Rule 26, MINERAL CONSERVATION AND DEVELOPMENT RULES, 1988: Stoping of vein, etc
MINERAL CONSERVATION AND DEVELOPMENT RULES, 1988 - Rule 26
Text of rule 26
Stoping of vein, etc.
26. Stoping of vein, etc. :- (1) No stoping shall be commenced, conducted or carried out
except with prior permission in writing of the Controller General, or the authorised officer.
(2) The owner, agent, mining engineer or manager of every mine shall send to the
Controller General, Controller of Mines and the Regional Controller under registered cover a
notice in Form-E intimating his intention to commence the stoping of any vein, lode, reef or
mineral deposit, so as to reach them at least sixty days before the date of commencement of such
operations.
(3) Such notice shall be accompanied by plans and sections on a scale of not less than
1 cm = 10 metres showing the details of the block proposed to be stoped, the manner of stoping,
the mineralised and barren zones indicating estimated percentages recovery from stopes :
Provided that the Controller General
1
[or the Chief Controller of Mines, as the case may
be,] may, by an order in writing and subject to such conditions as he may specify therein, permit
or require the plans and sections to be prepared on any other suitable scale.
(4) The Controller General or the authorised officer may by an order in writing made
before the proposed date of commencement of stoping operations prohibit the stoping or allow it
to be done under such conditions as may be specified in the order.
______________________________________________________________________________
1 Inserted by G.S.R. 55 (E), dated 17.1.2000.
18
CHAPTER – IV
Plans and Sections
Previous and next
All provisions of MINERAL CONSERVATION AND DEVELOPMENT RULES, 1988
Questions people ask
Is rule 26 of MINERAL CONSERVATION AND DEVELOPMENT RULES, 1988 still in force?
No repeal of MINERAL CONSERVATION AND DEVELOPMENT RULES, 1988 is recorded.