Rule 968, The Punjab Jail Manual 1996: (1) Public Works in jails are classified as follows
The Punjab Jail Manual 1996 - Rule 968
Text of rule 968
(1) Public Works in jails are classified as follows
968. (1) Public Works in jails are classified as follows:-
A- Original works:- Major works costing over
Rs.1,00,000/-
Works. Minor works costing over
Rs. 5,000/-
But not exceeding Rs.
1,00,000/-
Petty works costing Rs.
5,000/- or under.
B- Repairs Special
Periodical or Manual.
(2) "Original works" include all new constructions whether entirely new or
merely additions and alterations to existing buildings, all repairs to newly
purchased or previously abandoned buildings required to bring them into use
and substitutions of one kind of work or for another, e.g. a tiled or a thatched off.
(3) "Special repairs" include the complete renewal of a roof or floor and
repairs rendered necessary by storm, fire, flood or other unforeseen accident.
Special repairs estimates unlike other repair estimates do not lapse with the
official years, but remain current till the completion of the work, in the same way
as estimates for original works.
(4) "Periodical or annual repairs" comprise not only such work as painting
and white-washing but such miscellaneous repairs as it may be convenient to
carry out at the same time.
969. PROPOSALS FOR AN ORIGINAL MAJOR WORK
(1) Every proposal for a major work should be accompanied by -
(a) an explanation of the requirement;
(b) a brief statement of the general nature and extent of the work
proposed; and
(c) rough approximate estimate of the probable cost, and a rough pencil
sketch showing the chief dimensions of the work.
(2) The proposal should be submitted by the Inspector-General to the State
Government in the Civil Department for the order Government.
(3) The Executive Engineer may be called upon to report on any proposal for
an original major work and to state roughly the probable costs as required by
clause (1), but that officer should not be asked to prepare detailed drawings and
estimates, this can only be done under the orders of the State Government in the
Public Works Department.
970. DETAILS WHEN A MINOR WORK IS PROPOSED
When a minor work is proposed, the procedure for the preparation of
estimate will be the same as that for a major work. Superintendents of Jails may
ask officers of the Public Works Department for rough estimates of the cost of
every work they consider necessary and when these are received, submit them to
the Inspector-General for an allotment of funds. In the event of the Inspector-
General being prepared to make an allotment, he will communicate the fact to the
Superintending Engineer who will then order the preparation of the detailed
estimate.
NOTE - The Inspector-General is empowered to sanction expenditure up to Rs.
5,000 on all minor works, other than residential buildings appertaining to
Central and District Jails, and miscellaneous buildings of the Jail Department
under the minor head”27 Minor works 2056-Jails-101 jails/publics-01-
Central/02-District Jail (non-plan)”
971. DETAILS WHEN A MAJOR WORK IS PROPOSED
(1) Major works will ordinarily be proposed by the Superintendent who may
call upon the Public Works Department for rough approximate estimates of the
cost and on receipt, submit them to the Inspector-General who may then apply
for the administrative approval of the State Government in the Civil Department.
This approval being obtained, the Inspector-General will include the work in his
list of budget proposals and the Superintending Engineer or the State
Government in the Public Works Department on receipt of administrative
approval will issue orders for the preparation of the detailed plans and estimate.
(2) The detailed plans and estimate will be sent to the the preparation of the
detailed estimate.
NOTE - The Inspector-General is empowered to sanction expenditure up to Rs.
5,000 on all minor works, other than residential buildings appertaining to
Central and District Jails, and miscellaneous buildings of the Jail Department
under the minor head”27 Minor works 2056-Jails-101 jails/publics-01-
Central/02-District Jail (non-plan)”
971. DETAILS WHEN A MAJOR WORK IS PROPOSED
(1) Major works will ordinarily be proposed by the Superintendent who may
call upon the Public Works Department for rough approximate estimates of the
cost and on receipt, submit them to the Inspector-General who may then apply
for the administrative approval of the State Government in the Civil Department.
This approval being obtained, the Inspector-General will include the work in his
list of budget proposals and the Superintending Engineer or the State
Government in the Public Works Department on receipt of administrative
approval will issue orders for the preparation of the detailed plans and estimate.
(2) The detailed plans and estimate will be sent to the Superintendent for
countersignature and afterwards returned to the Executive Engineer who will
transmit them through the Superintending Engineer to the Inspector-General, for
the counter-signature and approval of these officers.
(3) The detailed plans and estimate will finally be forwarded by the Inspector-
General to the State Government in the Public Works Department through the
Chief Engineer, for sanction and allotment of funds.
972. PROCEDURE WHEN REPAIRS ARE REQUIRED.
(1) Estimates for repairs will be prepared by the officer of the Public Works
Department concerned who will be responsible for their propriety.
(2) Executive Engineers in-charge of Divisions, in the Buildings and Roads
Branch, are empowered to sanction expenditure on ordinary (annual, periodical
and petty) repairs within the limits of the sanctioned stereotyped estimates and
the budget allotment placed at their disposal by Superintending Engineers.
(3) The necessary financial control by Superintending Engineers over the
expenditure proposed to the incurred on annual repairs is to exercise at the time
of preparing Part II of the budged.
NOTE:- The responsibility for the efficient maintenance of work should be
impressed upon Executive Engineers from the beginning and they should be
allowed as free a hand as possible subject to financial regularity.
NOTE:- All expenditure on pretty construction and repairs is charged to the
Public Works Department Budget.
973 MATTER CONCERNING WORKS GENERALLY.
(1) Nothing in this chapter is to be construed into a permission to any officer
to carry out in portion any system of works or alterations of which the costs in
the aggregate would exceed what he is empowered to sanction.
(2) No material alterations or additions to a building may be made without the
approval of Superintending Engineer nor may any building be dismantled or new
building constructed without permission obtained from or through him as the
case may be.
(3) No work may be commenced till sanction to it has been accorded and
allotment of funds made and orders for its commencement issued by competent
authority. In emergent cases of danger of inconvenience suddenly arising, a
definite written request must be made to the Executive Engineer who will act on
his own responsibility.
974. CONVICT LABOUR. DETAILS TO BE OBSERVED IN THE EXECUTION OF
WORKS.
(1) In the execution of every jail work convict labour shall be utilized to the
fullest extent. An Executive Engineer is required to give a Superintendent the
option of executing the whole or any part of a jail work and to assist him in
providing employment for prisoners on such work, but as it will not be always
possible for a Superintendent to carry out jail works, such works may be classed
as those to be done by -
(a) convict labour;
(b) free labour; and
(c) convict and free labour combined.
(2) It is laid down in the Public Works Code that estimates for the works on
which it is intended to use prison labour will, as in the case of free labours,
provide for the full market value of the work to be done, but a note of the
reduction to be effected by the employment of convicts will be made on the
abstract of the estimate.
(3) No charges should be made to the Public Works Department when,
convicts are employed on jail works. When prison labour is employed on other
public works the full market value of the work performed, as certified to by the
Executive Engineer, will be charged to the Public Works Department. The
adjustment of such charge should be made according to the general rules for
payments by one Department to another.
(4) The Executive Engineer will from time to time inform the Superintendent
of the probable demand for convict labour, the Superintendent shall arrange as
far as practicable for the required number of convicts being made available and
apply, if necessary, to the Inspector-General for the transfer of as many more
convicts as will make up the required number.
(5) When a sanctioned jail work is to be executed by prison labour, the
Superintendent will apply to the Executive Engineer for all tools, plant and
materials required for the work. Such tools and materials shall be devoted solely
to the purposes sanctioned in the estimate.
(7) The work to be done shall be laid out by the Executive Engineer, or by his
subordinate deputed for the purpose, and no deviation from the sanctioned plan
shall be permitted without formal sanction.
(8) It is the duty of the Executive Engineer to point out to the Superintendent
when progress on a work on which convict labour is employed, is considered
unsatisfactory, to assist the Superintendent in framing a table of task-work, to
instruct his subordinate to report daily those convicts who have not completed
their tasks or who have been otherwise negligent at their work.
(9) All building operations are to be conducted by the Executive Engineer and
his subordinate in-charge, without interference. The supervision of Public Works
Department must however be effectual so that loss to the jail by dismantlement
of work, waste of materials or loss of tools may be reduced to a minimum.
NOTE:- The Governor is pleased to direct that all ordinary repairs to jail
buildings and all special repairs and original works, the estimated cost of which
does not exceed Rs. 500 and which do not require professional skill, be carried
out by Superintendent of Jails. For works costing over Rs. 500 their execution or
otherwise by Superintendents is to be decided, each on its own merits, at the
time of sanction, by Superintending Engineers in consultation with
Superintendents. Works and repairs to be undertaken by the Jails Department
will be subject to the following procedure:-
(a) Estimates for the class of works noted above are to be prepared by the
officers of the Public Works Department as usual, and when it has been decided
that the Jail Department should carry out the work, the estimate abstract shall be
cut down to show saving effected by the use of uncharged for Jail labour.
(b) In cases where the Superintendent of the Jail has no mistri or skilled
workman at his disposal to put in charge of such works, the Executive Engineer
of the Public Works Division concerned should either lend him one from his own
staff, if he has one available or should see, that the estimate provides for payment
of one charged to work. If in any particular case the Superintendent of the Jail
professes his inability to carry out work which the Executive Engineer has not
objected to as unsuitable to Jail labour, the Executive Engineer would, of course,
carry it out for him, the matter is one that should be arranged between the
Superintendent and the Executive Engineer. But it should be borne in mind that
whenever by supplying help in the way of subordinate staff the Executive
Engineer can aid the Superintendent to carry out work, it will be preferable to do
so rather than to undertake it himself.
(c) The Executive Engineer of each Public Works Division should, as far as
possible, inspect or direct one of his subordinates to inspect works made over to
Superintendents of Jails for execution, while they are in progress, when they are
of such a nature that some degree of professional supervision would be desirable.
Superintending Engineers will also during tour examine them, as has been
heretofore customary.
(d) In carrying out Jail works the Superintendent of the Jail will act as agent of
the Public Works Department and as such it will be his duty to see that money
provided for one work is not diverted to another, and that no deviation from
drawings or specifications is allowed.
975. (1) The disposal of complaints of officers of the Public Works
Department regarding the work rests with the Superintendent. It is the duty of
the Executive Engineer to see that his arrangements for materials, etc. are
such that full employment is found for the number of prisoners for whom
he applies.
(2) The discipline, feeding, clothing, treatment, guarding and supervision of
convicts employed on a work, rests with the Superintendent.
(3) No scaffolding, loose bamboos, planks, tools, etc, likely to facilitate escape,
shall be left in the jail at night. Over extensive scaffolding or building materials
that are a source of danger but which cannot be removed each evening, a special
watch shall be placed by the Superintendent.
(4) Outside labourers whenever employed shall be kept as much apart as
practicable from convicts. When skilled outside labourers are engaged to teach
convicts and supervise their work, it must be arranged that discipline is
interfered with as little as possible.
INSPECTION OF JAIL BUILDINGS AND THE ARMOURIES ATTACHED TO THEM.
976 (i) The Divisional Officer of the Public Works Department in-charge of
a jail will submit annually to the Superintending Engineer, for information,
certificate of inspection in the form appended below. The Divisional Officer will
also send a copy of the certificate to the Superintendent of the jail for disposal.
Such report will be forwarded to the Inspector-General.
(ii) On receipt of the certificate the Superintendent of the Jail will ask the
Divisional Officer for estimates for such work as he considers necessary to
remedy the unsatisfactory features noticed. If for financial or other reasons the
Jail Department does not consider it advisable to take action on any of the
matters brought out in the certificate, the Superintendent will inform the
Divisional Officer accordingly so that those particular points may not be repeated
in succeeding certificates.
(iii) The Superintending Engineer will forward to the Chief Engineer, for
information, only such certificates of Inspection as exhibit unsatisfactory features
of an important nature.
SIGNING OF COMPLETION CERTIFICATE
977. On the completion of a work, a completion certificate will be
forwarded by the Executive Engineer to the Superintendent for signature. The
signature merely implies that the Superintendent has satisfied himself to the best
of his ability that the work has been done properly. If he objects to the way the
work has been performed or to any statement on the certificate or other paper
presented to him for signature, he should still sign it, adding any remarks he may
think proper. Remarks which are unnecessary or irrelevant should be avoided.
NOTE - A copy of the completion certificate with the remarks, if any,
made by the Superintendent shall be sent to the Inspector-General.
DISPOSAL MODE OF MATERIALS
Previous and next
← Rule 925An abstract of the result of weighments shall be prepared by the Medical Subordinate on the day following that on which the weighments are made, ShowingRule 978 →Materials derived from jail buildings dismantled or undergoing repair and surplus materials remaining over from a new work, when these have been supplied by the Executive Engineer, are at the disposal of that officer. RESPONSIBILITY OF SUPERINTENDENTS TO GUARD AGAINST FIRE