Rule 28, Mineral conservation and Development Rules, 1988: Types of plans and sections
Mineral conservation and Development Rules, 1988 - Rule 28
Text of rule 28
Types of plans and sections
28. Types of plans and sections :-
(1) The owner, agent, mining engineer or manager of every mine shall keep the following
plans and sections -
(a) a surface plan showing every surface feature within the mining lease boundaries,
such as building, telephone, telegraph or power transmission line, watermain,
tramline, railway, road, river, water-course, reservoir, tank, bore-hole, shaft and
incline opening, opencast working, dumps and dumping ground, the waste land,
forest, sanctuaries, agricultural land and grazing land and subsidence on the
surface;
(b) a surface geological plan of the area of leasehold, on a scale specified or
approved by the Controller General by a general or special order in writing
showing-
(i) all the lithological units exposed in the area, in the pits, trenches and in
any other openings made for prospecting and mining operations showing
contact between lithological units;
(ii) structural details like strike, dip, fold, fault, plunge of ore body;
(iii) location of prospecting pits, trenches, boreholes and any other openings
made for prospecting and/or mining operations;
(iv) existing mine workings, dumps.
(c) a transverse section or sections of the workings through the shaft or shafts and
main adits indicating clearly the strike and dip of the vein, lode, reef, or mineral
bed or deposit at different points, and such sections of the strata sunk or driven
through in the mine or proved by boring, as may be available;
(d) a longitudinal mine section or sections showing a vertical projection of the mine
workings including outlines of all stoped out areas, where a reef, vein, lode or
mineral bed/deposit or part thereof has dip exceeding thirty degrees from the
horizontal plane :
Provided that, with the permission in writing of the Controller General
1
[or the Chief
Controller of Mines, as the case may be,] and subject to such conditions as he may specify
therein, such sections may be prepared in relation to any other suitable plane.
(e) an underground plan showing -
(i) the position of the workings of the mine below ground;
______________________________________________________________________________
1 Inserted by G.S.R. 55 (E), dated 17.1.2000.
20
(ii) every borehole and shaft (with depth), drive, cross-cut, winze, raise,
excavation (stoped ground) and every tunnel and air passage connected
therewith;
(iii) every pillar or block of mineral left for the support of any structure on the
surface; and underground magazines, if any;
(iv) the general strike of the veins, lodes, reefs and mineral beds or deposits;
(v) the position of every dyke, fault and other geological disturbance with the
amount and direction of throw.
(2) Whenever the underground plan referred to in clause (e) of sub-rule (1) is brought up-
to-date, the then position of the workings shall be shown by a dotted line drawn through the ends
of the workings, and such dotted line shall be marked with the date of the last survey :
Provided that the Controller General
1
[or the Chief Controller of Mines, as the case may
be,] may, by an order in writing and subject to such conditions as he may specify therein approve
any other method of showing the up-to-date position of the workings of the mine.
(3) Where different reefs, lodes, veins or mineral beds or deposits overlie or run parallel
to one another, the workings of each reef, lode, vein or mineral bed or deposit shall be shown on
separate plan and/or longitudinal section or sections; however if two reefs, lodes, veins or
mineral beds or deposits are so situated in relation to each other that the parting between
workings made therein is less than ten metres at any place, such workings shall also be shown on
a combined plan and/or longitudinal section, as the case may be, in different colours.
(4) The plans kept under clauses (a) and (e) of sub-rule (1) shall also show the settled
boundary of the mining lease, or where the boundary is in dispute, the boundaries claimed by the
owner of the mine and by the owners of the mines adjacent to the disputed boundary :
Provided that where it is not possible to show the complete boundary of leasehold on the
same plan an additional key plan on any other suitable scale showing such boundaries and the
outline of the workings shall also be maintained.
(5) The owner, agent, mining engineer or manager of every mine shall keep the
following :
(a) A key plan on a scale of 1: 63,000 or 1: 50,000 incorporating the following :
(i) 2
[An administrative surface map showing the boundary of the mining
lease, and the adjoining area lying preferably within five kilometres
thereof;]
(ii) Contours at not more than
3
[twenty] metres intervals;
______________________________________________________________________________
1 Inserted by G.S.R. 55 (E), dated 17.1.2000. 2 Substituted by G.S.R. 55 (E), dated 17.1.2000.
3 Substituted by G.S.R. 22 (E), dated 11.1.2002.
21
(iii) Natural drainage system such as rivers, streams, nalahs, water reservoirs,
ponds, lakes, irrigation dams and canals;
(iv) Roadways and railways;
(v) Places of historical and archaeological importance, monuments, places of
worship, pilgrimage and of tourist interest;
(vi) Forests with tree density, sanctuaries, wastelands, agricultural lands,
grazing lands;
(vii) Boundaries of all villages and towns with their population;
(viii) Predominant wind direction;
(ix) Any other relevant features.
Provided that where topographical map is classified as restricted, the particulars referred
to in items (i) to (ix) shall be incorporated in the key plan to the extent available in the
administrative
1
[surface] maps.
(b) An environment plan of the area of mining lease inclusive of the adjoining area
within five hundred metres of the boundary of a lease area on 1 : 5000 scale incorporating the
following :
(i)
2
[An administrative surface map showing the boundary of the mining
lease;]
(ii) Contour lines at five metres intervals;
(iii) All features indicated in sub-clauses (iii) to (ix) of clause (a) above;
(iv) Area occupied by mine workings, area deforested, area covered by dump
with the height of the dump, processing plant, surface building, workshop,
mining township;
(v) Area reclaimed and area afforested, location of protective barriers, check
dams erected to contain solid and liquid effluents generated by
prospecting, mining, beneficiation or metallurgical operations carried out
in the mine;
(vi) All pumping stations and the courses of discharge of mine water.
Provided that the particulars with regard to items (ii), (iv) and (v) shall be applicable only
upto sixty metres beyond the boundary of lease area.
______________________________________________________________________________
1 Inserted by G.S.R. 55 (E), dated 17.1.2000. 2 Substituted by G.S.R. 55 (E), dated 17.1.2000.
22
(6) (a) The Controller General may, by an order in writing, require such additional
details to be shown on the plans and sections required to be kept under these rules or the
preparation and maintenance of such plans and sections showing such details and on such scale
and within such time as he may specify in the order.
(b) The Controller General or the authorised officer may, by an order in writing, require
the owner, agent, mining engineer or manager of a mine to submit to him within such time, such
plans and sections, or tracings thereof, as he may specify in the order.
Previous and next
← Rule 27General requirements about plans and sectionsRule 29 →Copies of plans and sections to be submitted
All provisions of Mineral conservation and Development Rules, 1988