Rule 135, The Punjab Regional and Town Planning and Development (General) Rules, 1995: [Sections 135(4) and 180(2)(zv)]

The Punjab Regional and Town Planning and Development (General) Rules, 1995 - Rule 135

Text of rule 135

[Sections 135(4) and 180(2)(zv)]

135. [Sections 135(4) and 180(2)(zv)].- (1) If any question arises whether a sum is due to the Authority within the meaning of sub-section (2) of section 135, it shall be referred to the Tribunal of Appeal constituted under section 105 who shall after making such inquiry as it may deem fit and after giving to the person by whom the same alleged to be payable an opportunity of being 18 heard, decide the question referred to it, as far as possible, in the same manner as is followed by a civil court in deciding appeals under the Code of Civil Procedure, 1908. (2) The Tribunal of Appeal shall record its decision in writing in every case where the decision of the Arbitrator under clauses (iv) to (xi) and clauses (xiv), (xv), (xvi), (xviii), (xix) and (xx) of sub-section (3) of section 102 of the Act is modified, varied or rejected by it. (3) On receipt of a reference from the Authority under sub-rule (1) the Tribunal of Appeal shall give notice as it deems sufficient to the parties concerned. 66. Recovery of cost under sub-section (2) of section 137. [Sections 173(2) and 180(2)(zw)]- (1) If any officer is appointed by the State Government to complete all the works under the provisions of sub-section (2) of section 137, the cost of such works if not paid on demand, shall be recoverable from the Authority as arrear of land revenue. 19 PART-IX LEVY, ASSESSMENT AND RECOVERY OF DEVELOPMENT CHARGE AND BETTERMENT CHARGE 67. Rate of interest on late payment of development charges. [Sections 140(2) and 180(2)(zx)].- In the event of failure to make payment of development charge as assessed by the Authority under sub-section (1) of section 140 by the person liable to pay such charge on or before the date specified, in the notice given to him by the Authority, interest at the rate of eighteen percent per annum shall be charged on the amount remained unpaid after the said date till the date the amount is actually paid in full. 68. Rate of interest on late payment of betterment charge. [Sections 141(4) and 180(zx)].- In the event of failure to make payment of the amount of the betterment charge as assessed by the Arbitrator under sub-section (3) of section 141 by the liable to pay such change on or before the date specified in the notice given to him by the Authority, interest at the rate of eighteen percent per annum shall be charged on the amount remained unpaid after the said date till the amount is actually paid in full. 69. Security for payment of development charge of betterment charge for filing appeal. [Sections 142(4) and 180(2)(zy)].- The appellant shall furnish to the Chief Administrator of the Authority to the person authorized by him in this behalf, sufficient security either in cash or through a bank guarantee in Form XXIII as it determined by the Tribunal of Appeal before whom appeal has been filed. 70. Manner of enforcing orders of the Tribunal of Appeal passed under section 142. [Sections 142(5) and 180(2)(zz)].- An order passed by the Tribunal of Appeal under section 142 shall be enforced by the Authority in the manner specified here under:- (a) in case the amount of development charge or betterment charge as assessed by the Arbitrator is reduced in appeal, refund the amongst of development charge or betterment charge as the case may be, to the extent it is so reduced; and (b) in case amount of development charge or betterment charge, as the case may be, as assessed by the Arbitrator, is confirmed or enhanced in appeal, deduct the amount so confirmed or enhanced out of the security deposit or the bank guarantee furnished by the assesses at the time the appeal was filed, and if the amount so confirmed or enhanced is more than the amount of the security deposit or the recover the remaining amount after adjusting bank guarantee, the amount of the security deposit or bank guarantee, as if it is an amount recoverable as arrear of land revenue. 71. Payment of development charge fix under section 161. [Sections 161 and 180(2)].- (1) The owners of lands and buildings to which amenities provided by the Authority are extended under section 161 shall be liable to pay to the Authority the amount of the development charge as is fixed by the State Government under that section. (2) On receipt of an intimation about the fixation of development charge under section 161, the Authority shall give to the person liable to pay the development charge a notice, in writing, of the amount of development charge payable by him and the date by which such payment shall be made and such notice shall also state that in the event of failure to make such payment on or before such date, interest at the rate as may be fixed by the Government from time to time by notification in the official gazette, shall be payable from such date on the amount remaining unpaid.] (3) If the amount of development charge is not paid within the period specified in the notice issued in sub-rule (2), the amount so remained unpaid together with interest shall be recoverable as arrears of land revenue. PART X 1.Subsituted vide Notification No. GSR. 21/PA-11/1995/S.180/Amd.(4)/2009 dated 25 th May 2009, published in Punjab Govt. Gaz. (Extra) June 1,2009. 20 CONTROL AND DEVELOPMENT ALONG SCHEDULED ROADS 72. Application for permission under section 144. [Sections 144(1) and 180(2)(zza)].- (1) Every person desiring to obtain permission of the Competent Authority under clauses (b), (c) or (d) of sub- section (2) of section 143 shall make an application to the Competent Authority in Form XXIV which shall be accompanied by the plans and documents mentioned therein. (2) The site plan mentioned in the application shall be drawn on a scale, of not less than one centimetre to a metre indicating the boundaries of the site, specifying therein:- (a) the outline of the proposed building with outer dimension mentioning therein; (b) the total area to be covered; (c) the existing building, if any, by distinct notation. (3) The building plan mentioned in the application made under sub-rule (1) shall be drawn to a scale of not less than 1:100 and indicate,- (a) the plan of all the floors of the building; (b) the elevation in typical sections, to be given only in the case of motor fuel filing station or bus queue shelter; and (c) the plinth level with reference to the level of the central line of the scheduled road or bye-pass as the case may be. 73. Principles and conditions under which permission under section 144 may be granted or refused. [Sections 144(i) and 180(2)(229)].- No permission shall be granted on an application submitted under rule 72 unless,- (a) the erection or re-erection of the building conforms to the building rules; (b) the means of excess take off from in existing road or revenue rasta already adjoining the scheduled road or conforms to traffic requirements of the scheduled road as determined by the Competent Authority; and (c) the erection or re-erection of motor fuel filling station or bus queue shelter is in accordance with the designs and specifications laid down by the Competent Authority. 74. Information necessary to validate application under rule 72. [Sections 144(i) and 180(2)(229)].- (1) No application under rule 72 shall be considered to be valid unless,- (i) it is made on the form specified in rule 72 and all the necessary information required to be filled in that form is given; and (ii) where necessary, it is accompanied by the requisition number of the site plans, building plans and other documents. (2) In case of failure to submit the application n the manner specified in sub-rule (1), the application together with the plans and documents if any, shall be returned to the applicant for re-submission in accordance, with these rules. 75. Form in which order under sub-section (2) of Section 144 (2) is to be passed. [Sections 144(i) and 180(2)(229)].- After an application in the form specified in rule 72 containing the requisite information and accompanied by necessary documents as mentioned in rule 74 is received, the Competent Authority shall, after making such inquiry as it consider necessary, pass an order under section 144 in Form XXV. 76. Register to be maintained by the Competent Authority under Section 144(4). [Sections 144(4) and 180(2)(221)].- (1) The Competent Authority shall maintain a register in Form XXVI containing particulars of all such cases in which the permission is given or deemed to have been given or refused by it under section 144. (2) The register specified under sub-rule (1) shall be available for inspection without charge by all persons interested and such persons shall be entitled to obtain copies of the extracts of the register relevant to such persons on payment of fee at the rate of rupees five per page. 21 PART IX TRANSFER OF EMPLOYEES OF THE DIRECTORATE OF HOUSING AND URBAN DEVELOPMENT TO THE PUNJAB URBAN PLANNING AND DEVELOPMENT AUTHORITY. 77. Employees of the Directorate to give option for their transfer to the Authority, [Sections 154 and 180(2)(221)].- (1) As soon as may be, after the date of establishment of the Punjab Urban Planning and Development Authority under section 17 of the Act, the State Government shall obtain option in Form XXVII the employees serving immediately before that the date in connection with the affairs of the State of Punjab in the Directorate of Housing and Urban Development, whose assets transferred to the Punjab Housing Development Board under the Punjab Urban Estates (Development and Regulation) Act, 1964 (Punjab Act 22 of 1964), as to whether they are wiling to be transferred to the service of the Punjab Urban Planning and Development Authority. (2) After obtaining the option of the employees of the Directorate under sub-rule (1), the State Government shall forward such option to the Punjab Urban Planning and Development Authority for considering the suitability of such employees for their transfer to the service of the Authority. (3) When the suitability of the employees of the Directorate is determined by the Authority referred to the sub-rule (2), it shall recommend to the State Government the names of the employees found suitable for transfer to its service. (4) On receipt of recommendations under sub-rule (3), the State Government shall issue orders under sub-section (1) of section 151 of the Act for the allocation of the employees of the Directorate to the Authority with effect from the date of establishment of the Punjab Urban Planning and Development Authority under section 17. 22 Schedule I [See rules 16 and 17(2)] Budget Estimates of The Punjab Urban Planning And Development Authority Abstract of the Budget/Supplementary Budget for the year__________________ (Figures in lacs) Account of the previous year Budget for the Current Year Revised Estimates for the Current Year Budget Estimates for the year Receipts 1. Opening Balance 2. Capital Receipt 3. Revenue Receipt Total : Expenditure 1. Capital Expenditure 2. Revenue Expenditure Total : Closing Balance Budget Estimates/supplementary Estimates of The Punjab Urban Planning And Development Authority For The Year___________________ (Figures in lacs) Serial No. Particulars Accounts of previous year Budget for the Current Year Revised Budget Estimates for the Current Year Budget Estimates for the year 1 2 3 4 5 6 A Opening Balance B Capital Receipts 1 Loan from Government 2 Loan from the Housing and Urban Development Corporation (i) Authority's Schemes(Annexure I) (ii) Government Schemes(Annexure II) 3 Loan from other Sources 4 Subsidies 5 Grants 6 Sub-ventions from Government 7 Advance Deposits (i) From Government for Government Schemes excluding interest (Annexure ) (ii) From others (Private Promoters) (Annexure ) (iii) From applicants for plots (Annexure ) (iv) From applicants for houses (Annexure ) (v) From sale of commercial plots (Annexure ) (vi) From sale of built-up Booths/Shop-cum- Offices (Annexure ) 23 (vii) From applicants as Earnest Money for houses (Annexure ) (viii) From applicants as Earnest Money for plots, residential, commercial and built-up Booths/Shop-cum- Offices (Annexure ) 8 Recoveries (i) Instalments(Principal of houses) (Annexure ) (ii) Instalments of plots (Annexure ) (iii) Instalments on sale of commercial plots, booths and shops-cum- Offices (Annexure ) 9 Additional Price (plots) (Annexure ) 10 Additional Price (Houses) (Annexure ) 11 Debentures and Bonds etc. 12 Recovery of loans for construction of buildings (Annexure ) Total Capital Receipts C. Capital Expenditure 1 Authority's Schemes (a) (i) Purchase of land (ii) Payment of enhanced compensation (iii) Construction of Social Houses(Annexure ) (iv) Construction of Commercial Centres (Annexure ) (b) (i) Establishment and contingent expenditure (Head Office) (ii) Establishment and contingent expenditure on (Field Staff) 2 Development Works (i) Development of land for social houses(Annexure ) (ii) Development of land for other purposes (Annexure ) 3 Government Schemes 4 Deposit Works 5 Investments (i) Share Capital/Promoters' contribution for companies (ii) Others 6 Purchase of capital assets of the Authority 7 Refund of earnest money (Houses) 8 Refund of earnest money 24 (Plots) 9 Loans for construction of buildings for residential, industrial and commercial purposes 10 Loans to the employees of the Authority 11 Other loans 12 Repayment of loans (i) Government (ii) (Housing Urban Development Corporation (Annexure) (iii) Others 13 Stock inventory 14 Purchase of material for Laboratory etc. (Quality control) 15 Purchase of machinery 16 Other capital expenditure, if any Total Capital Expenditure D. Revenue Receipt 1 Licence fee from promoters and State agents 2. Other fees from sale/lease/transfer etc. of property 3. Interest from Banks 4. Interest on instalments of Houses/Plots/Commercial sites etc. (Annexure ) 5. Interest from Government on HUDCO loan received for Government Schemes (Annexure ) 6. Rent from Booths/Shop-cum- Offices 7. Other miscellaneous receipts 8. Miscellaneous Income (i) Centage and Administrative Charges (ii) Stock Storage 9 Receipts on account of loans paid to employees Total Revenue Receipts E. Revenue Expenditure 1 Payment Of Interest (i) Government (ii) HUDCO (Annexure) (iii) Others 2 Salaries of Establishment (Annexure ) 3 Office contingency (Annexure ) 4 Miscellaneous Expenditure (Annexure ) Total Revenue 25 Expenditure Schedule of Hudco's Loan Proposal For The Year _______ (Social Houses) (Figures in lacs) Serial No. Name of Scheme Scheme Number Loan Component Budget provision for the current year Loan drawn against budget upto_____ Loan expected upto_____ Revised Budget for the current year Budget for the year____ 1 2 3 4 5 6 7 8 9 Schedule of Hudco's Proposal For The Year ____________ (Government Schemes) (Figures in lacs) Serial No. Name of Scheme Scheme Number Local Component Budget provision for the current year Loan drawn against Budget upto----- Loan expected upto_____ Revised Budget for the current year Budget for the year_____ 1 2 3 4 5 6 7 8 9 Schedule of Capital Receipt of Houses, Plots Etc. (Figures in lacs) S.No. Name of Estate Office Budget Estimates for the Current year Revised Budget Estimates for the current year Budget Estimates for the year Twenty five per cent cost Monthly instalments Total Twenty five per cent cost Monthly instalments Total Twenty five per cent cost Monthly instalments Total Principal Interest Principal Interest Principal Interest 1 2 3 4 5 6 7 8 9 10 11 12 13 14 I. Housing II. Residential Plots III. Commercial Plots IV. Built-up Booths/Shop-cum-Offices V. Other Miscellaneous Receipts of Capitalnature e.g. additional price VI. Recovery of loans for construction of houses VII. Recovery of loans from promoters VIII Others Schedule of Capital Receipts of Government Schemes (Figures in lacs) S. No. Name of work Budget Estimates for the current year Revised Budget Estimates for the current year Budget Estimates for the year State Government HUDCO Loan OtherTotalState Government HUDCO Loan OtherTotalState Government HUDCO Loan OtherTotal 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Schedule of Expenditure For The Acquisition of Land/social Houses/commercial Centres/urban Estates/government Schemes (Separate Annexure For Each) (Figures in lacs) S.No.Name of Scheme Estimated Cost Accounts of the previous year Budget for the current year Actual from April to September Anticipated from October to March Revised Estimate for the current year Budget Estimates for the year 1 2 3 4 5 6 7 8 9 26 Schedule of Re-payment of Loan for the Year (Figures in lacs) S. No. Particulars of Re- payment Actual for the previous year Budget Estimates for the current year Revised Budget for the current year Estimates for the year PrincipalInterestTotalPrincipalInterestTotalPrincipal InterestTotalPrincipalInterestTotal 1 2 3 4 5 6 7 8 9 10 11 12 13 14 I. Punjab Government II. HUDCO (i) For Government Schemes (ii) Social Houses (iii) Other Refunds Schedule of Expenditure on Establishment For The Year, 199__ (Figures in lacs) S.No. Particulars Account for the Previous year Budget for the current year Revised Estimates for the current year Budget Estimates for the year 1 2 3 4 5 6 1 Pay and allowances 2 Medical reimbursement 3 Travelling Allowance 4 Leave Salary and Pension Contribution 5 Loan and Advances to staff 6 Contingencies 7 Miscellaneous Total : Schedule II [See rule 18(4)] The Punjab Urban Planning And Development Authority Part-I Balance Sheet as on 31st March Previous Year Amount in Rupees Liabilities AnnexureCurrent Year Amount in Rupees Previous Year Amount in Rupees Assets AnnexureCurrent Year Amount in Rupees Capital Reserve A Fixed Assets F Secured Loans B Investment G Unsecured Loans C Work Executed by Authority H Deposit with Authority D Current Assets Loans and Advances I Current Liabilities E Note : 1. The authority may add other annexures to explain detail of various Heads in the Balance Sheet. Note : 2. Schedules and notes to accounts form an integral part of the accounts. ____________________________Chief Administrator Vice-Chairman Place_______________________ Dated_______________________ Auditor's Report In terms of our separate report of even date attached to the balance-sheet. 27 The Punjab Urban Planning And Development Authority Income and Expenditure Account for the year, ending 31st March. Previous Year Amount in Rupees Particulars Amount in Rupees Current Year Amount in Rupees Previous Year ParticularsAmount in Rupees Current Year Amount in Rupees Administrative and other Expenses (As per Annexure-J) Interest Received From Banks Less Administrative Charges capitalised From Allottees on instalments. (Ten per cent of the work executed on own schemes) Interest and Dividends from investments. Depreciation (As per Annexure-F) Others Interest on Loans :- Miscellanous Receipts HUDCO Receipt on Booths/Shop-cum-Offices. Punjab Government Others Less transferred to Replacement Reserves Less interest capitalized to Schemes Profit on sale of Vehicles Interest paid on Earnest Money Forfeiture of earnest money Interest on debentures/bonds/Other Financial Institutions. Stock Storage Provision for loss of stock Contage on Deposit work Excess of income over expenditure transferred to general reserve Sewerage ChargesExcess of expenditure over income Excess provisions written back, if any, Chief Administrator Vice-Chairman Place : Dated : Note : The Authority may add other annexures or other explanation or information to explain detail of Income and Expenditure. Auditor's Report In terms of our separate report of even date attached to the balance-sheet. 28 The Punjab Urban Planning And Development Authority Capital Reserve As On 31st March ______ Annexure A Previous Year Particulars Amount in rupees Current Year Amount in lacs (A) General Reserve (i) Capital Fund Balance as on 1st April Add Additions during the year (ii) Subsidy (subversion) from Punjab Government. (B) Repair and Replacement Reserve (i) Houses as on 1st April Addition During the year Less repair______________________ (ii) Shop-cum-Offices and Booths as on 1st April Addition during the year___________________ (C) Revaluation Reserve (i) Balance as on 1st April Add Additions______________________ (D) Reserve for Staff Welfare As on 1st April Additions during the year_____________ Chief Administrator Vice-Chairman Place________________ Dated_____________ Auditor's Report In terms of our separate report of even date attached to the balance-sheet. 29 The Punjab Urban Planning And Development Authority Secured Loans As On 31st March_______________ Annexure-B Previous year Particulars Current year 1. Housing and Urban Development Corporation. 2. Banks 3. Any other Organisation Total : Place : Chandigarh Dated : Chief Administrator Vice-Chairman Auditor's Report In terms of our separate report of even date attached to the balance sheet. The Punjab Urban Planning And Development Authority Unsecured Loans As On 31st March_______________ Annexure-C Previous year Amount in Rupees Particulars Current year Amount in rupees Housing and Urban Development Corporation Limited (Guaranteed by State Government and Bank) Punjab Government Loan from State Government for Low Income Group (LIG) and Middle Income Group (MIG) Houses. Interest free loan from Punjab Government Loan from others (Give details) ________________Chief Administrator Vice-Chairman Place : Dated :__________ Auditor's Report In terms of our separate report of even date attached to the balance sheet. 30 The Punjab Urban Planning And Development Authority Deposit with the Authority as on 31st March,_________________ Annexure-D Previous YearAmount in Rupees Particulars Current yearAmount in Rupees Earnest money/Security from Contractors, Brick Kiln owners and suppliers. Deposit for work to be done pending adjustment against work. Earnest money from allottees and prospective buyers. Earnest money for plots from allottees and prospective buyers. Security from employees. Instalment received pending adjustments. Deposit for work (As per contra) (payment liability to HUDCO). Advance instalments. Other Securities. _______________Chief Administrator Vice-Chairman Place : Dated : Auditor's report In terms of our separate report of even date attached to the balance-sheet. The Punjab Urban Planning And Development Authority Current Liability and Provisions as on 31st March_______________ Annexure-E Previous YearAmount in rupees Particulars Current YearAmount in rupees A. Current Liabilities : 1. Creditors and Payables : (i) Creditors for Suppliers. (ii) Creditors for Expenses. (iii) Creditors for Contractors. (iv) Other Creditors. (v) Payable to staff. (vi) Loan instalments due but not paid to Punjab Government. (vii) Interest accrued but not paid to Punjab Government. (viii) Provident Fund (Contributory) (ix) Loans instalments due but not paid to the Life Insurance Corporation. (x) Interest due but not paid to the Life Insurance Corporation. (xi) Amount payable to other creditors. 2. Suspenses Account (As per contra) (i) Hire-Purchase Sales Suspense Account. (ii) Hire-Purchase Interest Suspense Account. 3. Other (i) Compulsory Deposit Scheme Deductions. (ii) Suspense Account penal rate recovery. 31 (iii) Stock Suspense Account. 4. Miscellaneous Sub Total 'A' B. Provisions : 1. Provisions for sub-standard materials. 2. Provisions for doubtful advances of suppliers, Brick Kiln Owners and Contractors as on ____________________ Addition during the year. 3. Provision for other doubtful advances. Additions during the year. 4. Provisions for Gratuity. Additions during the year. 5. Provision for Losses due to natural calamities and other factors. Sub Total 'B' Total (A+B) ________________Chief Administrator Vice-Chairman Place : Dated : Auditor's Report In terms of our separate report of even date attached to the balance-sheet. The Punjab Urban Planning And Development Authority Schedule of Fixed Assets As On___________ Annexure-F ParticularsCost as on 1st April Addition during the year Write off Total as on 31st March Rate of Depreciation Upto 31st March During the year Written Back Total upto 31st March as on 31st March Written down value as on 31st Marc 1 2 3 4 5 6 7 8 9 10 11 12 1. Furniture and Fixure 2. Vehicles 3. Office Equipments 4. Feroprinting Machines 5. Cycles 6. Typewriter and Duplicators 7. Weighing Machines 8. Library Books 9. Water Coolers 10. Survey Equipments 11. Trucks 12. Air Conditioners 13. Lab Equipments 14. Office-partition 15. Road Rollers 16. Computer 17. Buildings 18. Less subsidy from HUDCO for computer Sub Total : 32 GROSS BLOCK DEPRECIATION ParticularsCost as on 1st April AdditionWrite off 31st March Total as on Rate of depreciation upto 31st March During the year Written back Total upto 31st March As on 31st March As on 31st March 1 2 3 4 5 6 7 8 9 10 11 12 *** TOOLS AND PLANTS Sub-Total : Total : ________________Chief Administrator Vice-Chairman Place : Dated : Auditor's Report In terms of our separate report of even date attached to the balance-sheet. *** Give details. The Punjab Urban Planning And Development Authority Investment As On 31st March, __________________ Annexure G Previous years Amount in rupees Particulars Current year Amount in rupees 1. Investment in Government or Trust Security 2. Investment in Shares, Debentures and Bonds in Subsidiary Companies and Organisations promoted by the Authority 3. Investment in Shares, Debentures and Bonds of other Organisations 4. Others ________________Chief Administrator Vice-Chairman Place : Dated : Auditor's Report In terms of our separate report of even date attached to the balance-sheet. 33 The Punjab Urban Planning And Development Authority Works Executed By The Authority As On 31st March________ Annexure H Previous year amount is rupees Particulars Current year amount in rupees A. Authority's own Schemes : Works completed and in progress Completed Works Work in Progress Land of own Schemes Less : (Capital Receipt from allottees), (-) Grant-in-aid (-) B. Urban Estate Works : Works completed and in progress Land Urban Estate Add : Grant given for any infrastructure facility like stadium etc.Any other work ________________________ Less : Capital Receipt from Allottees, (-) Less : Grant received from Government, (- ) C. Deposit Works : Works completed and in progress Land for deposit works Centage Charges, ___________ D. Temporary Structure E. Others ________________Chief Administrator Vice-Chairman Place : Dated : Auditor's Report In terms of our separate report of even attached to the balance-sheet. 34 1 2 3 B. Loans and Advances : 1. Advances recoverable in cash or kind or for value to be received (unsecured but considered good by management) (i) Advances to Suppliers, Brick Kiln Owners and Contractors for material (ii) Advances to staff for construction (iii) Advances to staff for other purposes (iv) Other advances (v) Advances to victims of natural calamities and other factors (vi) Advances to other Organisations 2. Miscellaneous Deposits viz. Security/Compulsory Deposit Scheme etc. (i) With Government (ii) With others 3. Government liability to the Housing and Urban Development Corporation (HUDCO) (as per contra). Sub Total : B Total (A+B) ________________Chief Administrator Vice-Chairman Place : Dated : Auditor's Report In terms of our separate report of even date attached to the balance-sheet. The Punjab Urban Planning And Development Authority Current Assets And Loans and Advances as on 31st March, ______________ Annexure I Previous year amount in Rupees Particulars Current year amount in Rupees A. Current Assets 1. Closing Stock (as valued and varified by the Management) (i) Building Material (ii) Loss of stock due to natural calamities and other factors for which provisions has been made (iii) Stock in transit. 2. Sundry Debtors (unconfirmed but considered good by Management), (i) Hire-Purchase Debtors overdue, (ii) Others 3. Cash and Bank Balance (i) Cash in hand (ii) Amount in transit

Previous and next

All provisions of The Punjab Regional and Town Planning and Development (General) Rules, 1995

Questions people ask

Is rule 135 of the Punjab Regional and Town Planning and Development (General) Rules, 1995 still in force?

No repeal of the Punjab Regional and Town Planning and Development (General) Rules, 1995 is recorded.