LawGrids logoLAWGRIDS.ORG

Section 220, The Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996

The Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 (27 of 1996) - Section 220

Text of section 220

220. Operation of pile-driving equipment:-The employer shall ensure at a construction site of a building or other construction work that— (a) only experienced and trained building worker operates pile- driving so as to avoid any probable danger from such operation; (b) pile-driving operations are governed by generally prevalent and accepted signals so as to prevent any probable danger from such operations; (c) every building worker employed in pile-driving operation or in the vicinity of such pile-driving operation wears ear protection and safety helmet or hard hat and safety shoes; (d) piles are prepared at a distance, at least equal to twice the length of the longest pile, from the place of pile-driving operations; (e) when a pile driver is not in use, the hammer of such pile driver is blocked at the bottom of the heads of such pile driver.

Previous and next

All sections of The Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996

Questions people ask

Is section 220 of the Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 still in force?

No repeal of the Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 is recorded.