LawGrids logoLAWGRIDS.ORG

Section 119, The Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996

The Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 (27 of 1996) - Section 119

Text of section 119

119. Notification of intention to carry out excavation and tunnelling work:-(1) Every employer carrying out any excavation or tunnelling work at a construction site of a building or other construction work shall, within thirty days, prior to the commencement of such excavation or tunnelling work, inform in writing the detailed layout plans, method of construction and schedule of such excavation or tunnelling work, to the Director General. (2) In case compressed air is used in such excavation or tunnelling work or any work incidental to or required for such excavation or tunnelling work, the technical details and drawings of all man-locks and medical locks, together with names and addresses of all construction medical officers having qualification as laid down in Schedule XI annexed to these rules and so appointed by such employer for the purpose of such excavation or tunnelling work shall be sent to the Director General.

Previous and next

All sections of The Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996

Questions people ask

Is section 119 of the Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 still in force?

No repeal of the Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 is recorded.