicable
where consumer applies for demand bases tariff connection.
(ii) Load assessment shall be done as per the plan approved by the
competent authority.
(iii) The load of the common facilities like lift, water pump, street lights etc.
shall be taken as declared by the developer/builder/society/consumer.
(iv) The aforesaid procedure for estimation of load is for the purpose of
bringing about uniformity in the assessment of the load and for
providing infrastructure. However, security deposit, etc. shall be worked
out on the basis of the actual load as requested by the consumer and
individual consumer(s)/multi consumer complex and housing colony(s).
(v) For the purpose of computation of load, the built up area of individual
consumers in the case of residential multi-consumer complexes shall
be taken whereas in the case of non-residential multi-consumer
complexes the entire built up area of the complex shall be taken.
25
(vi) However, the applicant may apply for more than computed load based
on his actual need and in such cases the infrastructure is to be
developed for the load requisitioned.
4.52 Supply to Multi-Consumer Complex and Housing colonies-Special
conditions:
(i) A building or a group of buildings which normally require(s) one or
more than one LT connection and for a total load of 50 KW or above,
assessed as per clause 4.51 of this Code, shall be treated as multi-
consumer complex for the purpose of electric supply. A multi-consumer
complex shall include residential, non-residential and commercial
complexes, housing colony, office complexes, educational and training
institutions etc.
(ii) Supply to a multi-consumer complex shall be arranged through a
separate distribution transformer of adequate capacity but not less than
capacity of 100 KVA. The cost of extension including 11 KV line,
distribution transformer and L.T. lines/ cables shall be borne by the
developer/ builder/ housing society/ group of consumers/ consumer,
who applies for the connection. The applicant shall have to provide
suitable space required for the construction of the distribution
transformer substation free of charge.
(iii) In case no outdoor space can be provided by the applicant for
installation of distribution transformer / sub-station or if the applicant
wants to install the transformer sub-station indoor, the required space
for housing the transformer substation and meters shall be provided by
him free of cost for which rent or premium shall not be payable by the
licensee. In such case transformer shall be of dry type apart from
being energy efficient and all safety measures as per prevailing rules
and regulations should be taken up and followed.
(iv) If such an applicant wants to lay 11 KV and/or LT line through
underground cable, he shall be allowed to do so subject to the
condition that the relevant Indian Standards are followed.
(v) If such applicant wishes to provide transformer of rating more than 315
KVA, 11/0.4 KV with special type of protection equipment (with ISI
mark), such consumer shall have to install one extra transformer unit of
same capacity. The applicant shall bear the cost of extension of 11KV
line, sub-station bay, if any, distribution transformer and LT lines / LT
cables.
(vi) In case the total load of the multi-consumer complex/housing colonies
including all phases exceeds 1500 KW, assessed as per clause 4.51,
the applicant shall provide necessary land measuring not less than 40
x 30 meters at a token premium of Re.1, for construction of 33/11 KV
sub-station by the licensee. The location of the same shall be selected
by the Engineer in-charge of the area in consultation with the applicant.
26
(vii) If a building/ group of buildings come(s) under the category of multi-
consumer complex or housing colony due to additional construction or
additional requirement of load, and if a separate distribution
transformer of sufficient capacity for giving supply to such building(s)
was not provided earlier then, it will be provided at the cost of the
applicant. In case, for such purpose, capacity of the existing distribution
transformer substation is required to be augmented, the same may be
done by the licensee at the cost of the applicant. Further, in case the
total load of multi consumer complex/housing colonies including all
phases (existing and adjacent proposed) exceeds 1500 KW, applicant
has to provide land measuring not less than 40x30 meters for
construction of 33/11 KV sub-station at a token premium of Rs./1-.
4.53 Supply in under developed colonies – special provisions:
There are instances of cluster of plots or houses, developed and constructed,
either fully or partly, by developer/builder for which necessary
permissions/sanctions from the State Government/local bodies/competent
authorities under the appropriate laws and rules for colonies have not been
obtained and extension of line work has not been completed. In such cases
generally the individual buyer of plots /houses may apply for electricity
connection. The connections may be served to such individual consumers on
payment of proportionate cost of external electrification by such applicants.
The proportionate cost for single phase and three phase connection which
shall be worked out on the basis of the average cost of electrification of
housing colonies/multi-consumer-complexes, sanctioned in the past in
licensee's area. Such charges shall be approved by the Commission from
time to time. Extension works for such applicants or colonies shall be done
subject to realisation of minimum of 25% of the cost of extension including
11KV line and transformer sub-station, required to release connections to
present applicant(s). If the amount payable by the applicant(s) is found less
than 25% of the cost of extension, the applicants shall have to pay the excess
cost of estimate in proportion to the load applied so as to enable the licensee
to carry-out the extension work. For subsequent connection in said colony
consumers shall have to pay extension charge fixed by the Commission even
where no extension is involved to compensate the expenditure already
incurred by the licensee. However, if further extension is involved for the
subsequent applications same procedure be followed.
An Illustration in this respect is shown in Annexure 13(A).
4.54 Supply to LT Agriculture/irrigation pumps sets-Special Conditions:
(i) Electricity supply to agriculture/irrigation pump set, may also be given
to a registered co-operative society of consumers or to a group of
farmers recognized by the licensee, at one point.
(ii) The limit to which expenditure may be incurred by the licensee for
supply of electricity to agriculture/irrigation pump shall be fixed by the
Commission if any from time to time. Expenditure involved in giving
supply in excess of the limit fixed by the Commission shall be borne by
the consumer.
27
(iii) The consumer shall be intimated within 30 days of inspection whether
the licensee can take up the work with its own funds or whether the
work can be taken up only after the extra cost of the works is deposited
by the consumer, if extension of line is required. The licensee shall
inform the consumer accordingly and also intimate the exact amount
required to be deposited by the consumer.
(iv) In case the State Government wishes to bear the cost involved in
giving supply to agriculture pumps either fully or partly, such subsidy
amount should be deposited with the licensee in advance. The licensee
should also explore the possibility of taking up the work of extension of
distribution mains and/or augmentation of distribution transformer
capacity, if required, to supply electricity to irrigation pumps through
financial assistance available under any scheme of the State or Central
Government or financial institution like REC, etc.
4.55 Supply for Public Street Lights- Special Provisions:
(i) Application for supply of electricity to public street lights shall be
submitted in the prescribed form (Annexure-1) to the local office of the
licensee by the Municipal Corporation or Municipality or Nagar
Panchayat or Gram Panchayat or local body or any Government
Department or any other organization made responsible by the State
Government to maintain public street lights (which shall herein after be
called by the generic term ‘local body’).
(ii) Application for public street lights shall be accompanied by resolution
of the local body and the sketch indicating the number of poles,
existing or new, where streetlights are required. The licensee shall not
provide a new street light connection or additional street light points if
the local body has any electricity dues against it.
(iii) The local body shall bear the cost of arranging of electricity supply to
public streetlights as provided in clause 4.3 of this Code.
(iv) The licensee shall intimate the cost of extension, if required, in writing,
within 15 days in urban areas and within 30 days in rural areas from
the date of application form. The work shall be taken up only after the
amount is deposited and necessary agreement is executed by the local
body.
(v) A suitable double compartment weatherproof box be provided by the
licensee, to house the energy meter.
(vi) The fixtures, bulbs/timer etc. shall be supplied by the consumer and
replaced by the licensee within 7 days of receipt. The timer shall be set
to switch on street lights fifteen minutes before sunset and switch off
the street lights fifteen minutes after sunrise. The licensee shall carry
out switching on and switching off of street light / replacement of
fixtures/bulbs/timer, etc. on the poles on the request of the streetlight
consumers. All such services shall be on chargeable basis.
Maintenance work of special street light support such as on tubler
support, high mast light with under ground wiring etc. executed by local
body shall be done by local body only.
28
(vii) New connection for public street line in urban area be preferably with
suitable timer.
4.56 Supply to small / cottage industry – special provisions:
In order to rationalize the cost of extension payable by small / cottage
industries up to 25 HP load, the average cost of extension based on such
sanction in the past in licensee’s area may be worked out separately for urban
and rural area and got approved by the Commission. This cost of extension
shall be payable by the consumer for small / cottage industry up to 25 HP load
on per HP basis, irrespective of any extension is required or not. The
extension work wherever required can be done subject to realization of
minimum 50% of cost of extension required to release the connection on the
basis of per HP rate approved by the Commission and load applied. In case
the estimated cost of extension is found more than twice the amount payable
by the applicant on the basis of rate approved by Commission and load
applied the applicant have to pay the excess cost of extension in addition to
the cost of extension per HP basis as fixed by the Commission.
An illustration in this respect is shown in Annexure 13 (B).
This facility will be available till charges for extension of line for release of
connection to such category of consumer is decided by the commission under
Miscellaneous and General Charges if any as specified in clause 4.3 of this
Code.
One point supply to group of connections
4.57 In order to encourage HT connection instead of individual connections to
group of LT consumers in residential colonies or commercial complexes, the
Commission may consider to provide certain percentage of rebate to such HT
consumer in the applicable HT tariff. The distribution company may install
11/.4 KV transformer, its related HT & LT protective devices and maintain the
distribution transformer by billing the monthly charges as approved by the
Commission. This will avoid initial capital investment by consumer for
installation of transformer sub-station and will give relief to the consumer from
routine maintenance of transformer.
The distribution company may take up the matter with Commission through
petition after proper study and evaluation, which will be approved by the
Commission after following due regulatory process.
29
4.58 Schedule for completion of various activities relating to new connection
and increase of load
The licensee shall process and give supply of electricity to various consumers
within the time specified in the table below. For the purpose of this code urban
area means area of Nagar Nigam, Nagar Palika and Nagar Panchayat and
other than urban area means rural area:
Sl.
No.
Type of Service
Time Limit for
Rendering the Service
1
a)
Low Tension (LT) connection
Notice of inspection on receipt of complete application form
3 working days
b)
Inspection after sending notice
Urban areas
2 working days
Rural areas 5 working days
c) i)
Issue of demand note after inspection to the applicant for payment
of estimated charges (if extension work is not required and the
connection is to be given from the existing network)
Urban areas
Rural areas
5 working days
7 working days
ii) Issue of demand note after inspection to the applicant for payment
of estimated charges (if the extension work or enhancement of
transformer capacity is required)
a) Urban areas
b) Rural areas
10 working days
22 working days
d)
Where no extension is required/after completion of extension work -
Release of connection after payment of necessary charges,
execution of agreement and submission of test report by the
applicant after completion of extension work/ where no extension
required,
a. Urban area
b. Rural area
10 working days
15 working days
e)
Completion time for extension of work where extension
/augmentation of distribution main is required
a) All connections excluding agriculture
b) Agricultural connection when clear access to fields is
available
c) Agricultural connection during season when no clear access
is available
60 days
90 days
180 days from the date
access is made
available
2. High Tension (HT) Connection
a) Informing feasibility after receipt of the application form
15 working days
b) Issue of demand note of estimated charges (after the
date of issue of notice of feasibility)
30 days
c) Completion time for extension of works after payment
d) Serving of connection after payment of necessary charges and
execution of agreement by the applicant, subject to receipt of
clearance from Electrical Inspector within reasonable time after
completion of extension work
90 days
30 days
3. Extra High Tension (EHT) Connection
a) Informing feasibility after receipt of the application form
including connectivity consent required if any
30 days
b) Issue of demand note of estimate charges after issue of notice
of feasibility
60 days
c) Completion time of extension work after payment
d) Serving of connection after payment necessary charges and
execution of agreement by the applicant subject to receipt of
clearance from Chief Electrical Inspector after completion of
extension work
180 days
30 days
30
4.59 Temporary Power Supply for LT and EHT/HT connection:
(i) Any person requiring supply of electricity for a purpose that is temporary in
nature, and for a period of one year or less, may apply for temporary power
supply in the prescribed form (Annexure- 1 or 2) along with documents
prescribed in clause 4.16 and 4.17 of this Code. The applicant shall also
furnish the proof of occupation of premises or NOC from owner of premises
as the case may be. If the supply is required at a place owned by local
authority, NOC from local authority is required. A temporary supply shall be
initially for a period maximum up to one year subject to extension based on
technical feasibility at the time of extension.
(ii) Release of temporary connections is not a matter of right. It can be given
only when it is technically feasible and subject to compliance of safety
requirements as specified in CEA Safety Regulation, 2010.
(iii) In case temporary supply is required for construction purposes, where
permanent connection will be required subsequently, feasibility of permanent
connection shall first be examined prior to sanction of temporary connection.
The feasibility of subsequent permanent connection shall be informed to the
applicant before serving temporary connection.
(iv) The grant of temporary connection does not create a right in favour of the
applicant for claiming a permanent connection, which should be governed by
provisions of the Act and Regulations.
(v) If extension work is involved and is to be executed by the license at the
request of the consumer then the licensee shall intimate to the applicant the
charges to be paid for laying and also dismantling the extension work, meter
rent together with the charges for the estimated monthly consumption and
the rental of equipment and material.
Provided the consumer shall have the option either to take back the material
used for temporary connection or receive credit of the depreciated value, as
per prevailing rules, for materials dismantled and returned to stores, in good
condition, after disconnection of supply. Licensee may recover security
deposit from consumer for line or plant as per clause 6.3 of this Code.
(vi) An amount equal to estimated bill for three months or for the period of
temporary connection requisitioned whichever less is payable before serving
temporary connection, subject to replenishment from time to time and
adjustment in the last bill after disconnection. In case the consumer fails to
pay the bills in time and the advance with the licensee does not cover the
charges for the balance period, the supply is liable for disconnection.
(vii) The licensee shall release the supply maximum within 3 working days of
payment of charges and compliance of other requirements by the consumer,
where extension of distribution mains is not required. Where extension of
distribution mains is required, the supply shall be released within the 30 days
in case of LT consumers, 60 days in case of HT/EHT consumers.
31
(viii) The consumer shall be responsible for upkeep of the line from the
distribution mains to the point of supply.
(ix) The regular readings of the meter may be taken during the period of the
temporary connection to ensure that the charges payable for actual
consumption do not exceed the advance payment received. A month for the
purpose of billing of temporary supply shall mean 30 days from the date of
connection or part thereof.
(x) For extension of the period of temporary supply, the consumer shall apply
to the licensee in writing at least 7 working days before the date of expiry of
temporary supply.
(xi) After, the period of temporary supply is over and supply has been
disconnected, the licensee shall prepare the final bill and send it to the
consumer within 30 days from the date of disconnection of supply and return
the balance amount, if any, within 90 days after disconnection of supply or
within 60 days of submission of original money receipt or indemnity or
declaration in case of loss of receipt by the consumer whichever is latter. The
licensee will be liable to pay simple interest @ 1% per month or part thereof
on the amount of refund outstanding from the due date of refund. The
consumer may mention the desired mode of refund in application form.
Exceptions:
4.60 Nothing contained in this chapter shall be taken as requiring a licensee to give
supply of electricity to any premises if he is prevented from doing so due to
force majeure conditions as given in clause 13.1.
4.61 Provided that in case temporary supply is required in premises/place where
100 or more persons are likely to assemble, applicant shall submit NOC from
District Magistrate and clearance of Electrical Inspector.
4.62 Provided further that in case any permit/NOC is withdrawn by the competent
authority after energization of connection, supply shall be disconnected
forthwith and shall be reconnected only after the permit/NOC is restored.
4.63 If there are outstanding dues on the premises, temporary connection shall not
be given till such dues are paid by the consumer in full.
32
CHAPTER 5: GENERAL CONDITION OF SUPPLY
Point of Supply:
5.1 Unless otherwise agreed to, the point of supply shall mean the point of
incoming terminals of the switch gear installed by consumers:
(a) cut-outs /MCB in the case of LT consumers; and
(b) control switchgear that may be installed in the licensee’s or consumer's
premises as agreed mutually in the case of HT or EHT consumers.
5.2 Supply shall be given at a single point in the premises otherwise as provided
as clause 4.20 of this Code. However, in case of coal mines the licensee may
provide supply at more than one point to consumer having regard to the
physical layout of the installation and the requirements of the consumer. One
of the connections of an existing industrial consumer who has two different
connections for supply for the same purpose, if any, in his premises shall be
discontinued on expiry of their present agreement after issue of 15 days
notice.
Licensee’s Equipment at Consumer’s Premises
5.3 The consumer shall provide free of cost to the licensee necessary land
belonging to the consumer and provide all reasonable facilities for bringing in
not only the direct cables or overhead lines from the licensee’s system for
serving the consumer, but also cables or overhead lines connecting licensee's
other consumers and shall permit the licensee to install all requisite
switchgears and connections thereto on the above premises and to extend
supply to such other consumers through the cables and terminals situated at
the consumer's premises, provided supply to the consumer in the opinion of
the licensee is not thereby unduly affected.
5.4 The licensee is responsible for maintaining the meters and equipments,
installed at consumer's premises from where electricity is supplied to the
consumer.
Failure of fuse / supply:
5.5 If the licensee’s service fuse blows off at any time, complaint thereof should
be made to the licensee’s call centre / local office as specified. Only
authorized employees / persons possessing the photo-identity card of the
licensee are permitted to replace these fuses in the licensee’s cut-outs.
Consumers are not allowed to replace these fuses. The licensee should not
allow its employees / authorized persons to carry out any repairs in the
consumer’s installations.
5.6 The licensee shall take all reasonable precautions to ensure continuity of
supply of electrical energy to the consumer but shall not be responsible for or
liable to the consumer for any loss to him or damage to his plant and
equipment due to interruptions in supply of electrical energy due to force
majeure conditions provided in clause 13.1 of this Code.
33
5.7 The licensee shall always be entitled for the purpose related with the working
of its supply system to temporarily discontinue the supply for such period as
may be necessary, subject to reasonable advance notice being given in this
behalf, with the object of causing minimum inconvenience to the consumer.
Protection system after point of supply-
5.8 As per provision in regulation 35 of Central Electricity Authority (Measures
relating to safety and electric supply) Regulations 2010 (hereinafter CEA
Safety Regulation) the following controls shall be installed by the consumer
after the point of supply so as to be readily accessible and capable of being
early operated to completely isolate the supply to the installation. Such
equipment being in addition to any equipment installed for controlling
individual circuits or apparatus namely
(i) A linked switch with fuse or a circuit breaker by consumer of voltage
which does not exceed 650 V.
(ii) A linked switch with fuse(s) or a circuit breaker for consumers having
aggregate installed transformer/ apparatus capacity up to 1000 KVA if
supplied at voltage of 11 KV and 2500 KVA if supplied at a voltage of
33 KV.
(iii) A circuit breaker along with linked switch by consumers having an
aggregate installed transformer/ apparatus capacity above 1000 KVA if
supplied at 11 KV and above 2500 KVA if supplied at 33 KV.
(iv) A circuit breaker of appropriate capacity by consumer availing supply at
voltage exceeding 33 kV
Protection system for individual transformer-
5.9 Every individual transformer shall have following protective equipments:
(i) A circuit breaker of adequate rating on both primary and secondary
side of transformer having capacity 1000 KVA and above.
(ii) A linked switch with fuse or circuit breaker of adequate capacity on
both primary and secondary side of transformer having capacity below
1000 KVA.
Provided that link switch on primary side of transformer may be of such
capacity as to carry the full load current in closed condition and magnetising
current of transformer at the time of opening on no load condition.
Distribution Transformer Sub-station (DSS)
5.10 As per provision in the Central Electricity Authority (Technical Standards for
Construction of Electrical Plants and Electric Lines) Regulations, 2010
(hereinafter CEA Construction Standard Regulation). Particulars / parameters
for distribution transformer/sub-station shall be as follows:
Parameter 33 KV 11 KV 0.415 V
Nominal system voltage (kV) 33 11 0.415
Highest system voltage (kV) 36 12 0.450
34
System earthing Solidly
earthed
system
Solidly
earthed
system
Solidly
earthed
system
Frequency (Hz) 50 50 50
Lightning impulse withstand
voltage (kV peak)
170 75 -
Power frequency withstand
voltage (dry) (kV mms)
70 28 3
5.11 The distribution transformer can be indoor or outdoor type. The sub-station
can be constructed underground where there is paucity of space or for supply
to underground installations. Dry type transformers only shall be installed for
installation inside residential and commercial buildings. Transformer in flood
prone areas shall be above the expected water level during flood.
5.12 The maximum losses of oil filled distribution transformers shall not exceed as
that for at least three star rating transformer specified by Bureau of Energy
Efficiency (BEE).
Transformer Mounting Structure:
5.13 The following types of transformer mounting arrangement may be provided.
(1) The transformer shall be mounted on a single pole, double pole
structure or on a plinth depending upon site requirements, size and
weight of the transformer.
(2) Direct single pole mounting shall be used for transformer upto 25 kVA
only.
(3) The transformers of more than 25 kVA and upto 250 kVA can be
mounted on double pole structure or on plinth. Transformers above 250
kVA shall be mounted on plinth only.
Protection of transformer
5.14 For 33/.4 kV transformer, suitable high rupturing capacity cartridge fuses or
moulded case circuit breakers (MCCB) or miniature circuit breakers (MCB) or
air break switch shall be provided on low voltage side of transformers. The
high voltage side of these transformers shall be protected by drop out
expulsion type fuses or circuit breakers.
5.15 For 11/.4 kV transformer suitable high rupturing capacity cartridge fuse or
MCCB or MCB or Air break switch shall be provided on low voltage side of
transformer of 100 KVA and above. The high voltage side of these
transformer shall be protected by drop out expulsion type fuses or circuit
breakers.
5.16 Surge arresters of rating 9 kV on 11 kV, 20kV on 22 kV and 30 kV on 33 kV
outdoor type shall be used for diverting the lightning surges to earth.
Earthing of transformer
5.17 Connectivity of equipments with earthing shall be as follows:
35
(1) Pipe earthings or rod earthing shall be provided for the distribution sub-
station complying with relevant IS. Three (3) Nos. earth pits with three
grounding electrodes shall be provided. Adequate to keep the earth
resistance low.
(2) Earth connections shall be made as under:
(a) To one of the earth electrode:
One direct connection from the high voltage surge arrester and
another direct and separate connection from low voltage surge
arrester if low voltage surge arrester is provided.
(b) To each of the remaining two electrodes:
(i) Separate connection from the neutral side of the transformer.
(ii) Transformer body earthing 1 No., one connection from the
handle of the 33 kV or 11 kV air break switch, and channel
earthing.
(iii) One separate connection from the earthing terminal of the
poles.
(3) The transformer neutral earth pit shall be independent just opposite the
surge arrester earth pit.
Reactive Compensation for transformer:
5.18 The following points be taken into consideration at the time of reactive
compensation:
(1) Where the power factor is low, reactive compensation shall be provided
on the distribution transformers by fixed or automatic switched type
capacitors of adequate rating.
(2) In case of fixed capacitors, it shall be ensured that the rating of the
capacitors is such as to prevent over compensation during off peak
period.
(3) In cases where loads fluctuate very fast, a suitable dynamic
compensation switched capacitors shall be considered.
Setting of protective equipment of HT Consumers:
5.19 All transformers, switch-gears and other electrical equipments in the
installation of the consumer and also those directly connected to the feeders
or lines of the licensee shall be of suitable design and be maintained by the
consumer to the satisfaction of the licensee. The setting of fuses and relays
on the consumer’s control gear, as well as the rupturing capacity of any of his
circuit breakers, shall be subject to the approval of the licensee. The rupturing
capacity of circuit breaker shall be at least 20% more than the fault level
where circuit breaker is proposed to be installed to meet out future increase of
fault level.
36
Apparatus interfering with licensee’s system
5.20 The licensee may discontinue the supply giving reasons if the consumer
installs any instrument, apparatus that are likely to affect adversely, the supply
to other consumers by giving 24 hrs notice to the consumer.. Supply shall be
restored on taking appropriate remedial action by the consumer to the
satisfaction of the licensee
Prior approval from Electrical Inspector
5.21 Notwithstanding the provisions under clause 5.8 and 5.9 of the Code, it is
necessary that the HT & EHT consumer should obtain prior approval of the
Electrical Inspector about the suitability of protective devices or circuit
breakers and its charging in accordance with the provisions of the prevailing
laws, rules and regulations and shall be submitted to licensee before availing
connection. Manufacturer’s test certificate in respect of all H.T. apparatus
shall be produced, if required.
Distinction of different circuits:
5.22 The owner of every generating station, sub-station, junction-box or pillar in
which there are any circuits or apparatus, whether intended for operation at
different voltages or at the same voltage, shall ensure by means of indication
of permanent nature that the respective circuits are readily distinguishable
from one another.
Danger Notices:
5.23 The owner of every installation of voltage exceeding 250 V shall affix
permanently in a conspicuous position a danger notice in Hindi and English.
Inspection and Testing of Consumer’s Installation
5.24 Before any wiring or apparatus in the case of low-tension consumer, is
connected to the system, it shall be subject to inspection and approval of the
licensee and no connection shall be made without the licensee’s approval.
5.25 If the consumer’s installation is found to be not safe for connection, the
licensee shall advise the consumer in writing specifying the defects to be
rectified. On receipt of intimation of rectification of defects, the licensee shall
retest the installation.
5.26 The licensee shall levy no charge for the first test. Subsequent tests,
necessitated due to faults found at the initial test shall be charged for in
accordance with the rates approved by the Commission. The licensee will not
accept any responsibility with regard to the maintenance or testing of wiring or
apparatus on the consumer's premises.
Precautions against leakage before connection:
5.27 The supplier shall not connect with his works the installation or apparatus on
the premises of any applicant for supply unless he is reasonably satisfied that
37
the connection will not at the time of making the connection cause a leakage
from that installation or apparatus of a magnitude detrimental to safety which
shall be checked by measuring the installation resistance as under in
accordance with provision in regulation 35 of CEA Safety Regulation.
(i) all equipments shall have the insulation resistance (IR) value as
stipulated in the relevant Indian Standards;
(ii) on application of 500 V DC between each live conductor and
earth for a period of one minute the insulation resistance of
installation and equipment of voltage not exceeding 650 V shall
be at least 1 MEGA OHM or as specified in the relevant Indian
Standards:
(iii) on application of 2.5kV-DC between each live conductor and
earth for a period of one minute, the insulation resistance of
installation and equipment of voltage exceeding 650 V but not
exceeding 33 kV shall be at least 5 MEGA OHM or as specified
in the relevant Indian Standards.
5.28 If the supplier declines to make a connection under the provisions of clause
5.27 of this Code, he shall convey to the applicant the reasons in writing for so
declining.
Extensions and Alterations:
5.29 As per provision in regulation 29 of CEA Safety Regulation, no electrical
installation work, including additions, alterations, repairs and adjustments to
existing installations, except such replacement of lamps, fans, fuses,
switches, low voltage domestic appliances and fittings as in no way alters its
capacity or character, shall be carried out upon the premises of or on behalf of
any consumer, for the purpose of supply to such consumer except by an
electrical contractor licensed in this behalf and under the direct supervision of
a person holding a certificate of competency. Extension or alteration of load to
all high-tension installations will have to be approved by the Electrical
Inspector and similarly for all extensions and alterations of electrical
installation in mines will have to be approved by Inspector of Mines.
5.30 If as a result of such proposed extensions and alterations, there is possibility
of an increase in connected load or contract demand over the sanctioned
connected load or contract demand, the consumer shall take steps to submit
requisition for additional supply. Failure to regularize the increase in
connected load or contract demand may not only result in billing at the penal
rates, as provided for under this Code, but may also result in disconnection of
supply after due notice.
Access to Consumer’s Premises for inspection of Consumer’s Installation
5.31 The Distribution Licensee or any person duly authorized by Distribution
Licensee may, at any reasonable time, and on informing the occupier of his
intention, enter any premises to which electricity is, or has been, supplied by
him, or any premises or land, under, over, along, cross, in or upon which the
electric supply-lines or other works have been lawfully placed by him for the
purpose of:
38
(1) Inspecting, testing, repairing or altering the electric supply lines,
meters, fittings, works and apparatus for the supply of electricity
belonging to the Distribution Licensee;
(2) Ascertaining the amount of electricity supplied or the electrical quantity
contained in the supply; or
(3) Removing where a supply of electricity is no longer required, or where
the Distribution Licensee is authorized to take away and cut off such
supply, any electric supply-lines, meters, fittings, works or apparatus
belonging to the licensee.
5.32 A licensee or any person authorized as aforesaid may also, in pursuance of a
special order in this behalf made by an District Magistrate and after giving not
less than 24 hours’ notice in writing to the occupier:
(1) Enter any premises or land referred to in clause 5.31 of this Code for
any of the purposes mentioned therein;
(2) Enter any premises to which electricity is to be supplied by him, for the
purpose of examining and testing the electric wires, fittings, works and
apparatus for the use of electricity belonging to the consumer.
5.33 Where a consumer refuses to allow the licensee or any person authorized as
aforesaid to enter his premises or land in pursuance to the provisions of
above clauses, or when such licensee or any person has so entered, refuses
to allow him to perform any act which he is authorized by those clauses to
perform, or fails to give reasonable facilities for such entry or performance, the
licensee may, after the expiry of 24 hours from the service of a notice in
writing on the consumer, cut off the supply to the consumer for so long as
such refusal or failure continues.
5.34 The HT and EHT consumers shall maintain average monthly power factor as
specified by the Commission in tariff order from time to time. Consumers shall
be liable to pay penalty or receive incentive as may be specified by the
Commission, from time to time, on account of variation from specified power
factor. The licensee may discontinue supply, after due notice of 15 days, to
any installation where the average monthly power factor is found less than
70% without prejudice to the right of the licensee to levy demand/ minimum
charges as applicable during the period of disconnection.
39
PROTECTION AND EARTHING IN LT CONSUMER PREMISES:
Wiring and installation of equipments and apparatus in LT consumer’s
premises
5.35 For the protection of the consumer and the public in general, it is necessary
that the wiring of the consumer's premises should conform to the Central
Electricity Authority (Measures relating to safety and electric supply)
Regulations 2010 (CEA Safety Regulations) and be carried out by a licensed
electrical contractor. The materials used for wiring shall conform to the
relevant specifications of the Bureau of Indian Standards or its equivalent.
Wherever applicable the materials used shall bear ISI mark. As soon as the
consumer's installation for LT connection is completed in all respects and
tested by the consumer’s contractor, the consumer should submit to the
licensee, the contractor’s test report. The test report form for this purpose
shall be submitted duly filled to the local office of the licensee before release
of connection. It is important that the conditions stated therein are fully
complied with, as otherwise there may be a delay in releasing the connection.
5.36 Provisions of regulation 15 of CEA Safety Regulation should be complied with
in respect of consumer's installation. Only linked switch to operate the earthed
and live conductors simultaneously, shall be used in the consumer's
installation.
5.37 The consumer's mains shall, in all cases, be brought back to the licensee’s
point of supply and sufficient cable shall be provided for connecting up with
the licensee's apparatus.
Switches and Fuses:
5.38 The consumer shall provide proper linked quick-make and break main
switches of requisite capacity to carry and break current in each conductor
near the point of supply. The switches in the consumer’s premises shall be on
the live wire and the neutral conductor shall be marked for identification where
it leaves the consumer's main switch for connecting up to the meter. No
single pole switch or cut-out should remain inserted in any neutral conductor.
Domestic appliances:
5.39 For the safety of the wiring at the consumer’s premises, separate circuit for
heaters, geysers, air-conditioners and for cooking apparatus like oven, micro
wave oven shall be run with adequate size of wire from the main distribution
board of the consumer. Wall plugs used on the circuits for domestic
appliances shall be of the three-pin type, the third pin being connected to
"earth". Two pin plugs shall not be allowed. All appliances used in bathroom
for heating or washing purposes or in any damp location must be effectively
earthed.
Earthed terminal on consumer’s premises:
5.40 The supplier shall provide and maintain on the consumer’s premises for the
consumer’s use, a suitable earthed terminal in an accessible position at or
near the point of supply.
40
Provided that the consumer shall in addition to the aforementioned earthing
arrangement, provide his own earthing system with an independent
electrode.
5.41 The consumer shall take all reasonable precautions to prevent mechanical
damage to the earthed terminal and its lead belonging to the supplier.
Earthing in consumer’s premises:
5.42 As Safety provision for electrical installation for voltage not exceeding 650V
con