Section 157, The Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996
The Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 (27 of 1996) - Section 157
Text of section 157
157. Bulk head and air-locks:-The employer shall ensure at a construction
site of a building or other construction work that—
(a) a bulk head or air tight diaphragms retaining compressed air,
when used within a tunnel or a shaft, is constructed to
withstand the maximum pressure at one point two five times the
maximum working pressure of such bulk head or diaphragm and
such bulk head or diaphragm is tested before its each use by a
responsible person referred to in rule 121 to ensure that such
bulk head or diaphragm is in proper working order;
Rule 164 The Building and Other Construction Workers‘ 71
(Regulation of Employment and Conditions of Service)
Central Rules, 1998
(b) such responsible person keeps the record of each test referred to
in clause (a) and such record is produced for inspection to the
Inspector having jurisdiction on demand;
(c) the bulk head or diaphragm referred to in clause (a) are made of
sound material of adequate strength and are able to withstand to
maximum pressure on which they are subjected to at any time of
their use;
(d) a bulk head anchorage and air lock is tested at its workplace at
an excavation or tunnelling work immediately after their
installation at such place.
Previous and next
Questions people ask
Is section 157 of the Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 still in force?
No repeal of the Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 is recorded.