Section 129, The Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996

The Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 (27 of 1996) - Section 129

Text of section 129

129. Depth of trenches:-The employer shall ensure at a construction site of a building or other construction work that— (a) where the depth of a trench requires two lengths of sheet pilling, one above the other, the lower piling is set inside the bottom strings or wales of the upper pilling and such sheet piling is driven down and braced as the excavation continues; (b) all metal sheet piles used in excavation or a trench are welded end to end and secured by other similar means.

Previous and next

All sections of The Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996

Questions people ask

Is section 129 of the Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 still in force?

No repeal of the Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 is recorded.