Section 65, The Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996
The Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 (27 of 1996) - Section 65
Text of section 65
65. Hoists:-The employer shall ensure at a construction site of a building or
other construction work that—
(a) hoist towers are designed according to relevant national
standards;
(b) hoist shafts are provided with rigid panels or other adequate
fencing—
(i) at the ground level on all sides of such shafts; and
(ii) at all other levels on all sides of the access to such
shafts;
(c) the walls of hoist shafts, except at approaches, extend to at least
two metres above the floor or platform of access to such shafts;
(d) approaches to a hoist are provided with gates which are—
(i) gridded to maintain visibility;
(ii) at least two metres height; and
(iii) equipped with a device which requires such gate to be
closed before the platform of such hoist can leave the
landing and prevents the gate from being opened unless
such platform, is at the landing;
(e) approaches to a hoist are adequately lit;
(f) the guides of hoist platforms offer sufficient resistance to
bending and, to bucking, in the case of jamming, by providing a
safety catch;
(g) overhead beams and their supports are capable of holding the
total maximum live and dead loads that such beams and
supports will be required to carry, with a safety factor of at least
five;
44 The Building and Other Construction Workers‘ Rule 65
(Regulation of Employment and Conditions of Service)
Central Rules, 1998
(h) a clear space is provided—
(i) above the highest stopping place of a cage or platform to
allow sufficient unobstructed travel of such cage or
platform in case of over-winding; and
(ii) below the lowest stopping place of such cage or platform;
(i) adequate covering is provided above the top of hoist shafts to
prevent materials from falling into such shafts;
(j) outdoor hoist towers are erected on adequately firm foundations
and are securely braced, guided and anchored;
(k) a ladder way extends from the bottom to the top of every outdoor
hoist tower in case no other ladder way exists within easy reach
and such ladder way comply with the relevant national
standards;
(l) the rated capacity of a hoisting engine is at least one and half
times the maximum load that such engine will be required to
move;
(m) all gearing on a hoisting engine is securely enclosed;
(n) steam piping of a hoisting engine is adequately protected against
accidental contact of such piping with a building worker;
(o) electrical equipment of a hoisting engine is effectively earthed;
(p) a hoist is provided with suitable devices to stop a hoisting engine
as soon as the platform of such hoist reaches its highest
stopping place;
(q) a hoisting engine is protected by a suitable cover against
weather and falling objects;
(r) a hoisting engine set up in a public thoroughfare is completely
enclosed;
(s) all exhaust steam pipes discharge steam in such a manner that
the steam so discharged, does not scald any person or obstruct
the operator‘s view;
(t) the motion of a hoist is not reversed without first bringing it to
rest to avoid any harm from such reverse motion;
(u) a hoist, not designed for the conveyance of persons, is not set in
motion from the platform of such hoist;
(v) pawls and ratchet-wheels of a hoist, requiring disengagement of
such pawls from such ratchet-wheels, before the platform of
such hoist is lowered, are not used;
(w) a platform of a hoist is capable of supporting such maximum
load, that such platform may carry, with a safety factor of at
least three;
(x) a platform of a hoist is equipped with suitable safety gear which
can hold such platform with its maximum load in case its
hoisting rope breaks;
(y) on platform of a hoist, the wheelbarrows or truck are efficiently
blocked in a safe position;
(z) a cage of a hoist or a platform, where the building workers are
required to enter into such cage or to go on such platform at
landing level, is provided with a locking arrangement to prevent
such cage or platform from moving during the time a worker
enters or leaves such cage or platform;
(za) the sides of a platform of a hoist which, are not used for loading
or unloading, are provided with toe-board and enclosures of a
Rule 68 The Building and Other Construction Workers‘ 45
(Regulation of Employment and Conditions of Service)
Central Rules, 1998
wire mesh or any other suitable means to prevent the fall on any
part of a load from such platform;
(zb) a platform of a hoist, which has any probability of falling and
part of load from it, is provided with an adequate covering with
such fall;
(zc) the counter-weights of a hoist consisting of an assemblage of
several parts are so constructed that such parts are rigidly
connected together;
(zd) the counter-weights of a hoist run between guides;
(ze) at every level of work the building workers are provided with
adequate platforms for performing such work;
(zf) a legible notice in Hindi as well as in a local language is
displayed at-
(i) a conspicuous place of the platforms of a hoist and that
such notice states the maximum carrying capacity of
such hoist in kilograms;
(ii) a conspicuous place on the hoisting engine and that
such notice states maximum lifting capacity of such
hoist in kilograms;
(iii) a conspicuous place on a hoist authorised and certified
for the conveyance of the person on the platform or cage
and such notice states the maximum number of persons
to be carried on such hoist at one time;
(iv) a conspicuous place on a hoist carrying goods and other
materials and such notice states that such hoist is not
meant for carriage of persons.
Previous and next
Questions people ask
Is section 65 of the Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 still in force?
No repeal of the Building and other Construction Workers‘ (Regulation of Employment and Conditions of Service) Act, 1996 is recorded.