Bihar Policy for Promotion of Bihar New and Renewable Energy Sources 2025
Notification - THE ELECTRICITY ACT, 2003
- Kind: Notification
- Under: THE ELECTRICITY ACT, 2003
Text of this notification
Government ofBihar,
Energy Department
Resolution No - 3237 Date: / O, O7,zut*-
Bihar Renewable Energy Policy 2025
ABBREVIATIONS
ryRC
EqqS
BIADA
BRh]DA
Rihar Electricity Reg
Battcry Energlstoral
Bihar Industrial Area
gihui neewJle ane
BHPC Bihar State H
LADF l,ocal Area Development Fund
\4j\RE _Minisrry o[N_err anci Renerrible E,l.rgy -
.rVIoP _ Minisrry ol Po\\rr
\4 W Megq Wan
NABARD _ Narional Bank tbiRgriculrur.e anLl Bural DevJI,,prnenr
5_v!o!llqlsJlqn
ystem
r"lo]11r-9!14q1lsllIl=
I)evelopment Agency
Porver Corporation Ltd.
!P.ll9_91- qth4rslelqP"y-
IPqlr9r eih"'st"t"P" iliilC"rndi;yl-tal
CAPEX Capital E
::i:'i CTU C"n,.ul T.uT,ir.
Eg Br".gv gm.i"r"v
-
reiff
BSPHCL Bihar State Power Holding Companv Ltd.
Financial Year
GNM Net
Government of Bihar
Joint Vcnture
kw Kilo Watt
NBPDCL
NGO
PCCI
PDC
PPA
PPP
\l,oIh elltq&yer Distribution Company Ltd.
Non-govetnmcnt Organ ization
Prirrc ipa I Chicf Con<erralor.,l l-nresrs
Post Dared Cheq re
Pou_cr Purchase A g19S!.1!
_ Pub lic Private Parlnership
PSM , tqyqre1r'tQ9gqity Mechanism
lqir
RE
REC
Puh lic Sector L nderraking5
Renewable Elergy
Renewable Energy Certifi cate
Renewable Energ):qqyl9"9!qnpSnyRESCO
RPO Bqlqrya!lg I'qshase Ob li gation
St]PDCL South Bihar Power Distribution Company Ltd.
State Goods and Services TaxSGST
$1e!9!9ed llpgtc lt!9!1_r9-
sl4!9!9y9lE*p9y!r94&Uu!rttee
State Levcl Scrgening Cqqmitee
State Transmission Utility
SLDC
SLEC
SI.SC
STU
ToD Time of Day
UNFCCC United Nations Frameu,ork Convention on Clirnate Clange
Virtual Net metering\,NM
Ilihar Renervablc Enclgy Policy 2025
Government of Bihar,
Encrgy Department
Resolution
no. eo2lisr 3rcRqRo ffi-l Tzooo(ers)- 3 >37 /Patna, dated / O '07.2-014-
Sub- Bihar Policy for Promotion of BiharNew and Renewabre Energy Sources 2025
I Preamble
The Government of Bihar ("state") has steppcd up its climate neutral ambition with building upon the
goals and policies level actions for renewable energy (RE) adoption. Thc country widc RE anJ Net-Zero
largets are already sct by the lndian Covernment along with the intemational commitments and pledges.
The state has also undertakcn a detailed study to .ecommend a low carbon development pathway ind
deviscd a phase wise strategy to achieye Net-Zero by 2070. These pledges require a iaster tiajectory and
increased eflorts for RE adoption in the state. Thc state also aims to align ivith Irdia,s a;bitio; RE
target and accelerate dcployn.rent of RE projects (f'rom small to large-scale projects) considcring the state
specific scenarios.
2 Legislative Frameryork ofthe Policy
This policy will be refered as "Bihar Policy fbr Promotion of Bihar New ancl Renewable Dnergy Sources
2025" (hencefofih "Policy"). Several provisions under the Electriciry Acr, 2003 (Act) mandatei the Bihar
Electricity Regulatory commission (BERC) and the Govemment ol Bihar to take necessary steps for
promotion of RE in the state. Section 108 of the Act mandates the State to give directions to the State
Commission for promotion ofRE in the slate including policy framcwork design. This policy supersedes
the previous "tsihar Policy fbr Promotion ofBihar New and Renewable Energy Sources 2017i,.
3 Scopc
a) The scope olthc policy is limited to RE and Energy storage projcots, including but not limited to
solar (photovoltaic, thermal), hydro, wind, energy slorage (battery, pumped hydro), waste to
energy, green hydrogen (and green ammonia), geothermal technologies and any other renervable
energy technology recognized by MNRE/BREDA.
b) Thc benefits under this policy will not be applicable to the projects for u,hich ppAs have already
been signed before this policy.
Operative Period
a) This policy will come into eflbct from the date ofissuance and will remain applicable for a period
offive (5) years and/ or will remain in force till the issuance ofa new policy.
b) Rcncwable Energy Projects (REP) that arc commissioned during the opcrative period will be
eligible fbr the incentives declared under this policy, lor a period ol25 year.s from the date of
cornrrissioning or for the lifespan ofthe encrgy project, whichever is earlier. Ilspecific incentiYe
mentioned in policy for any particulars, the same rvill be considered lor its applicability.
Nodal ageucy
a) Bihar Renewable Energy Development Agency (BREDA) will be the State Nodai Agency (SNA)
for the development of all RE projects except defined RE projects in this section, Bihar State
Hydroelectdc Power Corporation Limited (BHPC) will be the State Nodal Agency (SNA) lor the
development of Hydro Power Projects and Bihar State Power Gencration Company Ltd.
(BSPGCL) rvill be the State Nodal Agency (SNA) for the developn.rent of Pumped Storage
Projects in the statc. Bihar State Power Generation Company Ltd. will also be Implementing
Agency lor the development of floating/ground mounted Solar PV Projects & Biomass power
projects above I MW and all solar powcr projects along canals and dalns across the statc.
Llihar Itcncryabie lrnergy Policy 2025
b) In addition to the aboye, Bnergy Department, Goverrunent of Bihar may nominate any
government body of thc state as Nodal/Implen.renting agency for dirferent RE technologies
dcfined in this policy.
6 Policy Targets (and Applicability)
a The policy intends to promote a diversified project folio spanning across regions and applications.
There are four broad project categories based on capicity and applicaiion: utiriry-scare RE,
distributed RE, off-grid RE and Energy Storage.
b Each tcchnology is further divided based on the dcployment location and/or mechanism defined in
this policy, the tcchnology wise targets under diflerent catcqories are:
l echnology Categories FY FY FY FY FY Cumulalive
(Summary) 25-26 26-21 28-29 29-30 Target
RE Target (MW) 1 )q7 4.134 4,854 5,481 6 )n') 23,968
Energy Storage Target (MWI{) 600 700 1,300 1,400 2,t00 6, 100
Technology Categories and
application areas
Project
Capacity
FY FY rY FY FY Cumulative
Target
25 -26 lo-l I 28-29 29-30
1 . Utilitl,-scale RE 3.030 3,767 +.) oL 4 qt, < { ,,, ) 21,653
1.1. Solar Parks >:20 MW 50 100 200 250 300 900
I .2. Other Ground Mountcd
Solar
>:0.5 MW 2,760 17)) 4.122 4 \)) 18,448
I.3. F.levated Solar Project
(over Ponds)
>=0.5 MW 50 60 80 90 120 400
I .4. Floating Solar >=0-5 MW 50 75 100 t20 150 495
1.5. Agri Voltaic Solar >:0.5 MW 50 70 80 90 100 390
1 .6. Canal Top/Bank Solar >=0.5 MW 20 30 50 70 80 250
I .7. Geothennal Power Plant >:5.0 MW 0 0 t0 l0 30 50
1.8. Biomass Power Plant >=0.5 MW 30 60 70 80 100 340
L9. Waste to Energy >:0.5 MW 10 20 30 50 70 180
1.10. Wind Power Plant >-0.5 MW l0 30 40 50 70 200
2. Distributed RE(On-Grid) 3t2 407 467 557 I q75
2.1 Rooftop Solar >=1.0 kW 50 70 100 120 160 500
2.2 Small Hydro Power
Plants
<25MW 20 30 65 65 70 250
2.3 Other Solar Power Plants
(Floating/Ground
Mounted/canal top/bank
etc. )
< 0.5 MW 30 40 50 70 80 270
2.4 Solar Agriculture (Agri
voltaic, Solarization ol
Agriculturc Feeders, Pumps
etc. )
< 0.5 MW 50 80 100 120 150 500
2.5 Biomass Power Plant < 0.5 MW 72 72 72 72 72 360
2.6 Waste to Energy < 0,5 MW 5 l0 l0 l0 l0 45
2.7 Wind Poner Plant < 0.5 MW 5 10 l0 10 l5 50
Bihar Rcnovable Energy Policy 2025
I
3. Off grid RE 35 55 65 82 r03 340
3.1 Mini and micro grids >= 1.0 kW 5 l0 10 12 l3 50
3.2 DRE (Solar for
livelihood)
>=1.0 kw 5 15 20 30 40 il0
3.3 Standalone Solar Pumps >:1.0 kw 25 30 35 40 50 180
4. Energy Storage (MWH) 600 700 1,300 1,400 2,100 6,100
4.I Purnped Storage >: l0 MwH 100 200 300 400 600 1,600
4.2 Grid Level Battery
Storage
>:l MWH 500 500 1,000 1,000 1,500 4,500
Note The above targets are time bound, SLSC will ensure periodic reyiey) ta monitor the progyess in
the stqte agoinst envisaged target. Time brnmcl prottision may be relaxecl only for Fy 25-26 and Fy
26-27 for plctnning purpose. In case, target under qny technologt area has not been met for any Fy,
lhe same may be i terchanged with other technologt areq v,ith tot{tl tqrget for thqt Fy ti remain the
some.
7 Policy Objcctives
a) To harness 23.968 Gw ofRE and 6.1 GwH 01'storage by Fy 2029-30 through non-conventional
RE resources and Energy Storagc potcntial ofthe statc
b) To promote new & efficient technique in RL ancl Energy Storage
c) To create encouraging environment and eco-system for RE adoption
d) To bring maximum stakeholder participation & actions for RE uptake
e) To give special cmphasis on innovation and development R&D facility in thc State
I To increase livelihood opportunities in the State with RE adoption
g) To increase awareness, skill & capacity development lor RE integration
8 Eligible Entities
a) All registered companies/firms/co-operatives/socicties, Stafi-ups, Govemment entities, consumers
of Discorn(s) and individuals will be eligible fot setting up ol'RE Projects \.vithin the State for sale
of electricity/captive use, in accordance with prevailing regulations.
b) Entities desiring to setup RE projects will submit a proposal with requisite details to the State
Nodal Agency (SNA) in line with the critelia specified in the Policy to avail the benefits under
the Policy.
c) Entities/lmplementing agencics/Developers will be eligible lor setting up of RE Projects under
Different mode i.e., RESCO/CAPEX/I-IybIid.
9 Thrust Technology areas and Proyisions lbr Development
This policy ensures harnessing different RE potential technology areas through range ofRE technologies,
which are as follows:
9.1 Solar PV Projects
There are various Governments schemes like Jal-.leevan-Hariyali Mission,
Model (HAM), PM Surya Ghar and PM Kusum Yojana.
Hybrid Annuity
Under this technology/schemes, solar PV projccts of difl-erent capacities will be developed; detailed
provisions lol the development olsuch projects are as below:
9.1.1 Rooftop Solar PV Projects
All the electricity consumerc ofthe state are cligible to install rooftop solar projects. Guidelines will be
developed for the promotion ofsuch schemes to ensure adoption ofrooftop solar projects in the state. The
provision lor promotion ofrooftop solar on all the buildings across the state will be below:
flihar I{enervable nnergy Policy 2025
Any Solar Power Plant (Ground rnountcd/ Reservoirs) integrated with rooftop solar prant rvithin
the premises ol electricity consumer up to 1000 kwp capacity wil be considered under this
category.
S.No. Parameter Details of provisions
No approval will be required lron.r concernecl Municipal
Corporation ot Deparlment ol Urban Development &
Housing lbr putting up solar plants including any additional
system lor monitoring the perlormance of solar plants in
existing or new buildings.
9.1.2 Solar PV Projects (other than Rooftop Solar pr.oject)
a. The solar projects (other than rooftop solar project) arc grid connected projects including but not
Iimited to ground mounted solar, floating solar, canal top/bank solar, agrivoltaics, elevated solar
projects over ponds or any other innovalive application ofsolar energy.
S.No. Parameter
No limit subjected to CTU/STU/Discon] injection approval
Allowed
i. For Sale of Power ro Discom:
1 Capacity ofthe Plant
2 Third Party Sale
3 Applicable Tarilf
1
ti
.--l
4 Metering Affangement
5 Energy Accounting
Feed in TalifflCeiling tariff for cornpetitivc bidding will be
defined by BERC.
ii. lhirJ Parry Sale or Captivc t 5e:
PPA will be executed between the Project developer/owner
and the proculer on mutually discussed and agreed rates.
Gross Metering
9.1.3 Development of Solar PV Projects
Development ofSolar PV Projects under different categories will be done in line with the following:
Category Details ofProvisions
Solar PV- Ground i. The State will prornote development of Solar parks and other
Mounted (Solar Solar I,ower Planls on Cround.
Palks/ Other ii. Minimum size ol solar park considering the geography of Bihar
Ground mounted will be 20 MW.
Solar Plant with iii. Size of othel ground mounted solar projects will be in Iine with
and without BESS) project capacity defined along with targets.
S.No.
Bihar Rcncrvable llnelly Policy 2025
4
6
Mountcd (Elevated
Solar Projects over
Ponds)
Floating Solar PV
Plant
Solar PV Plant for
Agriculture Sector
to carry out fea-sibility assessment and potential mapping of
different watcr bodies across the state for the developmenl of
floating solar porver plants.rru4uIts surar PU\!er plaDts.
iii. The SNA will facilitate in taking necessary approvals iike water
lease agreement and invite bids for conducting Environmental and
Social Impact Analysis (ESIA) ofthe water bodies.
Canal TopBank i. lhc Stcte sill prornote derelopment of solar pouer planrs on
Solar Power Plants canal tops and banks.
ii. l'he SNA will coordinate with concemed departments of the state
to cary out f'easibility assessment and potential mapping of
diflerent canal tops /banks for the development of solar power
plants. SNA will fbcilitate in taking necessary approvals lor the
i. CAPEX Model: In this model the consumer purchases the solar
system, by making 100% olthe payment upfront or financing the
systell.r through a bank or any lending entity.
ii. RDSCO Nlodel: Under this model, a RESCO developer finances,
installs, operates, and maintains the rooftop solar power plant. The
developer signs an agreement with the rooftop orvner. The rooftop
owner ntay consumc the electricity gencrated, for rvhich they have
to pay a pre decided tarifl to RESCO developer on a monthly
basis lor the tenure olthe agreement,
iii. Hybrid RESCO Modcl: Under this structure. the RESCO
devcloper leases the rooltop ofthe consumer for setting up Solar
Porver Plant and sells the power dircctly to the Discom i.e., ppA is
signcd between developcr and the Discoms. The consumer also
signs a net-mctcring agreement with the Discom.
State with an aim to utilize its precious land resource will
promoic development of Solar power projects in elevatecl fashion
over ponds.
ii.'l'he SNA will coordinate with concerned depaftments olthe state
to,-carry out feasibility assessmcnt and potential mapping of
diflerent water bodies across the state for the developmeni^of s=olar
power plants under Ihis category.
i. The State u ill promotc development of solar pouer planrs on all
types ofwater bodies like lakes, reservoirs, ponds, dams etc.
ii. The SNA will coordinate with concemed departments ofthe state
i. Solar Power Projects will be developed under this categor.y with
an aim to efficiently utilize precious land for farming and other
allied activities along with generation of power to lacilitate
increasing tlte income of famers through sustainable and self-
resilient farn.ring as well as non-farming related activities in the
state.
ii. Under this category, Agri voltaic, elevated solar projects, solar
purlps, solarization of agriculture f'eeders and any other project
for increasing the income of farmers will be developed. It should
bc ensured that installation ol solar power plants will not to be
promoted with a compromise to agri output.
Bihar Renervable hnergy Policy 2025
iii. The State in collaboration with the Central Covt./MNRE
/MoP/Multi/Bilateral bodies will undertake measures to facilitate
devclopment ofsuch projects for the farmers ofthe state.
iv. BREDA will facilitate with government agcncies for availing
subsidies, grants and/ or incentives. Thc detailed guideline of this
scheme will bc developed by BREDA in consultation with all
concerned stakeholders. T'he State will encourage grid connected
solar pump sets to benefit the fanners by way of sale ol surplus
energy to the Discons.
v. The solar power projects for the larmers will be developed under
the tbllowing categories:
a. Solar Powcr Projects on Iand and water bodies:
The purpose of developing solar porver plants under this
calegory is to sustainably utilize land for farming and other
allied activities lor strengthening agri-value chain along with
generation of power. This category will include Agri yoltaic
power plants, solarization ol agriculturc feeders etc. The
policy intends to demonstrate the potential ofAgri voltaic and
accruing benefits to thc larmers and other rural community.
BREDA will promote the development of diflerent types ol.
Agri voltaic systems in thc state through gathering more
evidence on systcm perfonnance and ctop yield.
Solar power plants will be installcd for solarizing the
agriculture feeders to cater the power requirement lor a single
or rrultiplc agriculture feeders ernanating from a distribution
sub-station (DSS) to feed power at appropriate voltage level
of the DSS depending on factors like availability of land,
technical feasibility, etc., and there is no cap ofthe capacity of
solar power plant for feeder level solarization.
Under this category maximum size of individual solar power
project at one location will not exceed 5 MW.
b. Standalone Solar Pumps:
Under this category, individual farmen of the state will be
suppodcd to install standalone solar agriculture pumps of
capacity up to l0HP for replacement ol' existing diesel
agriculture pumps / irrigalion systems in oflgrid areas, rvhere
grid supply is not available.
c. Solarization of Pumps:
Under this category, individual farmers having electric pumps
are being supported to solarize their pumps. Diesel pump
owners are also promoted to switch to electric pumps.
Frumcrs rvill be provided rvith solar panels of appropliate
capacity to facilitate them to use the generated solar power to
mect thc inigation needs and sell the surylus solar power.
Discoms rvill buy the surplus power lrom the fanners at the
per-determined rate to be decided by BERC. Solar PV
capacity up 10 two timcs of pump capaoity in kW is allowed
ulder the scheme.
Decenhalized i. DRE livelihood applications: DRE livelihood applications can
Distributed RD be defined as applications powered through a RE source, thr:
Bihar Renervablc Encrgy Policy 2025
I
could be
storage/chillier. solar powered EV charging facility, solar charkha,
etc., which help in earning livelihoods.
'l'he State will promote decentralized and off grid solar
applications olsolar power for creating Iivelihood oppoitunities as
per the guidelines issued by MNRE. SNA will also devise state
centlic guidelines for the promotion of livelihood through DRE
applications. SNA will coordinate rvith diflerent implementing
agencies and schen.rcs of differcnt Ministrics/Departmcnts anI
provide technical support lor DRE livelihood applications.
Altellltively, SNA will be appointed as implen.renting igency for
DRE Iivelihood applications in thc state.
ii. Solar Powered Mini-Micro Grid: Solar powered mini-rricro
grids will be developed prel'erably to the area rvith poor
reliability/no electricity/to bring distribution elfi ciency. Further, a
special focus would be on solarizing different sectors like
healthcarc, education, agricultute and promoting productive use of
solar electricity. State will formulate a separale mini & micro grid
policy or guideline for smooth in.rplen.rentation ofthese projecti.
iii. Greening of Vittages/City/Districts: The State wiil promote
developing Greening of Villages/City/Districts with the piovision
of catering the 100 % demand ofthe Villages/City/Districts with
ditlerent RE potential technologies as per its feasibility at the
rcgion.
iv. Other Off-crid Apptications: The State will promote off grid
solar applications to meet the requirements of eiectricitv ind
thermal energy, as per the guidelines issued by MNRE and State.
The State willpromotc setting up ofsolar power plants for sale ol
power to consumers through its own distribution system/local
solar grid. The State will also promote setting up ol stard-alone
solal systems to provide electdcity to households in rernole
villages/ hamlets (tolas) or areas with poor
elcctricity.
reliability ol
SNA will identifu priority areas/sectol.s for deployment of oflgrid
Solar PV porver plants like standalone Solar Plants, solar home
systems, Solar Street lighting system, Solar n.rid-mast lights etc.
and take nccessary action, in time bound manner, to implement
thc off grid solar syslcms in those priority areas/sectors with the
approval ofthc State governmenl.
9.2 Bioenergy,/ Waste to Encrgy Projects
a The State will encourage setting up of biomass/biogas projects/bio CNG/ bio manure/ biofuel/bio
pallets/waste to energy etc. to mcct the requirements olenergy as well as non-energy applications
in line with the guidelines issued by MNRE, as amended from time to time.
S.No. Parameter
I Capacity ofthe Plant
Delails of Provisions
No limil subjected lo CfU/SfU Discom injeclion approral.
and bio-waste availability per annum
Allowed
As approved by BERC
2
J
Third Party Sale
Applicable Tariff
Bihar Renewable Energy Policy 2025
l-
4 Metering Arrangement Net Metering up to I MW
5 EnergyAccounting SJ51ffiIl;:,:',i;"".i,IY,nu*.,
b. The state will adopt "National Bioencrgy programme (202l-2026). (subjected to future
amendments) for developing dilferent bioenergy projects as mentioncd below:
i. Waste to Energy Programme (programme on Energy frorn Urban, lndustrial and
Agricultural wastes /Rcsidues) to suppod scttirg up of large Biogas, Bio cNG and power
plants (excluding MSW to Power projects).
ii. Biomass Programme (Scheme to support Manufacturing ol Briquettes & pellets and
Promotion of Biomass (non-bagasse) based cogeneration in lndustries) to support setting up
of pellcts and briquettes lor use in power generation and non-bagasse-based power
gcueration projects.
iii. Biogas Programme to support setting up of family and medium size Biogas plants in rur.al
arcas.
9.3 Small Hydro Power Projects
a. The state will encourage the development of small hydro projecls installations for power
generation, subjected to the approval lrom BHPC.
S.No. Parameler Details of Pror isions
I Capacily of lhe Planr Subjecrcd ro approral i.om BHpC, and C I I STU Discom
2 ; Applicable Tariff
i
injection approval
i. For Sale ofPower to Discom:
Sales to Discom as per contract
lf surplus powcr available after Discom purchase
requirement, the developer will be free to scll power within
or outside the state.
Per Billing Cycle (Defined by BERC)
b. "No free power" or "Local Arca Development Fund (LADF)" will be applicable for small hydel
projects.
9.4 Wind Power Projects
a. The state will enoourage the development of wind power proj eots to hamess the huge potential of
wind energy in the state.
iS.xg--&13pt"!9. ,_
i I , c+pp_"lty 9lth9 Plglr
;- __2,_ _: Third Partliale __
i 3 I Applicable Tariff
ll
{i;,____"_ *_
Bihar Renewable Energy Policy 2025
Feed in Tariffl ceiling tarilil for competitive bidding will be
defined by BERC (Can be lixed or mix olfixed aod
variable cost).
A llowed
i. For Sale ofPower to Discom:
Feed in Tariff/ Celling tariff lor competitive bidding will
be defined by BERC.
ii. Third l'ady Sals or Captiye Usc:
PPA will be executed between the Project
developer/owner and the procurer on n.rutually discussed
Details ofProvisions
No limit subjccted ro CTU STU Discorn injecrion approval
I
l
10
ii. Third Party Sale or Captive Use:
PPA will be executed between the Project
9.5 Pumpcd Storage Projects
a. The state will encourage the development ofpumped stomge projects for the fulfiliment ofpeak
energy demand requiremcnts, Energy storage obrigation, and other compriance by voe'and
MNRE from time to time.
S.No. Parameter Details ofprovisions
I Capacir) ofrhe planr Subjecred r. ,ppror"i
--i."rlr '"iipCCL
BltpC, and
2 Appricabre rarirr :]yf;:Y:?fiTt'i.,JillTtr[ r:I demand rarirr)3 Energy Accounting per Billing Cycle (Defined by SERC)
b. Guidelines issued by MoP/MNRE will be aclopted for development of such projects in the state.
SNA will also devise state cert c guidelincs for.promotion ofsuch projects.
9.6 Hybrid RE Projects (Solar/Wind + Other Rcnewable Energy technologies)
a. The state will encourage the development of hybrid RE power projects consist of solar/wind plus
other RE generating technologies.
Applicable Tarill i. For Sale of Power to DISCOM:
Fccd in Tariffl Celling tariff for compctitive bidding will be
defined by BERC.
ii. Third Pafiy Sale or Captive Use:
PPA will be cxecuted between the Pr.oject developer/owner and
the procurer on mutually discussed and agreed rates.
Gross Meterins
i. The Statc will encourage setting up of green hydrogen projects
in linc rvith National Green Hydrogen Mission with an aim to
decarbonize induslrial, mobility and energy sectors; reduction
in dependcnce on iurported fossil fuels and feedstock;
development of indigenous manufacturing capabilities;
creation of employmcnt opportunities; and dcvelopment of4rru usvsrrrPursll ur
cutting-edge technologies.
4 Meterins Arranoefl
Per Billing Cycle (Defined by tsERC)
9.1 Other RE technologies
a. 'l'he state will encouragc the development olothcr RE technologies as below:
Details ofProvisions
i. The State will promote use of solar thermal energy for the
Solar Thermal Projects
developmenl of solar themal power projects and indushial
heating requirements as per the guidelines ofMNRE.
ii. BREDA will facilitate to proJifcrate its application in leasible
sectors including residential (solar water heaters, solar cookers,
in-door air heating etc.), commercial & industrial sector (solar
cooling, solar ail dryers, largc scale solar water hcaters, large
scale solar cooking utilizing solal. concentrator technology,
Green l{ydrogen
Proj ects
Bihar Renervable Energy Policy 2025 17
S.No Parameter Details of pror isions
I Capaciry ofrhe Plant \o lirnir subjected ro C tU Sl U Discorn injcction approval
5 Energy r
ii. ]'he State in consultation with central
provisions for developing pilot projects
agency will devise
in emerging end-use
sectors and production pathways.
i. The State will encourage setting up of geothermal energy
projects in line with potential identified in the state.
The state will encourage setting up olany other RE technology
as defincd by state/central government tirne to lime and will
dcvise modalities for dcveloping pilot project for exploring
fufiher statc celtric options.
Other RE Projects
10 Uselul Life of RE Projects
Dilfcrcnt RE projects have following uselul 1if'e:
11 Incentives
To enable RE capacity addition in the State, the tbllowing incentives will be provided for eligible entities
fol those projects being installed during thc operatiye period olthis policy.
I l.l Applicability
RE projects commissioned in the State and PPA signed for the same in the operative pcriod ofthis policy
will be eligiblc for declared incentive under this policy for a period of useful life ol the project or any
defined period from the date of scheduled commissioning ollhe projects.
I 1.2 Electricity Duty
100% cxcrnption on clectricity duty will be provided to captive/open access consumers on consun.rption
of porver from RE projects set-up within thc slatc during the policy period. Such elect city duty
exemption will be reimbursed lrom thc concemed utility and will be applicable for consumption ofpower
from such projects for a period ol l5 years fi om the date of commissioning of thc project.
11.3 State Goods and Service Ta-r (SGSl')
100% exemption lrom the payment ofSGST for all the materials required for development olRE projects
and EV charging stations will be provided by the Commercial -Iax Department for a period of 5 years.
The applicable amount will be reimbursed lrom the depafiment as per CST Courcil Recommendation.
S.No RE Project Useful Life
(Years)
1 Wind cncrgy power project 25
2 Biomass power projecl with Rankine cycle tcchnology 25
3 Non-fossil fuel coggncration project 25
4 Small Hydro Plant 40
5 Pump storage Projgct 40
6 Municipal Solid Waste (MSW)/Refuse Derived Fuel (RDF) based power
proi ect
20
l Solar PV/Solar thermal power pro.jcct l)
8 Geothermal Power Pro.jects 20
9 Biogas based power proiect 25
l0 Biomass Gasifier based power project 25
tsihar llenewable Energy Policy 2025 72
Geothermal Projects
ii. The State in consultation with central agcncy will devisc
provisions lor dcveloping pilot projccts in emerging cnd-use
secton and production pathways lor increasing thc penetration
It--
il
1 1.4 Open Access
lntra-state, open access clearance lor the whole tenure of the project or 25 years whichever is earlier will
be grantcd. In absence of any response or intimation from the Discoms/Transcom to the RE generator
within 30 days, then such application will be considered to be dccmcd open access. The applicable
charges will bc governed by BERC regulations lor thc samc.
1 1.5 Stamp Duty
100% reimburscrrent of stamp dutyhegistration lees levied on lcasc/ sale /transfer of industrial land/shed
as also those outside the jurisdiction ol'Bihar lndustrial Area Development Authority would be available
to all the trew units after the unit coflur]ences the cornrnercial production. This reimbursement of stamp
duty and registration fees will be granted only lor the firct time and will not be applicable in subsequent
stages of lease/sale/transfer. This incentive will be available to new units only as per Indian stamp act
1899 under section 9 (l) & under section 78 ofregistration act 1908 in state Gazctte. Ifany existing units
setup RE Plant or goes for expansion ol RE Plant, done it will be treated as new unit only lor sctting up
additional new RE capacity plant.
I 1 .6 Free Power and Local Area Developrnent !'und (LADF)
No ltee porver or [.ocal Area Development Fund (LADF) will be applicable for the development of small
hydel projects within the state during operalive period ofthis policy.
1 1.7 Land Conversion Charges
100%0 reimbursement of land conversion fees/ change in land use fees being levied for conversion of
agricultural land after the unit commences the commercial production as per Bihar agriculture land
(conversion for non-agricultural purpose) act 2010.
I1.8 Exemption from transmission and wheeling charges
Exemption of 100% on transmission and wheeling charges on RE projects developed for power
consumption within the state for a period of 15 years from date of commissioning of the project. Gdd
connected RE projects with storage systems selling power within the state will attract higher exemption
lrom lransmission and wheeling chargcs lor a pcriod ol20 years from the date of commissioning ofthe
project in line with Ministry of Power, Gol and will be applicable for intra State only. The details ofthe
cxemption will also be specified in the bidding document lor projects developed through bidding route.
The transmission and distribution losses will be applicable in line with BERC regulations as amended
from time to timc.
I 1.9 STU Charges
Exemption on STU Charges will be provided to captive/open access consumers on consumption ofpower
lrom RE projccts commissioned in the stale during operative period of this policy in line with BERC
regulations for the state.
1 i.10 Banking Charges
Banking of 100% ofRE will be permitted lor all captive and open access/ schcduled consumers during all
i2 rnonths of the year. Banking charges and other clauses will be applicable for all RE projects
oommissioned in the state during operative period of this policy in line with BERC regulations as
amended from time to timc.
I l.l I Tariff Mechanism
a. Feed-in-Tariff(FiT)
BERC will announce separate 1'eed-in-tariff for diffirrent lcchnology areas, in order to facilitale
flourishment of defined RE tcchnology areas in the state. State may fufiher give directions to BERC to
lurther devise technology as well capacity centric FiTs considcring the state centric scenarios for the
plomotion ofRE in thc state.
Bihar Renewable llnetgy Policy 2025 13
ln addition to above, BERC may introduce time-of-the-use RE fced-in tariff's to encourage RE projects
and storage operators to feed-in encrgy into the grid whcn dernand is high.
b. SolarizationolAgricultureFeeder
Discorns are promoted to determine the appropriate ceiling tariff that adcquately captures the smaller
projcct sizes and higher transaotion costs and may consider revision if required to implement the solar for
agriculture scheme. In addition, distribution substation wise solar evacuation capacity will be published in
transparent manner especially for agriculture dominated districts by Discoms.
c. Green Tariff
lo promote consumers to opt for green energy! BBRC may introduce'Green Tarilf for all consumers,
including extra high voltage, high voltage, and low voltage categorics. Green tariff rate will be either
lower than or equivalent to the average pooled power purchase cost liom diflercnt RE sources ol energy
ofDiscom to encouage early movers.
In addition, if the consumer is not an obligated entity under Rpo Regulations, the procurement of power
rvill be considered towards RPO fulfilment of Discom.
d. Virtual/Group Net Metering
To promote and facilitate the eligiblc consumers, especially locatcd in the urban/rural centcrs ofBihar and
having constraints like aceess to adequate rooftop arczL/ inaccessible rooftops, etc. and various entities
having multiple electricity connections, Virtual Net Metering (\NM), including Group Virtual Net
Metering may be promoted with suitable regulations.
11.12 Single Window Facility
a. A dcdicated Single Window Cell will be crealed by BREDA to ease time bound approval olthe
ploj ects.
b. Submission ofproposal for RE projects under all the catcgories will be submitted through the single
window facility. In case the project dcvclopment is caried out through bidding process, the
dcvcloper will submit the relevant documents to singlc window cell for required facilitation approval
lrom diflerent stakeholders.
c. All the statutory clearances and approvals will be provided to the RE projects through this single
window facility in a time bound manner within 60 days fiom date ofsubmission ofproposal through
this facility.
d. BREDA will facilitate RE project developers jn obtaining all necessary clearances/approvals and
incentives from diffbrent Goyernment dcpartments through this single window facility as specified in
the Policy.
e. This facility will be extended to the projccts under the solar lor agriculture scheme as applicable to
reduce the challenges of inter-department coordination.
f. The modalities of the single window clearance mechanism will be notified within 90 days from the
date ofissue ofthis policy.
1 1.13 Carbon Credit/Carbon Pricing
The RE generating entity will retain the entirc procccds of carbon credit, if any, frorl an approved Clean
Development Mechanism (CDM) project or mechanism under United Nalions Framework Convention on
Climate Change (UNFCCC) or any other mechanism developed by government of India. State will
develop its own carbon credit and trading platlorm to promotc deployment of RE projects and
dccarbonize its carbon footprint.
I 1.14 Deel.red Industry Status
All RE plants will be treated as 'industry' under the schemes administered by the prevailing Industrial
Policy ol'Bihar and incentives available to industrial units will be available to the RE projects. BREDA
will recomrnend for sanctions and disbursement of the subsidy/incentives contained in Bihar Industrial
Bihar Renewable Energy Polic), 2025 74
Policy and any an.rendments fiom time to time. For subsidy/incentives flowing out from this policy not
covered under the state Industrial Policy, a committcc would be constituted by the Dncrgy Deparlment.
In case of any inconsistency betwccn the prevailing Industrial Policy of Bihar and this policy, the
provisions under this policy will prevail.
1 1.15 Prornotion olsetting up ofRE based Electric Vehicle (EV) Charging Stations
The shift to clean and green mobility has been a necessity due 10 increase in carbon emission lrom lossil
luel rvhich leads to global warming and ultimatcly climate change. The rapid increase in fossil fuel
consumption duc to rising vehicular movement has led to increase in pollution and an adyerse in]pact on
economy because ofthe rising import bill.
The above lactors are main reasons for adoption olEVs and supporting tcchnologies. The requirement of
suitable grid-comected electricity has been a major challenge for establishing sufficient charging stations
fbr the EVs. Charging ofEVs from electricity generated from non- conventional sources further facilitates
reduction ofcarbon footprint. In view ofthe above, the Stalc will promote the use ofrenewable energy for
charging ofEVs in the following manner:
a. The Charging Inlrastructurc will be developed as per the guidelines and standards issucd by
Ministry ofPower/ Central Electricity Authority/ State.
b. The EV charging stations may be established by the State/Ccntral Public Sector Undefiakings,
private opcrutors or under public private partnership models.
c. Goverrmert land will be allotted at 50o/o concessional rate to first 1000 nos. or 50 MW (whichever
is higher) RE-based EV charging stations installcd within 5 years from the date of commencement
ofthis Policy.
d. The charging station seryice providets may set up RE generation plants within their premises for
captive use and may also draw RE power through opcn acccss lrom generation plants located
within the State to avail the benefits as provided 100% exemption in normal transmission and
wheeling charges for a period of25years from thc datc ofeslablishment ofEV charging Station.
e. The aforesaid benefits would also be available to the chain of EV charging stations owned by a
singlc service provider.
f. The State will suppoft Research & Development activities regarding promotior and use of RE by
EV charging stations.
g. Electricity tarifl applicable lor all Public and Captive charging stations for commercial usc (i.e.,
charging facilities used by fleet owners) will be notified by BERC.
l l .l 6 Must Run Status
St,DC u,ill ensure 'Must Run' Status of all RE projects in the State in accordance with applicable BERC
Regulations and maintain the data ofpower curtailment oldifferent RE projccts in a transparent manner.
All RE projects will lorecast and schedule thcir generation as per applicable BERC Regulations as
amended from time to time. The feeders encompassing RE projects will be managed to cnsure their must
run compliance by keeping thc priority fccdcrs (fceders with cumulative capacity of RE projects more
than I MW with at least one plant ofsize 0-5 MW) 'ON' during operating hours ofthe projects. Project
devcloper of plant size 0.5 MW and above will share the techrical details of plant duly signed by
concemed official ol Discom/Transcom to SLDC lor meeting the above requirements.
1 1 .17 Minimurn Generation Compensation
The loss in generation of RE power from projects developed within the statc due to failure of grid, except
during events like consideration of grid security or safety of any equipment or persomel or other such
conditions, the RE generator will be eligible fot a Minimum Generation Compensation lrom the procurer
ofpower in line with penalty clause for non-compliance of Must Run status.
l2 Penalty for Non-compliance of Must Run Status
Penalty will be applicable in ca-so the concerned utility will not lulfill the conditions to ensure must run
status of RD projects developed in the state during this policy period. The RE Projects installed in the
Bihar Renervable Dnergy Policy 2025 15
state afc priority projects and inftastructure facility rvill be developed to comply their must run status. To
corrply the must run status ofthe RE projects, the Discoms/Transcom will keep priority feeders (lbeders
with cun.rulative capacity of RE projects more than I MW with at least one plant ol size 0.5 Mw) ,oN'
during operating hours ofthe projects. In case the RE plant doesn't meets thc oriteria of must run due to
failure of grid, except during events likc consideration of grid security or safety of any equipment or
personnei or other such conditions as may be intilr.ratcd by SLDC or any competent authority, the RE
Generator rvill be eligible for a Minimum Gencration compensation, lrom the procurer of power, in the
rranner detailcd below.
Minimum Generation compensation = 100% of l(Average Generation per hour during the month)
x (number of backdown hours during the month) x PPA Tariffl
where, Average Genq'(ttion per hottr during the month (kWh) =Tcttal generation in the mcnth (kllh) +
Totql hottrs of generation in the monlh Compensollon vi only be applicable in case generotion from the
pul'er proiects would be less than the lhreshold geruerqtion. Threshold generotion will be definecl in lite
vith applicable cuF of the ge erating unit deJined qs per the procurement dpreement bebeeen tlrc
developer and procurer.
The RE generator will be eligiblc to claim the requisite amount from concerrred procurer of power,
BREDA will provide necessary suppofi lor the same. Concerned Porver Procurer rvill submit the penalty
amount to the singlc window account. This clause will only be applicable for the projects where thc
polver procursment is done by state Discom.
l3 Mandatory use of RE sources
State will issue amendments to the Building Rules, nraking the use of solar water heating systems
mandatory lor all designated new Houses/buildings/Marriage halls/hotels/hostels etc. with an area of
more than 350 Sq. metre. Installation ol solar water hcating systems wili be n.rade nrandatory for
industries having hot water boiler/ steam boiler using fossil fuel. Large Industries having 1000 KVA an4
above as connccted load, will be n.randated to install solar PV project to offlet their electricity demand.
l4 Convergence of Schemcs
State will devise necessary provisions for the convergence of diflerent govemment schemcs for
intcgration and coordination of various programs, funds, and expertise across different departments and
agencies for the promotion olRE project deyelopment in the state. The aim ofthis initiative is to optimize
public investmcnts and enhance their impact on the people ofthe state.
15 Resource (land/Canal/reservoir/River/Rooftops etc.)
It is the responsibility ofthe project developcr to acquire the required resource lor setting up the project.
However, in casc ol rcsource owned by state govemment, allotment will be done as per tlle prevailing
government policy.
I3REDA will also create a'Resourcc Information Bank'for every district which will be made accessible
online through BREDA website. Resource owners, including larmers may come lorward and provide the
details of their resource to the concerned officials or BREDA. The district level officer of the concemed
resource will gather details of thcir source suitable for deployment of RE projects in the respective
district; BREDA will collect the same at the state level. BREDA will also lakc initiatives to aggregate
resources that can be used for development of RE projects lrom the diflerent stakeholders.
All the state government depaltments will be requested to provide a Iist ofnumber ofrooftops that may be
used for rooftop solar projccts. As a mandate, all government rooftops will be utilized for setting up of
grid connected solar rooftop project. The project will be executed through BREDA, or any designated
nodal agency nominated by the Energy Dcpa ment.
Bihar Renewable lrnergy Policy 2025 16
The project dcvelopers can directly purchase pdvatc land for setting up projects and use of agriculture
land will also be allowed as per provisions of State Industrial PoJicy. Government departments may
translcr land to BIADA for allocation to solar projects on a rental basis. Transler land will be updated in
tsIADA's vacant list and allocate to solar projects in the Project Clearance Committee (PCC) meeting.
Ptojects with an operalional life of 25-30 years will be allotted land from BIADA or outside BIADA on
lease basis agreemcnt.
For allotment of resources, the Bihar Renewable Energy Resource Allotment Cornmittee (BREI{AC) rvill
take all decisions related to resource allotment. The corrmittee will also bc responsible lor returning back
the resources to the respcctive depafiment after expiry olthe lcase agreement. The committee wili have
thc lollowing members:
i) Chief Secretary - Government of Bihar Chairperson
ii) Secretary /Principal Secretary, Dcpartment of Energy Membcr &Convener
iii) Secretary/ Principal Secretary, Department of Revenue and
Land Reforms Department
Member
iv) Secretary/ Principal Secretary, Department of Water Resources Mcmber
v) Secretary/ Principal Secretary, Depadment of Agriculture Member
16 EnyironmentalClcarance
As per the notification flron.r Ministry of Environment, Forest and Climate
must be noted:
a) Power plants upto 25 MW, based on biomass and using
Change, following pointers
auxiliary lucls such as
coal/lignite/petroleum products up to 15% are exempted.
b) Power plants up to 25 MW, ba-sed on non-hazardous waste n.runicipal and using auxiliary luels
such as coal/ lignite/ petroleum products up to 15olo are exempted.
c) Power plants using waste heat boiler without any auxiliary are exempted.
d) Bihar State Pollution Contlol Board will also issue clearances within 30 days lrom the date of
application.
c) AII rules & notification from Ministry ofEnvironmcnt, Forest and Climate Change regarding RE
projects will be applicable.
l7 Building RE Based Manufacturing Capacity
The state government will focus on creating adequate ecosystem lor the promotion of RE based
equipment manufaoturing facilities. For solar, the focus will not be confined to solar PV module
assembling, manufacturing facility to strengthen the solar value chain starting from polysilicon to solar
modules will be promoted. Manufacturing ol Balancc of Systcrr as wcll as asscmbling of equipment for
applications like mini grids, solar streetlights, solar irrigation pumps, etc. will also be promoted in the
state. Promotion ol manufacturing capacity will be done in collaboration with other departments by
enabling provisions for establishing special cqonomic zoncs in thc stalcs. l hc statc govemment will take
following actions in this regard.
a. Priority allohnent ofGovemment land in solar parks/other RE parks on a long-tenn lease basis.
b. Electricity duty will be waived for the new manufacturing facilities for RE and other related
components for a period of5 years.
c. 100% exemption on stamp duty.
d. Rcimbursement of SGST based ircertive to all RE equipment manufhcturers.
e. 100% reimbursement of custom duty paid on input required for manufacturing solar RE equipment
battery storage lor a period of5 years.
f. Any other incentiyes provided in the prevailing Bihar Industrial Policy and any amendments from
time to timc.
Bihar Renewable [nergy Policy 2025 71
l8 Research and Development (R&D) and Stakeholders Engagement lbr lnnovation
a. BREDA will collaborate with multilateral Agencies at local/ National/ Intcrnational levels 1br
advancing RE research and development in the State for technical and financial support.
b. BREDA will work with concerned departments to support pilot demonstration lor carrying out end-
ol-lilc waste management.
c. BREDA will undertake research thLrough identification of dillbrent tbcus areas for further Policy
Interventions. The locus areas will be decided by BREDA in consultation with the Bihar R & D and
lnnovation Committee for every financial year.
d. Minimum 5 % of the total budget for a financial year will be dedicated for Research and
Development (R&D). This includes piloting a project under focus area, trainings for internal human
resources ofthe stale and other support for commercialization ofRE project in the state,
e. Dedicatcd R&D Centre for RE will be made operational initially under BREDA, the same may be
developed as an independent entity ofthe state for performing the above roles.
I Bihar R & D and Innovation Committee will take decision for the developmerlt of a separate entit)
like Bihar Energy Research and Management lnslilutc lor pcrforming all works rclated to R&D,
Innovation, Trainings etc.
g. Dedicated human rcsource(manpower/expefis) will be engaged under BREDA for perlorming all
necessary work like engaging with state/central government/ expefl organization/ any other entity for
facilitation the project development on the tbcus area.
h. BREDA will collaborate with multilateral Agencies at local/ National/ Intemational levels for
bringing innovations considering the state centric scenarios.
i. BREDA rvill organize nationaUstate/district lcvcl consultation with workshops/challenges to bring
innovation 1o solve ground level issues in the state through renewable energy. Minimum two number
ofsuch workshop/challenges will be organized in every financial year.
j. A committee will be lormed narnely Bihar R & D and lnnovation Committcc lor organizing the
workshop/challenge will be as bclow:
Director - BRh,DA Chairperson
i. Managing Dircctor - BHPC or lheir representative Member & Convener
iii. Managing Director - NBPDCL or their Reprcscntative Member
iv. Managing Director - SBPDCL or their Representative Member
v. Managing Director - BSPTCL or their Representative Member
vi. Managing Director - BSPGCL or their Representative Member
vii. Dircotor - IIT Patna or their Representative Member
viii. Director - NIT Patna or thcir Representative Mcmbcr
ix. President - Bihar Industries Association or their Representative Mernber
x. Rcnewable Energy Expert Q',Jominatcd by BRIIIA) Member
xi. Renewable Encrgy Project Developer Open Representation
19 Payment Security Mechanism (PSM)
a. The Nodal Agency in consultation with the departments will sct up a payment security mechanisln
for thc sale of electricity to Covemment Dcpartments and Discoms in line with MoP guidelines.
b. The Nodal Agency may explore option of creating the PSM by means of creating ESCROW
accounts of thc department and the developer and the first right of way with the dcveloper for
collection olundisputed dues which the department may have t'ailed to pay in time.
c. Thc Nodal Agency may also create the PSM with Post-dated cheques (PDC) or Bank Guarantees
from Government Department equal to at least Six Months Energy Bill.
d. The Nodal Agency will also provide assistance to the developers by engaging with the govemment
department and aranging for documents required for availing finance
e. l'he Nodal Agency will facilitate the renewable plant developcrs to avail the subsidy available from
Central and/or State Governmcnt.
Bihar Renewable Energy Policy 2025 18
20 Data monitoring
AvailabiJity ofdata plays a key role for project developers and system installers while making investmcnt
dccisions. state will set up new precedents in data tlansparency ancl will endeavor to have the
performance data olprojects in public domain through its web portal and though mobile application. AII
ncw projects to be set up in Bihar will be mandaled to record and provi<le real time data pertaining to
plant performance, which will be collated and presented on the web porlal. oncc implemented for grid
connected projects, the data monitoring plan will be cxtended to off-grid and clecentralized projecti as
well. The data such collected will help in identilying the key faclors affecting the plant perlonnance and
then rvork on rvays to improve operational elticiencies ofprojccts.
The state govemmenl will also set up 10 weathcr stations with support liom NIWE at locations suitable
lor settirg up of dilferent RE projects, including the proposed RE parks. RE resource data is required by
the project developers to estimate generation lrorn project, hence, to calculate the financial retuins. Thii
will provide the project developers with the inlbrmation that is bankable and will reduce the possibility of
project failure at the stage offinancial closurc.
2l Transmission and Distribution Infrastructure
Req uirements:
a. Grid integration will be in accordance with Central Elcclricity Authority (CEA) technical
guidelines "Tcchnical standards for connectivity 10 the Grid (Amendment) Rcgulations, 2019',.
b. lnterconnectionvoltages:
RE Proiect Capacitv (C) Interconnection Specifi cation
lkw<c<7kw 220 V, 1 d/3 d
7 kw< c s 100 kw 220Y / 440y / I 1kV. 3 d
t00kw<c:5000kw 11kV/33kV,30
c > 5000 kw 33kV/r 32 kV/ 220 kV, 3 d
Note: As per the tech ical -feasibility at the site.
c. The grid intercormection will be in accordance with the prevailing norms of BERC, CERC, ani
CEA, as amended from time to time.
d. The respective evacuation and interconnection f'acility will be initially approved by CTU / STU i
Discom depending on the injection level, sparc nctwork capacity and other system sludics as per
feasibility of existing infrastructure.
Provisions:
a. For all identified resources by BREDArNodal Agency for the devclopment ofmegawatt scale RE
projects, state transmissiorVdistribution utilities or the Special Purpose Vehiclc/ Joint Venture of
the state government in CAPEX, as the case may be, will construcraugnent the necessary green
grid infrastructure for conneclivity and evacuation of RE power liom generating point through
the nearest substations. All costs of construction of transmission netrvork for the evacuation
infrastructure in this casc will be bome by the State Government. Bidding for project
development will be conducted only once the neccssary pre-development activities at the
designated resource sites are complcted or ncaring completion. Projects deployed in this case will
be first utilized to meet the RPO of thc statc Discoms before sale to anv other entitv within or
outside the state.
b. For RE projects developed within the state, lransmission/distlibution utilities will bear the cost of
development of transn.rission/dish ibution line and other necessary infrastructure likc metering and
protective instruments up to a distancc of 10 km. In case thc distance between the inter-
conncction point and point ofgrid connectivity is more than l0 kn.r then the cost ofdevelopment
of transmissior/dishibution line and other necessary infrastructure for thc distance beyond the 10
km will be bornc cqually between the developer and the transmission/distribution utilities.
Bihar Rcnervable Eoergy Policy 2025 t9
Concerned transmission/distribution utilities are applicable lor claiming all above cost lrom the
state goYemmcnt.
Any upstream systcm strengthening requircment will be borne by transmission/distribution
utilitics on a priority basis. Supervision charges levied by the transmission/dist bution utilities
will be exen.rpted lor all RE porver projects except utility scale RE power projects.
Transmission/Distribution utilities will process and close the proposals for technical leasibility
within thirty (30) days ofreceipt ol'application fi.om the RE projcct developers. All the proposals
will be submitted through online application poflal of BREDA. The rate lor the development of
inftastructure thcility will bc in line with SoR ofconcerned transmissioo/distribution utilities. In
case developer develops the transmission/distribution infiastructure, the same will be disbursed
by concerned utility in consultation with BREDA as per the above ratc.
In case, there is no excess capacity left for porvcr evacuation at any Substatior/DT, concerned
Transconr/discom will cnhance the substation/DT capacity for catering the power produced from
ncw RE projcct in the area. No rejection ofany RE project will be allowcd due to non-availability
ofpou,er evacuation capacity at alry Substation/DT.
11 must bc ensured that the cost fbr tlte development of evacuation infraslructure for RE projects
should not passed on to the consumer tarilL SLSC has right to modify the range for the
developrnent olevacuation inftastructure uptol0 km to any required length for the prornotion of
RE projects lor state interest.
Note: BREDA/Nodal Agency will carry out fund assessment i1 Ii e with torget in the policy and submit
the sane to Department of Ener|1t.
22 Power Sale Mechanism
22.I RE Power projects for Sale ofPower to Discom:
The compctitive bidding routc will be followed lor proourement of power by Discoms from
dilferent RE projects considering the threshold capacity lor the concerned technology, as approved
by the State/Covernment of' India, from time to time. Moreoyer, this RE Policy rccognizes
threshold capacity for all RE projects to be 5 MW, the same may be revised by BERC from time to
time in line with central goyernment orders. Procurement of power, lrom grid connected RE
Projects, having individual size of5 MW and above, will be done through competitive bidding.
Below the threshold capacity, BERC will devise separate technology centric feed in tariff (FiT) for
purchase ofpowcr lrom diflercnt llE gcncmling units. Fil'will remain firm lor all capacities below
the thrcshold capacity, no competitive bidding will be performed for the same.
In order to t'acilitate flourishment of different technology areas of RE in the state and capacity
enhancement constraints, BERC rriay bc asked to devise technology as well capacity centric FiTs
considering the \tale ccnlric sccnarios.
22.2 RE Power projects undcr Rencwablc Ilnergy Certificate (REC) Mechanisrn
The State will promote the development of RE power plants through purchasc of power under the
REC mechanism in accordance with the administrative plocedure regarding registration and
acoreditation, as decided by the state or Central Electricity Regulatory Commission (CERC) and its
amendmcnt time to time.
BREDA being the state agency will extend its support lor the accreditation of the RE power plant
and rccommending its registration with the Central Agency in a time bound manner. In carrying out
its role, BREDA will be guidcd by any directions given to it by BERC for the implementation of
the framework, fiom time to time. BREDA in consultalion ol state Discoms will formulate
guidelines for the development ofRE projects under REC Mechanisln.
Bihar Renervable Energy Policy 2025 20
22.3 Rcncwable Power Plants lor Sale of F.lectricity to any entity othel than the Discom (Third-Part-v
Sale):
The State will promote developmcnt of RB power plants for sale of electricity to any entity other
than the Discoms. The sale of clcctricity by the owner of RE power plants to any other entity will
be considered as Third-Party Salc. RE Power Projects may be installed for Third-Pafy Sale without
any capacity restrictiors. Discoms will proYidc open access approval in time bound manner to
promote third party sale ofpower.
23 Ilihar Akshay Urja Kendra
BR[DA will open a dedicated Bihar Akshay Urja Kendra in every district with the following objectives
and responsibililies:
a. To give inlonnation about the policy, program, and subsidy Ievel information to the local people.
b. I o organizc local level Skill Developmcnt and Capacity Building support lor tho promotion of RE
and related practices.
c. To organizc Urja Mcla with an aim to showcase different products available under different
technology areas.
d. To act as a one-point center lor service level support in consultation with the developers/OEMs.
e. Any othel support at the district lcvel as planned by BREDA/It.rplementing Agency.
23. I Mode of Development and Management:
a. BREDA will empanel at least two developers/OEMs fbr supply of appliances and post supply
support through their local level service centers for every district.
b. Promotion willbe done about the appliance, applicable rate, and subsidy provisions under different
schemes of government (state/central).
c. Trvo technical resources from every developer/OEM will be stationed at the Bihar Akshay Urja
Kcndra lor providing technical suppot and trainings as required.
d. Details ofall the sold appliances will be made available to BREDA post supply fol defined period
ofthe appliance.
24 Application Proccss
24.1 Submission ofProposal lor project development
BREDA will be the one-point contact for inviting proposal lor the development of all RE projects,
cligible entities rnay avail all the necessary support described under in this policy for the development of
difl'erent RE projects. The eligible developer will submit their proposal with all necessary documents
through single rvindow portal for availing thc bcnefits under this policy. Proposal will be subniitted
online/offline to tsREDA office, the required documents for submission ol proposal and availing the
bcnefits under this policy are as follows:
a. Detailcd Project Report (DPR) ofthe Project.
b. Starlup India Recognition certificate/ Udyam Certificate,NSlC Certificate/ Certificate issucd by
Concerned Industry Dept. for involvement in related business.
c. Firm's registration cefiificate/ Registration ci:rtificate.
d. GST ceftificatc.
e. PAN Card
f. Audited Balance sheet ofat lcilst onc year, ifapplicable.
g. Incomc tax return certiflcate ofat least one year.
24.2 ApplicationCharges
BREDA will ohargc following processing fee (non-refundablc):
Bihar Renervable Energy Policy 2025 2l
S.No- Plant Capacity Processing Fee
1 <10 KW Rs. 1,000 /-
2 >:10 KW but <100 kW Rs. 2,000 /-
J >:100 KW but <500 kW Rs. 5,000 /-
4 >=500 KW but <1000 kW Rs. 10.000 I
5 1 MW and above Rs. 50,000 /- per MW maximum Rs. 5 Lakh per proposal
Note: Oirl1 comnercial category projects will bear ctbove fee. The projecls deteloped under above mode
will be considered to be deened registered with BREDI once the projects stqrt commerciql
operdtions. In this case developer y,ill take q regisb'ation certirtcate Jiou BREDA aJier submissiort
of necess ary documents \vi th B REDA.
25 Bihar Renervable Energy Development Fund (BRDF)
State will create Bihar Renewable Energy Development Fund (BRDF), this fund will be utilized for
facilitating the state to meet the objectives defined in lhis policy. BREDA will organize committee
members meeting within 3 months from the date of notification of this policy to discuss on the structure
lor management of BRDF ard department wise responsibility for lund management. The detailed
attributcs oIBRDF are as below.
25.1 Objectives
a. Providing ali the financial incentives as envisaged in this policy for development and deployrnent of
RE Projects in the state.
b. Focus on Research and Development relating to different RE technologies.
c. Suppofiing startups in the field ofRE and its innovative applications in tht: state.
d. Capacity building suppot for creating a conducive environment for RE acceleration in the state.
25.2 Fund Creation
Necessary work for fund creation and co-ordination with the concerned depafiment will bc carried out by
BREDA and other Nodal Agency nominated by L,ncrgy Department. A Fund Management unit will be
created withir BREDA for all necessary work related to fund creation, this unit will constitute one official
fron BHPC and BSPGCL. BRDF rvill be created through the follorving modes:
a. Fund allocaterl to the state through the state/central government under different schemes, RE
programs and green budget etc.
b. The lund created through application fees for proposal submission and registration charges for the
projects.
c. ;l'he fund created through collection ofpenalties lrorn obligated cntities under default by BERC as
per BERC (Renewable Purchase obligation & its compliance) Regulations notified by the
Commission from time to time.
d. Fund created through incentive/penalty imposed under Encrgy consetvation Building code
(ECBC) in line with BERC Regulations.
e. The lund created through collection ol tlxed and variable charges liom common inftastructure
facility for RE projects/manufacturing units in solar parks, exclusivc manulacturillg zones etc.
f. The fund created through revenue generated from sale of power from all RE plants developed
within state. All RE power developer will contribute an amount of 1 paise per unit of elcctricity
produced from different RE power projects devcloped within thc statc.
g. Fund creatcd through contributions from any other sources such as funding by biJateral or
multilateral organizations.
h. Fund created through Corporate Social Responsibility (CSR) ofdifferent entities in thc state.
Llihar Rencwable Lnergy Policy 2025 22
i. Fund created through National Bank for Agriculture and Rural Development (NABARD)/Powet
Finance Corporation (PFC)/REC/Banks in line with priority sector lending or any other financial
mechanisms for lacilitalion in the dcvclopment of RE projects through multiple financing models.
j. Fund allocated to the state ulder National Adaptation Fund for Climatc Change (|{AFCC) to meet
the cost ofadaptation and miligation to climate change.
k. Any other fund allocated to the state for adaptation, mitigation supporl and development olRE and
EE Projects lrom time to time.
Note: Minimum oJ 50 % of the funds requirad for encourctging implementqtion oftargets identified under
this policy for development of kE ond Starqge projecls, skill development etc. will be created
withinfirst quurter ofeveryfinancial year. The yea y targets and respeclive fund requh'entent t,ill
be produced by BfuEDI befiire the llihar Renewqble Energt Development Fttnd Committee
considering lhe obove timelines.
25.3 Fund Utilization Areas
BRDF will be utilized for meeting the following altributes:
a. Establishment support to BREDA and other Nodal Agenoy nominated by Energy Department
b. The upfront charges involved fbr the developmcnt of infrastructure for lacilitating the deployment of
utility scale/distributed RE projects like solar parks, manufacturing zones, other common
infiastructure facilities etc.
c. Development ofevacuation infrastructure for facilitating the installation ofdistributed RE projects.
d. Creation of skill development centers and olganizing capacity building & training sessions lor
skilled rvorkforcc development in the state.
e. Creation of Research and Development (R&D) centcrs and labs for exploring new tcchnology areas
through research and standardized existing techrologies through certification ofRE components like
solar PV modules, invcders, solar pumps etc.
f. Innovation, lncubation and R&D suppo to the startups working in the field of renewable energy,
clean, sustainability and rclated aspects fbr solving state centric challenges.
g. Any other support to the state to facilitate meeting the objectives olthis policy.
25.4 Mode of Fund Utilization and Monitoring:
a. BREDA will undertake a detailed assessmenl of the support rcquired for encouraging
irnplementation ol targets identificd under this polioy lor implementation of RE projects, skill
development, starlup promotion etc. and submit the fund requiremcnts for its consideration before
the State/central Government for budgetary support or to the Energy Depaltment, Govt. of Bihar.
BHpC rvill submit the similar proposal for.fund requirement for hydro power projects to BREDA.
b. Bihar Renewable Encrgy Development Fund Committee (BREDFC) will approve the required fund
to be utilized under different proiects. The BREDFC will meet in every quader to track the progress
of fund utilization and take necessary decisions on ploject approvals. The committee will comprise
olfollowing mcmbers:
i S."r.La.y lprincipal Secretary, Energy Chairperson
ii. Director - BREDA Member &
Convcner
iii. Managing Director - IIIJPC Member &
Convener
ir. Mo*gine Director - NBPDCL or their Represcntative Mcmber
.. tl,tunaging Director - SBPDCL or their Representative Member
* Marr.crnS Director - BSPTCI. o, th"tt R"p..r.rtoti
uil. tllan'aeins Direclor - BSI'GCL or th.i, R.prylgntuti*
-
!!!!lll!9!
"iii-S""reta.y.
Department of Industti"t, Gort. of Bihu. M'
*-S**trry, L-rd, Revenue & n"tr. O"pu.t-.,t, .
Bihar Renervable Encrgy Policy 2025 23
Reprcscntative
x. l').C.C.F, Forcst Department. or its Rcpresentative Member
xi. Secrctary, Water Resource Dcpartment, or its Represcntalive Mernber
xii. Secretary, Department of Co-opcrative, or its llepresentativc Member
26 Governance
Based on the capacity, different levels for approval ollhe projects will constitute a Bihar State Technical
Approval Comn.rittee (SLEC/SLSC/DLSC), the constitution of the committee and their respective role
will be as below:
26.1 District Level Screening Con.rmittee (DLSC)
a. f-ol providing required approvals ofprojects ofcapacif less than I MW at a single location, DLSC
will be constituted under the chairmanship of District Magistratc/Deputy Development
commissioner (DDC)olthe concerned district.
b. To resolve problems in implelnentation of this Policy at district level and for promotion and
publicity of this policy.
c. Thc DLSC will meet at least once in every month to track the progress and take decisions on
project approvals and review pendency.
d. The committee will constitute of the followins members:
i.) District Magistrate/ DDC of the concerned district Chairpcrson
ii) Superintending Engineer (Distribution), Concerned Member & Convener
Circle
iii) Concerned Superintending Engineer (Transmission) Mernber & Convener
ii) Supcrintcnding Engineer (Department of Water Mcmber
Resource), Concerned Division
v) Representative, Departrnent ofRevenue and Land Member
Reforms
vi) General Manager, District Industries Centre (DIC), or Member
their Representative
26.2 State Level Screening Committee (SLSC)
a. For approvals ofprojects ofcapacity of 1 MW and above but less than 50 MW at a single location,
a SLSC will be constituted under thc chairmanship ol Principal Secretary / Secretary, Department
of Energy, Govt. olBihar.
b. The SLSC will meet at least once in cvcry Bi-monlhly to track the progress and take decisions on
ploject approvals and review pendency ofall RE projects along with district level projects.
c. BREDA may submit the progress report olall RL projects to thc SLSC on halfyearly basis.
d. The committee will constitute of the followins mcmbcrs:
i.)Sccretary/PrincipalSecretary,DepartmentofEnergy Chairperson
ii) Director, BREDA Member &
Convener
iii) Managing Director - NBPDCL and SBPDCL or their Member
Representative
iv) Managing Director - Bihar State Power Transmission Member
Corporation Ltd. (BSP'l'CL) or their Representative
v) Secretary, Department of Revenue and Land Reforms or their Member
Representative
vi) Secretary. Department oflndustries, or their Representative Mcmber
Bihar Renewable Energy Policy 2025 24
vii) Principal Chief Conservator of Forests (I'CCF). Department of Member
Forest, Environment and Climate Change or their Representative
viii) Secretary, Department of Water Resourcc, or thcir Member
Representati
ix) President BIA or its representative Member
26.3 State Level En.rpowered Committee (SLEC)
a. Io resolve key bottlenecks in implementation of this policy and resolve any other Inter
departmental issues that may arise from time to time, High level committee will be constituted
under the chaiflnanship olthe Chief Secretary oflhc State.
b. For approval of projccts equal to 50 MW and above at a single looation or to undertake any
strategic decision other than approval related 10 RE targets ofthe state, a SLEC will be constituted
under the chairmanship ofthe Chief Secretary ofthe State.
c. The SLEC will n.reet quarterly to monilor the progress and take decisions in case ofany ambiguity,
dispute, dilference, or issue in irr.tplementation of thc policy. BREDA will submit the progress
report ofall RE projects in the state to the SLEC on halfyearly basis.
d. The cornmittee will constitute of the following nembers:
i) Chief Secretary - Government of Bihar Chairperson
ii) Secretary /Principal Secretary, Departnrent of Energy Member &
Convener
iii) Secrctary /Principal Secretary, Dcpartment of Planning and Member
Der c loprnent. CoB
iv) Secretary/ Principal Secretary, Dcpartment ofRevenue and Member
Land Rcfbrms, GoB
v)Secretary/Principalsccretary,l)epartmentofEnvironment, Member
Forest & Clin.rate Change, GoB
vi) Secretary/ Principal Sccretary, Departrr.rent of Industries, GoB Membcr
vii) Secretary, Department of Water Rcsource, GoB Member
viii) Secretary /Principal Secretary, Department ofFinance, GoB Member
ix) President, BIA Member
27 Review ofPolicy
State Government may undertake review of this policy on ycarly basis under the chaimanship of Chiel
Secretary, Governmcnt of Bihar after a pcriod of one year or aS and when need arises in view of any
technological breakthrough or to remove any inconsistency with Electdciry Act 2003, rules and
regulations ma<le there under or unrler any Govenrment of lndia policy. The policy review committee will
comprise of all the relevant deparlments ot this policy, Retrospeclive amendments to ths incentives
available under this policy will be avoided for ensuring investor confidence in the State and in the sector.
28 RelevantDepartments
All concerned depafiments and organizalions will issue follow up notifications within two months to give
effbct to thc proyisions oftbis policy. The concerned departments are listed below:
a. DepafimentofAgriculture,
b. l)cpartment ofAnimal & Fisheries Resource Depafiment
c. Department of Co-oPerative
Bihar Renervable Energy Policy 2025 25
d. Depaftment of Commercial Taxcs
e. Department ofEnergy
f. Department ofEnvironmcnt, Forest & Clin.rate Change Depadment
g. Deparlment of Industries
h. Department ofMines and Geology
i. Deparlmcnt ofPlanning & Development
j. DepartmentofFinance
k. Department ofRcvcnuc and Land Refonns Depafiment
l. Department ofRural Development
m. Development of Urban Development & Housillg
n. Depaftment of Water Resources
o. DepartmentofTransport
p. State Pollution Control Board
29 Polver to Rcmove Difficulties
lfthere is any ambiguity, dispute, difference, or issue arises in regard to interpretation/ i[.rplen.rentation of
this Policy, State Level Empowered Committee may take decision in such matters, not inconsistent witl')
the provisions ol the Policy, as may appcar to be necessary and expedient for removing the difficulties
either on its own or after hearing those pafties who have represented lor changc in any provision.
30 lmplemenlationGuidelines/Framework
BREDA will issue implantation guidelines or framework in consultation with the concerned department
for different technology area considering the state centdc pammeters and applicability. These guidelines
or liamervork will clearly describe the technology area, role, and responsibilily of all the stakeholders'
involved, targeted capacity and timclincs lor achieving the same. Following guidelines or lramework will
be folmulatcd lor achieving the objectives olthe policy:
S.No. Guidelines Release duration
(after date of
launch of this
policv)
Concerned
Department
I Micro-Mini Grid Project Implementation
Guidelines
Within 3 months BREDA,
Discoms
2 Guidelines for installation of Rooftop Solar
Proiects
Within 3 months BREDA,
Discoms
3 Solar Power Projects Implementation
Guidelines (Non-Rooftop)
Within 3 months BREDA,
BSPGCL
4 Guidelines for developrnent of Biomass and
Wastc to Energy/Green Ilydrogen Projects
Within 5 months BREDA
5 Hydel Power Projects Implementation
Guidelines
Within 3 months BLIPC
6 Guidelines for Implementation of Solar Pumps
and solarization of agriculturc fccders
Withirr 3 rronths BREDA
1 Hvbrid RE Proiects Implementation Guidelines Within 6 months BII.EDA
8 Fund Management and Renewable Energy
Financing Guidelines
Within 3 months BREDA
9 Guidclines for development of Green
Villaee/City/District
Within 6 months BREDA
Bihar Renervable Energy Policy 2025 26
10 Guidelines for Geothermal Projcct
Implementation
Within 6 months BREDA,
BSPGCL
1l Guidelines for development ofPumped Storage
Proiects
Within 6 rnonths BSPGCL
/BHPC
t2 Guidelines for Innovation Hub fcrr
challenges,Nove I Tcchnologies and Capacity
Building
Within 6 nronths BREDA
Note: -B,REDI being the state nodql agency will devektp the abore guidelines in consultation with the
concerned deparh e t, BREDI nay engqge ct y .tdditional entity resource/dot ain
experts/consultqnts (if required) for developing the aboye guidelines in line with the aboye
linelines. Futld required for lhis purytse will be borne through Bihar Re ewable Energt
Development Fund or Energy- Department on priority basis.
Order: - Ordcred to bc publish in thc coming cxlras ordinary issue of Bihar Gazette for information to all.
Memono.e02l sr srqRqRr ffi rrlzooa(cis)- 323?
Mcmo no. qo2li€T sqrqR-m ffi rr /zooa(Eis) - 3 L)?
(Manoj Kumar Singh)
Sccrctary, Govt. of Bihar
Prrna, dared /O' 07' 2 ezf
Secretary, Govt. of Bihar
/Palna,dated I 0, 62,2-4Lr^
Copy forwarded to Officer-in-Charge, E-Gazette Cell, Finance Depaxtment, Bihar, Patna for
publication ofBihar Gazette (through IT Manager, Energy Department, Bihar, Patna). He is requested to
kindly provide 200 (two hundred) copies ofthe published gazette to Energy Deparhnent, Bihar, Patna.
-rwtrlW
Copy lorwarded to Secretary, Ministry of Power, Goverrunent of lndia, New Delhi/Secretary,
Ministry ofNew and Renewable Energy, Govcrnrnent of India, New Delhi 1br inforrnation and necessary
action.
-'&rld
Merno no. eo2lisr sTqrwRo ffi-rr /zoos(Eis)- 3 > ) 7
Copy forwarded to Accountant General (Accounls & Entitlement), Bihar Veerchand Patel Path,
Patna lor inlormalion and necessaly action.
-,rntIlvN
Secretary, Govt. of Bihar
Secretary, Govt. of Bihar
/Parna, dated | 0 , o), >o t4-
Bv the order ofCovernor of
Bihar Renelvable Iinergy Policy 2025 27
Memono.e02li€T 3lcncfud ffi tTzooo(vs) 3231 /Patna, dated 10.07 >414-
Copy lorrvarded to Principal Secretary to Governor/Principal Secretary to Hon'ble Chief Minister,
Bihar, Patna,/Principal Priyate Secretary to Hon'ble Minister, Energy Department/Principal Private
Secretary to Chief Secrctary, Bihar/ Additional Chief Secretary/Prini;ipal Secretary/Secretary, All
Dcparlmerts. Bihar, Patna/Ail Depaftment Heads, Bihar', Patna/Joint Secretary, Energy Department,
Bihar, Patna/Deputy Secretary, Energy Deparlment, Bihar, Patna./ Chairman-cum-Managing Director,
Bihar Statc Powcr (Holding) Company Ltd., Patna /Managing Diroctor, North Bihar Power Distribution
Conrpany Ltd. Patna./ Managing Director, South Bihar Power Distribution Company Ltd. Patna-/
Managing Director', Bihar Slate Po\yer Transmission Cornpany Ltd. Patna./ Managing Director, Bihar
Stale Porver Generation Company Ltd., Patna,/Managing Director, Bihar State Hydroelectric Power
Corporation, Patna,/Director, BREDA, Vidyul Bhawan-ll, Patna and IT Manager, Energy Deparhnent,
Bihar, Patna lor inlormation and necessaty action.
*,r"\firw"d
Secretary, Govt. of Bihar
Bihar Renewable Energy Policy 2025