Rule 5, Chennai Metropolitan Area Ground (Regulation) Rules, 1988: Registration of existing wells and use of groundwater in scheduled area
Chennai Metropolitan Area Ground (Regulation) Rules, 1988 - Rule 5
Text of rule 5
Registration of existing wells and use of groundwater in scheduled area
5. Registration of existing wells and use of groundwater in scheduled area.— (1) The
competent authority shall prepare and maintain a register showing the number of existing
wells in the scheduled area and the use of groundwater in the scheduled area for agricultural
purposes immediately before the 17
th
June 1987, within ninety days from the date of the
publication of these rules in the Tamil Nadu Government Gazette.
(2) The Register of wells shall be in Form-X.
(3) The extract of the Register of wells in so far as the entries relate to any revenue
village specified in the schedule to the Act or City of
1
[Chennai] shall be published in the
Tamil Nadu Government Gazette and displayed in the offices of the respective village
administrative officers and in the office of the respective Area Engineers of the Board in the
City of
1
[Chennai] within thirty days after the expiry of the period specified in sub-rule (1).
______________________________
1. Substituted for the word ❝Madras❞ by Tamil Nadu Act 28 of 1996.
40
THE CHENNAI METROPOLITAN AREA GROUND WATER (REGULATION) RULES, 1988
(4) (a) Any request by the aggrieved land owner or occupier for non-inclusion in the
Register of wells, or the use of groundwater for agricultural purposes in relation to any such
land or for modification of the particulars as entered in the Register of wells shall be made to
the competent authority in Form-XI.
1
[The competent authority shall pass an order in writing
within thirty days from the date of receipt of such application from the applicant.]
(b) A court fee stamp for the value of one rupee shall be affixed on every application
made under this rule.
(c) The application shall be made to the competent authority within thirty days from
the date of the publication of the extracts of the Register of wells in the Tamil Nadu
Government Gazette:
Provided that the competent authority may, if satisfied that any aggrieved land owner or
occupier had sufficient cause for not making the application in time, allow a further time of
thirty days for making the application.
(5) An extract of entries made in the Register of wells shall be furnished to the owner
or the occupier of land on application made in Form-XII to the competent authority. A fee of
rupees two only shall be payable by the applicant into anyone of the branches of the State
Bank of India to the credit of the Board and the counterfoil of the chalan shall be presented to
the competent authority along with the application in Form-XII.
2
[5-A. Implementation of rain water harvesting measures.— (1) Every building owned
or maintained by the Government or a company or other institution owned or controlled by
the Government, shall within one year from the 21
st
day of November, 2002,--
(a) provide roof top rain water harvesting structure wherever a storage tank or an open
well or a bore well or a bore well is available in the building irrespective of the nature of sub-
soil conditions;
(b) surface run-off water from the open spaces around the buildings, parks and
playgrounds shall be harvested using appropriate recharge structures based on the nature of
the sub-soil conditions.
______________________________
1. Added by G.O. Ms. No. 168, MAWS (Metro Water) Dept., dated 21
st
November 2002.
2. Rule 5-A was inserted by G.O. Ms. No. 68, Municipal Administration and Water Supply
(Metro Water) Department, dated 21
st
November, 2002.
41
THE CHENNAI METROPOLITAN AREA GROUND WATER (REGULATION) RULES, 1988
(i) Roof-top rain water harvesting:--
(a) Direct collection.— Rain water from the roof of the buildings such as tiled/sloped
terrace building and flat/RCC (Reinforced concrete cement) roof shall be collected using
appropriate size of gutters or PVC (Poly vinyl chloride) pipes and stored either in a collection
tank or storage tank of appropriate size placed over tha ground or underground through a
filter unit. A filter chamber of appropriate size shall be provide to filter the dust particles
usually present in the roof-tops of the buildings. Suitable filter material such as well-burnt
broken bricks or coarse sand or small sized pebbles or blue metal gravels (baby chips) shall
be used in the filter chamber. The surplus water available after filling the storage tank/sump
shall be diverted to the nearby open well or bore well or recharge pits. Proper disinfection
shall be made while storing the water for long use.
(b) Recharging the open well/bore well.— The rain water collected from the roof
tops of both tiled/sloped roof and flat/RCC (Reinforced concrete cement) roofs using gutters
or PVC (Poly vinyl chloride) pipes shall be diverted to the open well or bore well through a
filter chamber of appropriate size. Regular disinfection methods are to be practised while
harvesting rain water in open wells.
(ii) Harvesting surface run-off water.— Apart from the roof-top rain water harvesting,
the rain water available in the open spaces around the buildings and in places/buildings where
a sump or open well or bore well is not available the rain water shall be harvested and
recharged into the ground using appropriate recharge structures based on the nature of the
sub-soil conditions as mentioned below:
(a) Sandy sub-soil areas.— In places where the sub-soil formation is sandy in nature
the rate of percolation of rain water will be more and therefore provision of shallow recharge
structures such as percolation/recharge pits, recharge trenches or shallow recharge wells are
considered to be suitable for rain water harvesting.
(i) Percolation/recharge pits shall be provided around the buildings with
minimum size of 1 metre x 1 metre x 1 metre and filled with permeable medium such as
broken bricks or pebbles or coarse sand, etc. The number of these pits shall vary based on the
extent of the area
42
THE CHENNAI METROPOLITAN AREA GROUND WATER (REGULATION) RULES, 1988
of water collection. On an average one unit is required for an area of 250 square feet. These
structures are suitable for individual houses in general.
(ii) Recharge trenches (Longitudinal in shape) similar to the
percolation/recharge pits are suitable for apartment/commercial complexes, where the
availability of rain water is more. Two or three of these structures hall be provided on the
basis of the extent of the building.
(iii) Shallow recharge wells are similar to the common open wells except in
size and depth. Normally, for an individual house with 1000 square feet area, a recharge well
with 1.0 metre dia and 3.0 metre dia depth is required. For apartments/commercial
complexes two or three recharge wells are required based on the extent of the building.
Either brick wall or RCC (Reinforced concrete cement) concrete rings shall be used for
construction. The top of the recharge well should be covered with RCC (Reinforced concrete
cement) slab. Recharge wells are to be desilted once in a year or two for its effective
recharge. Rain water collected from the roof tops of buildings and open surfaces shall be
diverted to these recharge structures through PVC (Poly vinyl chloride) pipe line or by
providing channels on the ground. These structures shall be maintained properly for effective
recharge.
(b) Clay sub-soil areas.— In places where the sub-soil formation is clay in nature the
rate of percolation of rain water will be very slow and therefore provision of
percolation/recharge pit with bore, recharge trench with bore or deep recharge well are
considered to be suitable for rain water harvesting.
(i) Percolation/recharge pit with bore.— It is similar to the one mentioned in
sandy sub-soil formation except a bore hole at the bottom of the percolation pit which is also
filled with the same permeable materials. A minimum size of 4½ inch diameter and 15 feet
depth is normally required for one pit. However, if sand formation is available below the top
clay layer, the bore has to be drilled preferably upto the sand formation. The number of these
pits shall vary based on the extent of the area of water collection. On an average one unit is
required for an area of 250 square feet. These structures are suitable for individual houses in
general.
43
THE CHENNAI METROPOLITAN AREA GROUND WATER (REGULATION) RULES, 1988
(ii) Recharge Trench with Bore.— These are similar to the recharge pits but
are longitudinal in shape and bore holes shall be provided at the bottom for every 10-15 feet
of the trench. The trench and bore holes shall be filled with the same permeable materials
such as broken bricks or pebbles or coarse sand, etc. These structures are suitable for
apartments/commercial complexes where the availability of rain water is more.
(iii) Deep/large recharge wells.— These are similar to the common open wells
except in size and depth and arc considered to be suitable for apartment/commercial
complexes. In general, a recharge well with 1.5 metre dia and 5.0 metre depth is required for
a small apartment. Either brick wall or RCC(Reinforced concrete cement) concrete rings
shall be covered with RCC(Reinforced concrete cement) slab. The recharge well shall be
desilted once in a year or two for effective recharge. Rain water collected from the roof tops
of the buildings and open surfaces shall be diverted to these recharge structures through PVC
(Poly vinyl chloride) pipe line or by providing channels on the ground. These structures
should be maintained properly for effective recharge.
(c) Hard rock areas (Weathered).— (1) In hard rock areas also, the rate of percolation
of rain water will be slow. Therefore, in order to collect and recharge the rain water it would
be preferable to construct recharge wells of appropriate size. Percolation pit with deep bore
holes upto a depth of 50-100 feet shall be provide. In this case, the bore hole is to be
constructed with slotted pipe for effective recharge. In general, construction of separate
recharge structures shall be provided in the absence of existing infrastructure such as storage
tank/sump, open well or bore well in order to reduce the cost involved.
(2) Every person who constructs a building, whether for residential or non-residential
purpose, shall on or after the 21
st
day of November, 2002,--
(a) Provide roof top rain water harvesting structure wherever a storage tank or an open
well or a bore well is available in the building irrespective of the nature of sub-soil
conditions;
44
THE CHENNAI METROPOLITAN AREA GROUND WATER (REGULATION) RULES, 1988
(b) Surface run-off water from the open spaces around the buildings, parks and
playgrounds shall be harvested using appropriate recharge structures based on the nature of
the sub-soil conditions.
(i) Roof-top rain water harvesting.—
(a) Direct collection.— Rain water from the roof of the buildings such as tiled/sloped
terrace building and flat/RCC(Reinforced concrete cement) roof shall be collected using
appropriate size of gutters or PVC (Poly vinyl chloride) pipes and stored either in a collection
tank or storage tank of appropriate size placed over the ground or underground through a
filter unit. A filter chamber of appropriate size shall be provided to filter the dust particles
usually present in the roof-tops of the buildings. Suitable filter material such as well burnt
broken bricks or coarse sand or small sized pebbles or blue metal gravels (baby chips) shall
be used in the filter chamber. The surplus water available after filling the storage tank/sump
shall be diverted to the nearby open well or bore well or recharge pits. Proper disinfection
shall be made while storing the water for ling use.
(b) Recharging the open well/bore well.— The rain water collected from the roof
tops of both tiled/sloped roof and flat/RCC(Reinforced concrete cement) roofs using gutters
or PVC (Poly vinyl chloride) pipes shall be diverted to the open well or bore well through a
filter chamber of appropriate size. Regular disinfection methods are to be practised while
harvesting rain water in open wells.
(ii) Harvesting Surface run-off water.— Apart from the roof-top rain water harvesting,
the rain water available in the open spaces around the buildings and in places/buildings where
a sump or open well or bore well is not available the rain water shall be harvested and
recharged into the ground using appropriate recharge structure based on the nature of the sub-
soil conditions as mentioned below:
(a) Sandy sub-soil areas.— In places where the sub-soil formation is sandy in nature
the rate of percolation of rain water will be more and therefore provision of shallow recharge
structure such as percolation/recharge pits, recharge trenches or shallow recharge wells are
considered to be suitable for rain water harvesting.
45
THE CHENNAI METROPOLITAN AREA GROUND WATER (REGULATION) RULES, 1988
(i) Percolation/recharge pits shall be provided around the buildings with
minimum size of 1 metre x 1 metre x 1 metre and filled with permeable medium such as
broken bricks or pebbles or coarse sand, etc. The number of these pits shall vary based on the
extent of the area of water collection. On an average one unit is required for an area of 250
square feet. These structures are suitable for individual houses in general.
(ii) Recharge trenches (longitudinal in shape) similar to the
percolation/recharge pts are suitable for apartment/commercial complexes. Where the
availability of rain water is more. Two or three of these structures shall be provided on the
basis of the extent of the building.
(iii) Shallow recharge wells are similar to the common open wells except in
size and depth. Normally, for an individual house with 1000 square feet area, a recharge well
with 1.0 metre dia and 3.0 metre dia depth is required. For apartments/commercial complexes
two or three recharge wells are required based on the extent of the building. Either brick wall
or RCC(Reinforced concrete cement) concrete rings shall be used for construction. The top
of the recharge well should be covered with RCC (Reinforced concrete cement) slab.
Recharge wells are to be de-silted once in a year or two for its effective recharge. Rain water
collected from the roof tops of buildings and open surfaces shall be diverted to these recharge
structure through PVC (Poly vinyl chloride) pipe line or by providing channels on the
ground,. These structures shall be maintained properly for effective recharge.
(b) Clay sub-soil areas.— In places where the sub-soil formation is clay in nature the
rate of percolation of rain water will be very slow and therefore provision of
percolation/recharge pit with bore, recharge trench with bore or deep recharge well are
considered to be suitable for rain water harvesting.
(i) Percolation/recharge pit with bore.— It is similar to the one mentioned in
sandy sub-soil formation except a bore hole at the bottom of the percolation pit which is also
filled with the same permeable materials. A minimum size of 4½ inch diameter and 15 feet
depth is normally required for one pit. However, if sand formation is available below the top
clay layer, the bore has to be drilled preferably upto the
46
THE CHENNAI METROPOLITAN AREA GROUND WATER (REGULATION) RULES, 1988
sand formation. The number of these pits shall vary based on the extent of the area of water
collection. ON an average one unit is required for an area of 250 square feet. These
structures are suitable for individual houses in general.
(ii) Recharge trench with bore.— These are similar to the recharge pits but
are longitudinal in shape and bore holes shall be provided at the bottom for every 10-15 feet
of the trench. The trench and bore hole shall be filled with the same permeable materials
such as broken bricks or pebbles or coarse sand, etc. These structures are suitable for
apartments/commercial complexes where the availability of rain water is more.
(iii) Deep/large recharge wells.— These are similar to the common open wells
except in size and depth and are considered to be suitable for apartment/ commercial
complexes. In general, a recharge well with 1.5 metre dia and 5.0 metre depth is required for
a small apartment. Either brick wall or RCC (Reinforced concrete cement) slab. The
recharge wells shall be de-silted once in a year or two for effective recharge. Rain water
collected from the roof tops of the buildings and open surfaces shall be diverted to these
recharge structures through PVC (Poly vinyl chloride) pipe line or by providing channels on
the ground. These structures should be maintained properly for effective recharge.
(c) Hard-rock areas (weathered).— In hard lock areas also, the rate of percolation of
rain water will be slow. Therefore, in order to collect and recharge rain water it would be
preferable to construct recharge wells of appropriate size. Percolation pits with deep bore
holes upto a depth of 50-100 feet shall be provide. In this case, the bore hole is to be
constructed with slotted pipe for effective recharge. In general, construction of separate
recharge structures shall be provided in the absence of existing infrastructure such as storage
tank/sump, open well or bore well in order to reduce the cost involved.
47
THE CHENNAI METROPOLITAN AREA GROUND WATER (REGULATION) RULES, 1988
(3) The owner or occupier of any building in existence on the 21
st
day of November,
2002,--
(a) Provide roof top rain water harvesting structure whenever a storage tank or
an open well or a bore well is available in the building irrespective of the nature of sub-soil
conditions;
(b) Surface run-off water from the open spaces around the buildings, parks and
playgrounds shall be harvested using appropriate recharge structures based on the nature of
the sub-soil conditions.
(i) Roof-top rain water harvesting.—
(a) Direct collection.— Rain water from the roof of the buildings such as tiled/sloped
terrace building and flat/ RCC (Reinforced concrete cement) roof shall be collected using
appropriate size of gutters or PVC (Poly vinyl chloride) pipes and stored either in a collection
tank or storage tank of appropriate size placed over the ground or underground through a
filter unit. A filter chamber of appropriate size shall be provided to filter the dust particles
usually present in the roof-tops of the buildings. Suitable filter material such as well-burnt
broken bricks or coarse sand or small sized pebbles or blue metal gravels (baby chips) shall
be used in the filter chamber. The surplus water available after filling the storage tank/sump
shall be diverted to the nearby open well or bore well or recharge pits. Proper disinfection
shall be made while storing the water for long use.
(b) Recharging the open well/bore well.— The rain water collected from the roof
tops of both tiled/sloped roof and flat/ RCC (Reinforced concrete cement) roofs using gutters
or PVC (Poly vinyl chloride) pipes shall be diverted to the open well or bore well through a
filter chamber of appropriate size. Regular disinfection methods are to be practised while
harvesting rain water in open wells.
(ii) Harvesting surface run-off water.— Apart from the roof-top rain water harvesting,
the rain water available in the open spaces around the buildings and in places/buildings where
a sump or open well or bore well is not available the rain water shall be harvested and
recharged into the ground using appropriate recharge structures based on the nature of the
sub-soil conditions as mentioned below:
48
THE CHENNAI METROPOLITAN AREA GROUND WATER (REGULATION) RULES, 1988
(a) Sandy sub-soil areas.— In places where the sub-soil formation is sandy in nature the
rate of percolation of rain water will be more and therefore provision of shallow recharge
structures such as percolation/recharge pits, recharge trenches or shallow recharge wells are
considered to be suitable for rain water harvesting.
(i) Percolation/recharge pits shall be provided around the buildings with minimum size
of 1 metre x 1 metre x 1 metre and filled with permeable medium such as broken bricks or
pebbles or coarse sand, etc. The number of these pits shall vary based on the extent of the
area of water collection. On an average one unit is required for an area 250 square feet. These
structures are suitable for individual houses in genera;.
(ii) Recharge trenches (longitudinal in shape) similar to the percolation/recharge pits
are suitable for apartment/commercial complexes, where the availability of rain water is
more. Two or three of these structures shall be provided on the basis of the extent of the
building.
(iii) Shallow recharge wells are similar to the common open wells except in size and
dept. Normally, for an individual house with 1000 square feet area, a recharge will 1.0 metre
dia and 3.0 metre dia depth is required. For apartments/commercial complexes two or three
recharge wells are required based on the extent of the building. Either brick wall or
RCC(Reinforced concrete cement) slab. Recharge wells are to be de-stilted once in a year or
two for its effective recharge. Rain water collected from the roof tops of buildings and open
surfaces shall be diverted to these recharge structures through PVC (Poly vinyl chloride) pipe
line or by providing channels on the ground. These structures shall be maintained properly
for effective recharge.
(b) Clay sub-soil areas.— In places where the sub-soil formation is clay in nature the
rate of percolation of rain water will be very slow and therefore provision of
percolation/recharge pit with bore, recharge trench with bore or deep recharge pit with bore,
recharge trench with bore or deep recharge well are considered to be suitable for rain water
harvesting.
(i) Percolation/recharge pit with bore.— It is similar to the one mentioned in sandy
sub-soil formation except a bore hole at the bottom of the percolation pit which is also filled
with the same permeable
49
THE CHENNAI METROPOLITAN AREA GROUND WATER (REGULATION) RULES, 1988
materials. A minimum size of 4½ inch diameter and 15 feet depth is normally required for
one pit. However, if sand formation is available below the top clay layer, the bore has to be
drilled preferably upto the sand formation. The number of these pits shall vary based on the
extent of the area of water collection. On an average one unit is required for an area of 250
square feet. These structures are suitable for individual houses in general.
(ii) Recharge Trench with Bore.— These are similar to the recharge pits but are
longitudinal in shape and bore holes shall be provided at the bottom for every 10-15 feet of
the trench. The trench and bore hole shall be filled with the same permeable materials such
as broken bricks or pebbles or coarse sand, etc. These structures are structures are suitable
for apartments/commercial complexes where the availability of rain water is more.
(iii) Deep/large recharge wells.— These are similar to the common open wells except in
size and depth and are considered to be suitable for apartment/commercial complexes. In
general, a recharge well with 1.5 metre dia and 5.0 metre depth is required for a small
apartment. Either brick wall or RCC (Reinforced concrete cement) concrete rings shall be
used for construction. The top of the recharge well should be covered with RCC (Reinforced
concrete cement) slab. The recharge well shall be de-silted once in a year or two for effective
recharge. Rain water collected from the roof tops of the buildings and open surfaces shall be
diverted to these recharge structures through PVC (Poly vinyl chloride) pipe line or by
providing channels on the ground. These structures should be maintained properly for
effective recharge.
(c) Hard rock areas (Weathered).— In hard rock areas also, the rate of percolation of rain
water will be slow. Therefore, in order to collect and recharge the rain water it would be
preferable to construct recharge wells of appropriate size. Percolation pit with deep bore
holes upto a depth of 50-100 feet shall be provided. In this case, the bore hole is to be
constructed with slotted pipe for effective recharge.
In general, constructions of separate recharge structures shall be provided in the
absence of existing infrastructure such as storage tank/sump, open well or bore well in order
to reduce the cost involved.]
50
THE CHENNAI METROPOLITAN AREA GROUND WATER (REGULATION) RULES, 1988
Previous and next
← Rule 4Application for licence to extract, use or transport of groundwaterRule 6 →Appellate authority
All provisions of Chennai Metropolitan Area Ground (Regulation) Rules, 1988
Questions people ask
Is rule 5 of Chennai Metropolitan Area Ground (Regulation) Rules, 1988 still in force?
No repeal of Chennai Metropolitan Area Ground (Regulation) Rules, 1988 is recorded.