Form LXXI.
Form LXXI.
138. A register of muster rolls and measurement book shall be maintained in
form LXIII and LXIV by the Gram Panchayat, Panchayat Samiti or Zila Parishad, Deputy
Chief Executive Officer of Zila Parishad and Executive Engineer who will also issue them
strictly according to requirements and of the work approved by competent authority.
139. After the completion of the work of every kind or nature, an assessment
and completion report shall be submitted to the authority competent to grant
administrative approval, with a comple copy to concerned Gram Panchayat, Panchayat
Samiti or Zila Parishad, as the case may be, in the Form LXV. The competency of
theperson authorised to submit assessment and completion report is given in Schedule
‘D’.
140. All the electrical works at Gram Panchayat, Panchayat Samiti and Zila
Parishad level shall be carried out with the consultation or approval of electrical wing of
Panchayati Raj Department and also as per instructions issued by the Government from
time to time. All maintenance works at all level shall also be carried out by the Electrical
Wing of Panchayati Raj Department Strictly.
141. Payment for work shall be made by meansof:-
(a) first and final bill in Form LXVI in all cases when a single
payment is to be made on completion of a work or supplies made
or.
(b) a running bill in Form LXVII where payment is to be made during
the progress of a work for the work executed or material supplied;
such payment being strictly considered as payment on account and
will not in any case mean final acceptance of such work or;
(c) a final bill in Form LXVIII when final payment is to be made in
respect of a work or the supply of material completed, payments in
respect of which have previously been made on running bills or.
(d) hand receipt in Form LXIX which is simple form of voucher
intended to be used for all miscellaneous payments for which none
of the forms referred to in clauses (a), (b) and (c) is used.
Preparation of
bills for works
Section 209.
Electrical works
Section 209.
Assessment and
completion report
Section 209.
Maintenance of
registers of muster
roll and
measurement book
Section 209.
Measurement
books Section 209.
53
142. When a contractor is enable to complete the work according to the
agreement for reasons beyond his control, the time limit provided in the agreement may
be extended by the Gram Panchayat, Panchayat Samiti or Zila Parishad, as the case may
be, on an application by the contractor within twenty days of the date on which hindrance
or difficulty has arisen.
143. The account relating to contractors shall be kept in the contractor ledger in
Form LXX separate page or set up pages being reserved for all the transactions with each
contractor. The ledger accounts shall be closed balanced monthly.
144. In case of doubt with regard to the provisions made in this chapter with
regard to matters for which no provisions has been made in these rules provisions made in
Public Works Department Code, Government of Haryana shall be followed.
145. The Punjab Panchayat Samitis Taxation and Fees Rules, 1963, the Punjab
Panchayat Samtitis and Zila Parishads Services Rules, 1965, the Punjab Panchayat
Samitis and Zila Parishads Services (Travelling Allowances and Honoraria) Rules, 1964,
the Punjab Panchayat Samiti and Zila Parishads Servants(Punishment and Appeal) Rules,
1964, the Punjab Zila Parishads (Power and Function) of Secretaries Rules 1952 1[ the
Punjab Panchayat Samitis and Zila Parishads, Non-official Members Payment of
Allowances Rules, 1965] and Punjab Panchayat Samiti and Zila Parishads (General)
Financial, Budget, Accounts and Audit Rules, 1964, in their application to the State of
Haryana are hereby repealed:
Provided that anything done or any action taken under the rules so repealed shall
be deemed to have been done or taken under the corresponding provisions of these rules
to the extent it is not inconsistent with the provisions of these rules.
2[146. Any general guidelines relating to execution of development works issued
by the State Government or by Public Works Department shall be followed.
147. The Junior Engineer/ Sub Divisional Engineer/ Executive Engineer concerned
shall be responsible for quality and quantity for all works executed through tender; which
shall be shared in the ratio of 80:20 by technical wing (Junior Engineer/Sub Divisional
Engineer/Executive Engineer) and Drawing and Disbursing Officer of the Panchayati Raj
Institutions (Gram Panchayat/Panchayati Samiti/Zila Parishad) concerned. The works that
are executed by the Gram Panchayat or Panchayat Samiti or Zila Parishad without
tendering process, the Drawing and Disbursing Officer of the Panchayati Raj Institution
concerned, who is releasing the payment of work shall be responsible in addition to the
technical authority concerned and responsibility shall be shared in the ratio of 80:20
respectively i.e. 80% for the Drawing and Disbursing Officer of Panchayati Raj
Institutions (Gram Panchayat/Panchayati Samiti/Zila Parishad) and 20% for the technical
wing (Junior Engineer/Sub Divisional Engineer/Executive Engineer).
148. The Block Development and Panchayat Officer concerned in case of works
being executed by Gram Panchayat and Panchayat Samiti and the Chief Executive Officer
1 Inserted vide notification No. GSR 72/HA 11-94/S 209/2000 dt. 29.09.1997.
2 Added vide notification no. S.O. 21 / H.A. 11 / 1994 / S. 209 / 2023 dated 09.05.2023.
Repeal
Saving clause
Section 209.
Account Record
Section 209.
Extention in time
limit.Section 209.
General
guidelines.
section 209.
Responsibili
ty for
quality and
quantity.
section 209..
Review of
progress and
report
thereof.
section 209.
54
in case of works being executed by Zila Parishad or Executive Engineer shall review the
progress of all development works every month. The Block Development and Panchayat
Officer shall submit such report to the Chief Executive Officer who shall submit a
compiled monthly report of the district to the Director.
149. The building construction material for which rate contract has not been done
by the Government, a committee headed by the Deputy Commissioner and consisting of
the Chief Executive Officer, District Development and Panchayat Officer and Executive
Engineer, shall fix the rates for various materials block-wise and shall review the rates
after every six months keeping in view the rates prevailing in the market. At the time of
fixation of rates, competitive rates shall be explored through e-tendering process.
150. (1) In respect of any development work, no payment shall be made by any
executing agency either in advance or without due technical verification by the competent
authority.
(2) The Deputy Commissioner, Superintending Engineer, Additional Deputy
Commissioner, Chief Executive Officer, Executive Engineer, 1[Sub Divisional Engineer]
(Civil), District Development and Panchayat Officer and Block Development and
Panchayat Officer, shall mandatorily inspect the development works at least to the extent
1%, 1%, 2%, 5%, 5%, 5%, 5% and 10% of the total works in their jurisdiction
respectively.
(3) The Gram Sachiv shall submit a monthly report of all the income and
expenditure done by the Gram Panchayat to the Social Education and Panchayat Officer
who shall submit the same to the Block Development and Panchayat Officer. The Social
Education and Panchayat Officer shall regularly inspect the records of all Gram
Panchayats and shall ensure that there is no unauthorized withdrawal by the Gram
Panchayat and all such cases shall be reported in writing to the Block Development and
Panchayat Officer concerned immediately who shall take action against the delinquents.
(4) In case any Gram Panchayat, Panchayat Samiti or Zila Parishad or Executive
Engineer utilizes the fund for any work other than sanctioned work, the Drawing and
Disbursing Officer of Gram Panchayat, Panchayat Samiti, Zila Parishad or Executive
Engineer concerned and Technical authority verifying the work, shall be held responsible.
(5) The Gram Panchayat, Panchayat Samiti, Zila Parishad or Executive Engineer
concerned being the executing agency shall prepare and furnish the Utilization Certificate
within fifteen days of the completion of the work undertaken to the Director through Chief
Executive Officer.
(6) In case of works being executed by Gram Panchayat or Panchayat Samiti, half
of the estimated contingency shall be transferred to the contingent account of Block
Development and Panchayat Officer. The contingent amount so transferred may be used
by the Block Development and Panchayat Officer or Sub-Divisional Engineer for
expenses such as tender process, stationery, hiring charges for vehicles and other
unforeseen expenses. The balance 50% contingencies shall be retained by the executing
agency with them to defray any other expenses.]
1 Substituted vide notification no. S.O. 21 / H.A. 11 / 1994 / S. 209 / 2023 dated 09.05.2023.
Fixation of
rates of
material.
section 209.
Inspection
and
verification
of works.
section 209.
55
1[“SCHEDULE ‘A’
[(see rule 131, 132 and 134]
Authorities Competent to give (a) Administrative Approval
(b) Technical Sanction
Sr.
No.
Nature and
value of work
Works Being
Executed from
Gram Panchayat
Fund
Works Being
Executed from
Panchayat Samiti
Fund
Works Being Executed
from Zila Parishad
Fund
Works Being
Executed from State
Government Fund
Administ
rative.
approval
by
Technica
l
sanction
by
Administ
rative
approval
by
Technica
l
sanction
by
Administra
tive
Approval
by
Technical
sanction
by
Administr
ative.
approval
by
Technical
sanction
by
1 2 3 4 5 6 7 8 9 10
A. Original Works Rs. :-
1. Without any
capping for
administrative
approval from
their own fund
as well as
grant-in-aid
Gram
Panchayat
1. Junior
Engineer
upto
Rs.2.00
lakh
2. Sub
Division
al
Engineer
above
Rs.2.00
lakh and
upto Rs.
25.00
lakh
3.
Executiv
e
Engineer
above
Rs.25.00
lakh and
upto Rs.
1.00 Cr
4.
Superint
ending
Engineer
above
Rs.1.00
Cr and
upto
Rs.2.50
Cr
5. Chief
Engineer
Panchaya
t Samiti
1. Junior
Engineer
upto
Rs.2.00
lakh
2. Sub
Divisional
Engineer
above
Rs.2.00
lakh and
upto Rs.
25.00 lakh
3.
Executive
Engineer
above
Rs.25.00
lakh and
upto Rs.
1.00 Cr
4.
Superinte
nding
Engineer
above
Rs.1.00
Cr and
upto
Rs.2.50
Cr
Zila
Parishad
1. Junior
Engineer
upto
Rs.2.00
lakh
2. Sub
Divisional
Engineer
above
Rs.2.00
lakh and
upto Rs.
25.00 lakh
3.
Executive
Engineer
above
Rs.25.00
lakh and
upto Rs.
1.00 Cr
4.
Superinten
ding
Engineer
above
Rs.1.00 Cr
and upto
Rs.2.50 Cr
5. Chief
Engineer
1.Develo
pment
and
Panchayat
s Minister
upto
Rs.10.00
Cr
2. Chief
Minister
above Rs.
10.00 Cr
1. Junior
Engineer
upto
Rs.2.00
lakh
2. Sub
Divisiona
l
Engineer
above
Rs.2.00
lakh and
upto Rs.
25.00
lakh
3.
Executive
Engineer
above
Rs.25.00
lakh and
upto Rs.
1.00 Cr
4.
Superinte
nding
Engineer
above
Rs.1.00
Cr and
upto
Rs.2.50
Cr
5. Chief
Engineer
1 Added vide notification no. S.O. 21 / H.A. 11 / 1994 / S. 209 / 2023 dated 09.05.2023.
56
Authorities Competent to give (a) Administrative Approval
(b) Technical Sanction
Sr.
No.
Nature and
value of work
Works Being
Executed from
Gram Panchayat
Fund
Works Being
Executed from
Panchayat Samiti
Fund
Works Being Executed
from Zila Parishad
Fund
Works Being
Executed from State
Government Fund
Administ
rative.
approval
by
Technica
l
sanction
by
Administ
rative
approval
by
Technica
l
sanction
by
Administra
tive
Approval
by
Technical
sanction
by
Administr
ative.
approval
by
Technical
sanction
by
1 2 3 4 5 6 7 8 9 10
exceedin
g
Rs.2.50
Cr
5. Chief
Engineer
exceeding
Rs.2.50
Cr.
exceeding
Rs.2.50 Cr
exceedin
g
Rs.2.50
Cr
B. Repairs and Maintenance
1 Without any
capping for
administrative
approval from
their Own
funds as well
as grant-in-aid
Gram
Panchay
at
1. Junior
Engineer
upto
Rs.20,00
0
2. Sub
Division
al
Engineer
above
Rs.20,00
0 & upto
Rs.
10.00
lakh
3.
Executiv
e
Engineer
above
Rs.10.00
lakh and
upto Rs.
25.00
Lakh
4.
Superint
ending
Panchaya
t Samiti
1. Junior
Engineer
upto
Rs.20,00
0
2. Sub
Division
al
Engineer
above
Rs.20,00
0 and
upto Rs.
10.00
lakh
3.
Executiv
e
Engineer
above
Rs.10.00
lakh and
upto Rs.
25.00
Lakh
4.
Superinte
nding
Zila
Parishad
1. Junior
Engineer
upto
Rs.20,000
2. Sub
Divisional
Engineer
above
Rs.20,000
and upto
Rs. 10.00
lakh
3.
Executive
Engineer
above
Rs.10.00
lakh and
upto Rs.
25.00
Lakh
4.
Superinten
1.Chief
Executive
Officeer
(Zila
Parishad)
upto Rs.
2.00 lakh
in case of
streets
and other
than
streets
Rs.10.00
lakh
2.Director
above Rs.
2.00 lakh
& upto
Rs.25.00
lakh in
case of
streets
and above
Rs.10.00
lakh &
upto
Rs.25.00
lakh other
than
streets
3.
Administr
ative
Secretary
above Rs.
25.00
lakh and
upto
Rs.50.00
Lakh
4.
Develop
ment &
1. Junior
Engineer
upto
Rs.20,00
0
2. Sub
Divisiona
l
Engineer
above
Rs.20,00
0 and
upto Rs.
10.00
lakh
3.
Executive
Engineer
above
Rs.10.00
lakh and
upto Rs.
25.00
Lakh
4.
57
Authorities Competent to give (a) Administrative Approval
(b) Technical Sanction
Sr.
No.
Nature and
value of work
Works Being
Executed from
Gram Panchayat
Fund
Works Being
Executed from
Panchayat Samiti
Fund
Works Being Executed
from Zila Parishad
Fund
Works Being
Executed from State
Government Fund
Administ
rative.
approval
by
Technica
l
sanction
by
Administ
rative
approval
by
Technica
l
sanction
by
Administra
tive
Approval
by
Technical
sanction
by
Administr
ative.
approval
by
Technical
sanction
by
1 2 3 4 5 6 7 8 9 10
Engineer
above
Rs.25.00
Lakh
and upto
Rs.1.00
Cr
5. Chief
Engineer
exceedin
g
Rs.1.00
Cr
Engineer
above
Rs.25.00
Lakh and
upto
Rs.1.00
Cr
5. Chief
Engineer
exceedin
g
Rs.1.00
Cr
ding
Engineer
above
Rs.25.00
Lakh and
upto
Rs.1.00 Cr
5. Chief
Engineer
exceeding
Rs.1.00 Cr
Panchayat
s Minister
above Rs.
50.00
Lakh and
upto Rs.
2.00 Cr
5. Chief
Minister
above Rs.
2.00 Cr
Superinte
nding
Engineer
above
Rs.25.00
Lakh and
upto
Rs.1.00
Cr
5. Chief
Engineer
exceedin
g
Rs.1.00
Cr
“SCHEDULE ‘B’
CALLING AND ACCEPTANCE OF TENDERS
[(see rule 134 and 135]
Sr
No.
Costing
of
original
works/re
pair
works
Authority
to prepare
Notice
Inviting
Quotation/
Notice
Inviting
Tender
Authority
to
Approve
Notice
Inviting
Quotation/
Notice
Inviting
Tender
Authority
to call
tenders/qu
otation
Authorit
y to
accept
quotatio
n/tenders
Conditions of
acceptance if any
Authorit
y to
execute
works
orders/
agreemen
t
Remar
ks
1 2 3 4 5 6 7 8 9
1 Up to
Rs.25 lakh
/ upto Rs.
2.50 lakh
(Gram
Fund/
Samiti
Fund/ Zila
Parishad
Fund)
Junior
Engineer
Sub
Divisional
Engineer
Sub
Divisional
Engineer
(In case of
quotation
of the work
costing
upto
Rs.5.00
lakh,
Sarpanch
or
(Chairman
and
Executive
Officer) or
(President
and Chief
Executive
Officer)
Sub
Divisiona
l
Engineer
in
concurren
ce of
Sarpanch
of Gram
Panchaya
t or
Chairman
of
panchaya
t Samiti
or
President
of Zila
Parishada
s the case
may be.
In case, rates exceed
upto five percent of
Haryana Schedule
of Rates plus
sanctioned zonal
premium, then Sub
Divisional Engineer
shall approve the
rates in concurrence
of Sarpanch or
Chairman or
President, as the
case may be. If the
rates exceed above
five percent and
upto ten percent of
Haryana Schedule
of Rates plus
sanctioned zonal
premium, the
Executive Engineer
Sub
Divisional
Engineer
and
{Sarpanc
h or
(Chairma
n and
Executive
Officer)
or
(President
and Chief
Executive
Officer)},
as the
case may
be,
jointly.
Estimat
e should
be
technica
lly
sanction
ed
58
Sr
No.
Costing
of
original
works/re
pair
works
Authority
to prepare
Notice
Inviting
Quotation/
Notice
Inviting
Tender
Authority
to
Approve
Notice
Inviting
Quotation/
Notice
Inviting
Tender
Authority
to call
tenders/qu
otation
Authorit
y to
accept
quotatio
n/tenders
Conditions of
acceptance if any
Authorit
y to
execute
works
orders/
agreemen
t
Remar
ks
1 2 3 4 5 6 7 8 9
shall approve the
rates in concurrence
of Sarpanch of
Gram Panchayat or
Chairman of
Panchayat Samiti or
President of Zila
Parishad as the case
may be.
If the rates exceed
above ten percent of
Haryana Schedule
of Rates plus
sanctioned zonal
premium, the
Superintending
Engineer shall
approve the rates in
concurrence of
Sarpanch or
Chairman or
President, as the
case may be.
2 Above Rs.
25lakh
and up to
2.50 Cr/
above Rs.
2.50 lakh
and upto
Rs. 25.00
lakh
(Gram
Fund/
Samiti
Fund/ Zila
Parishad
Fund)
1. Sub
Divisional
Engineer
upto
Rs.1.00 Cr.
2.
Executive
Engineer
above
Rs.1.00 Cr.
and upto
Rs.2.50 Cr.
1.
Executive
Engineer
upto
Rs.1.00 Cr.
2.
Superinten
ding
Engineer
above
Rs.1.00 Cr.
and upto
Rs.2.50 Cr.
Executive
Engineer
Executive
Engineer
concurren
ce of
Sarpanch
of Gram
Panchaya
t or
Chairman
of
panchaya
t Samiti
or
President
of Zila
Parishad
as the
case may
be.
In case, rates exceed
upto five percent of
Haryana Schedule
of Rates plus
sanctioned zonal
premium, then
Executive Engineer
shall approve the
rates in concurrence
of Sarpanch or
Chairman or
President, as the
case may be. If the
rates exceed above
five percent and
upto ten percent of
Haryana Schedule
of Rates plus
sanctioned zonal
premium, the
Superintending
Engineer shall
approve the rates in
concurrence of
Sarpanch or
Chairman or
President, as the
case may be.
If the rates exceed
Executive
Engineer
and
{Sarpanc
h or
(Chairma
n and
Executive
Officer)
or
(President
and Chief
Executive
Officer)},
as the
case may
be,
jointly.
Estimat
e should
be
technica
lly
sanction
ed
59
Sr
No.
Costing
of
original
works/re
pair
works
Authority
to prepare
Notice
Inviting
Quotation/
Notice
Inviting
Tender
Authority
to
Approve
Notice
Inviting
Quotation/
Notice
Inviting
Tender
Authority
to call
tenders/qu
otation
Authorit
y to
accept
quotatio
n/tenders
Conditions of
acceptance if any
Authorit
y to
execute
works
orders/
agreemen
t
Remar
ks
1 2 3 4 5 6 7 8 9
above ten percent of
Haryana Schedule
of Rates plus
sanctioned zonal
premium, the Chief
Engineer shall
approve the rates in
concurrence of
Sarpanch or
Chairman or
President, as the
case may be.
3 Above Rs.
2.5 Cr
/above Rs.
25.00 lakh
(Gram
Fund/
Samiti
Fund/ Zila
Parishad
Fund )
Executive
Engineer
Superinten
ding
Engineer
Executive
Engineer
Executive
Engineer
concurren
ce of
Sarpanch
of Gram
Panchaya
t or
Chairman
of
panchaya
t Samiti
or
President
of Zila
Parishad
as the
case may
be.
In case, rates exceed
upto five percent of
Haryana Schedule
of Rates plus
sanctioned zonal
premium, then
Superintending
Engineer shall
approve the rates in
concurrence of
Sarpanch or
Chairman or
President, as the
case may be. If the
rates exceed above
five percent and
upto ten percent of
Haryana Schedule
of Rates plus
sanctioned zonal
premium, the Chief
Engineer shall
approve the rates in
concurrence of
Sarpanch or
Chairman or
President, as the
case may be.
Executive
Engineer
and
{Sarpanc
h or
(Chairma
n and
Executive
Officer)
or
(President
and Chief
Executive
Officer)},
as the
case may
be,
jointly.
Estimat
e shall
be
technica
lly
sanction
ed
4 Upto Rs.
25lakh/
Rs. 2.50
lakh
(Governm
ent Funds)
1. Sub
Divisional
Engineer
upto
Rs.1.00 Cr.
2.
Executive
1.
Executive
Engineer
upto
Rs.1.00 Cr.
2.
Superinten
Executive
Engineer
Executive
Engineer
In case, rates exceed
upto five percent of
Haryana Schedule
of Rates plus
sanctioned zonal
premium, then
Executive Engineer
shall approve the
rates.
If the rates exceed
above five percent
Sub
Divisional
Engineer
and
{Sarpanc
h or
(Chairma
n and
Executive
Officer)
or
(President
General
ly funds
shall be
allocate
d to
PRI,
funds
may be
allocate
d to
Executi
ve
60
Sr
No.
Costing
of
original
works/re
pair
works
Authority
to prepare
Notice
Inviting
Quotation/
Notice
Inviting
Tender
Authority
to
Approve
Notice
Inviting
Quotation/
Notice
Inviting
Tender
Authority
to call
tenders/qu
otation
Authorit
y to
accept
quotatio
n/tenders
Conditions of
acceptance if any
Authorit
y to
execute
works
orders/
agreemen
t
Remar
ks
1 2 3 4 5 6 7 8 9
Engineer
above
Rs.1.00 Cr.
and upto
Rs.2.50 Cr.
ding
Engineer
above
Rs.1.00 Cr.
and upto
Rs.2.50 Cr.
and upto ten percent
of Haryana
Schedule of Rates
plus sanctioned
zonal premium, the
Superintending
Engineer shall
approve the rates.
If the rates exceed
above ten percent of
Haryana Schedule
of Rates plus
sanctioned zonal
premium, the Chief
Engineer shall
approve the rates.
and Chief
Executive
Officer)},
as the
case may
be,
jointly.
Executive
Engineer
(in case of
departme
nt)
Enginee
r
(Pancha
yati
Raj)
also.
5 Above Rs.
25lakh &
upto 2.50
Cr/ above
Rs. 2.50
lakh and
upto Rs.
25.00 lakh
(Governm
ent Funds)
1. Sub
Divisional
Engineer
upto
Rs.1.00 Cr.
2.
Executive
Engineer
above
Rs.1.00 Cr.
and upto
Rs.2.50 Cr.
1.
Executive
Engineer
upto
Rs.1.00 Cr.
2.
Superinten
ding
Engineer
above
Rs.1.00 Cr.
and upto
Rs.2.50 Cr.
Executive
Engineer
Executive
Engineer
In case, rates exceed
upto five percent of
Haryana Schedule
of Rates plus
sanctioned zonal
premium, then
Executive Engineer
shall approve the
rates.
If the rates exceed
above five percent
and upto ten percent
of Haryana
Schedule of Rates
plus sanctioned
zonal premium, the
Superintending
Engineer shall
approve the rates.
If the rates exceed
above ten percent of
Haryana Schedule
of Rates plus
sanctioned zonal
premium, the Chief
Engineer shall
approve the rates.
Executive
Engineer
Funds
shall be
allocate
d
directly
to
Executi
ve
Enginee
r
(Pancha
yati
Raj)
6
Above Rs.
2.50 Cr
and upto
Rs. 5.00
Cr / above
Rs. 25.00
lakh and
Executive
Engineer
Chief
Engineer
Executive
Engineer
Executive
Engineer
In case, rates exceed
upto five percent of
Haryana Schedule
of Rates plus
sanctioned zonal
premium, then
Superintending
Executive
Engineer
Funds
shall be
allocate
d
directly
to
Executi
61
Sr
No.
Costing
of
original
works/re
pair
works
Authority
to prepare
Notice
Inviting
Quotation/
Notice
Inviting
Tender
Authority
to
Approve
Notice
Inviting
Quotation/
Notice
Inviting
Tender
Authority
to call
tenders/qu
otation
Authorit
y to
accept
quotatio
n/tenders
Conditions of
acceptance if any
Authorit
y to
execute
works
orders/
agreemen
t
Remar
ks
1 2 3 4 5 6 7 8 9
upto
Rs.50.00
lakh
(Governm
ent Funds)
Engineer shall
approve the rates.
If the rates exceed
above five percent
and upto ten percent
of Haryana
Schedule of Rates
plus sanctioned
zonal premium, the
Chief Engineer shall
approve the rates.
If the rates exceed
above ten percent of
Haryana Schedule
of Rates plus
sanctioned zonal
premium, the
Departmental
Works Committee
headed by
Development &
Panchayats Minister
and including
Administrative
Secretary and Chief
Engineer shall
approve the rates.
ve
Enginee
r
(Pancha
yati
Raj)
7
Above Rs.
5.00 Cr
and upto
Rs. 10.00
Cr / above
Rs. 50.00
lakh and
upto
Rs.1.00
Cr
(Governm
ent Funds)
Executive
Engineer
Chief
Engineer
Executive
Engineer
Executive
Engineer
Tender allotment
Committee headed
by Development &
Panchayats Minister
and including
Administrative
Secretary, Chief
Engineer and
representative of
Finance Department
not below the rank
of secretary shall
approve the rates.
Executive
Engineer
Funds
shall be
allocate
d
directly
to
Executi
ve
Enginee
r
(Pancha
yati
Raj)
8
Above Rs.
10.00 Cr /
above Rs.
1.00 Cr.
(Governm
Executive
Engineer
Chief
Engineer
Executive
Engineer
Executive
Engineer
Tender allotment
Committee headed
by Chief Minister,
Development &
Panchayats Minister
and including
Administrative
Secretary, Chief
Executive
Engineer
Funds
shall be
allocate
d
directly
to
Executi
ve
62
Sr
No.
Costing
of
original
works/re
pair
works
Authority
to prepare
Notice
Inviting
Quotation/
Notice
Inviting
Tender
Authority
to
Approve
Notice
Inviting
Quotation/
Notice
Inviting
Tender
Authority
to call
tenders/qu
otation
Authorit
y to
accept
quotatio
n/tenders
Conditions of
acceptance if any
Authorit
y to
execute
works
orders/
agreemen
t
Remar
ks
1 2 3 4 5 6 7 8 9
ent Funds)
Engineer, Engineer-
in-Chief, Publc
Works Department
(Building and
Roads) and
Administrative
Secretary of
Finance Department
shall approve the
rates.
Enginee
r
(Pancha
yati
Raj)
SCHEDULE ‘C’
[see rule 135(1)]
Manner of Calling Tenders for Allotment of Works
When a work is to be entrusted to a contractor, Sub Divisional Engineer or Executive Engineer or
Panchayati Raj Institutions through its representative Drawing and Disbursing Officer, as the case may be, shall call
Tenders. The Notice inviting Tender shall be approved by the authority indicated in schedule “B” and tenders should
be entered in tender register. The record of tender shall be maintained by the PRI (Gram Panchayat or Panchayat
Samiti or Zila Parishad) and one copy of such record for each work should be handed over to the Sub Divisional
Engineer or Executive Engineer concerned, as the case may be. Procedure of tendering shall be adhered to as per
government guidelines, issued from time to time.
Agreement
1. Works being executed through tender shall be let out on the basis of a written agreement.
2. Wide Publicity shall be given for the tenders by means of advertisement in the local popular newspapers as per
policy of the Government through Public Relations Department or otherwise. Besides, notices in English as well
as in the regional language, shall be displayed on public notice board including those fixed outside the office
rooms of the Zila Parishad, Panchayat Samiti, Gram Panchayat or Executive Engineer, as the case may be.
The Tenders notice shall in all cases state —
(i) The estimates, plans, Detailed Notice Inviting Tender and other documents can be seen by the contractor
online, ;
(ii) Cost of tender form and e servicing fees should be shown on tendering website, if any, thereof, ;
(iii) The date and time of opening of technical bids in case of tenders, ;
(iv) The amount of earnest money shall be paid online directly through Real Time Gross Settlement/National
Electronic Funds Transfer or OTC, ;
(v) The authority competent to accept/reject the tenders, ;
(vi) Time limit during which the work is required to be completed, ;
(vii) That Competent authority shall have the power to reject any one or all the tenders without assigning any
reason, ;
(viii) The common bid document for e-tendering as finalized by the Government from time to time through
Public Works Department or otherwise; shall be applicable.
Minimum Notice of Publicity
(a) Works up to Rs. 25.00 lakh: 7 working days.
(b) Works above Rs. 25.00 lakh but not exceeding Rs. 50.00 Lakh: 15 working days.
(c) Works above Rs. 50.00 Lakh: 21 working days.
(d) Above publicity period may be changed as directed by the Government.
63
Validity of calling of tenders
1. Bids shall remain valid for a period not less than 120 days or as fixed by Government, after the deadline
date for bid submission. A bid valid for a shorter period shall be rejected by the Executive Engineer by
treating it as non-responsive. In exceptional circumstances, prior to expiry of original time limit, the
employer may request that the bidder may extend the period of validity for a specified additional period.
2. In exceptional circumstances, prior to expiry of the original time limit, the Employer may request that the
bidders may extend the period of validity for a specified additional period. The request and the bidders
’responses shall be made in writing or by cable. A bidder may refuse the request without forfeiting his bid
security. A bidder agreeing to the request will not be required or permitted to modify his bid, but will be
required to extend the validity of his bid security for a period of the extension.
Opening of Tenders
The Sub Divisional Engineer or Executive Engineer, as the case may be, will follow the rules as laid down
in tender form/bid document or as prescribed by government from time to time.
SCHEDULE ‘D’
(see rule 139)
Competency of Assessment of Works.
Sr
No.
Competency of
officer/ official
Works up to
Remarks
Original Repair
1. Junior Engineer Rs 2,00,000/- Rs 20,000/-
Provided estimate is
technically sanctioned
2.
Sub Divisional
Engineer
Above Rs 2,00,000/-
but upto 25,00,000
Rs. 2,50,000/-
Provided estimate is
technically sanctioned
3. Executive Engineer Above Rs 25,00,000/- Above Rs. 2,50,000/-
Provided estimate is
technically sanctioned”.]
64
Previous and next
All provisions of The Haryana Panchayati Raj Finance, Budget, Account, Audit, Taxation, Rule 1996
Questions people ask
Is form LXXI of the Haryana Panchayati Raj Finance, Budget, Account, Audit, Taxation, Rule 1996 still in force?
No repeal of the Haryana Panchayati Raj Finance, Budget, Account, Audit, Taxation, Rule 1996 is recorded.