Rule 4, Mineral conservation and Development Rules, 1988: Scheme of prospecting
Mineral conservation and Development Rules, 1988 - Rule 4
Text of rule 4
Scheme of prospecting
4. Scheme of prospecting : -
(1) Every holder of a prospecting licence shall submit to the Controller General and the
Regional Controller or the authorised officer within a period of 60 days from the date of
execution of the prospecting licence, a scheme of prospecting indicating the manner in which he
proposes to carry out the prospecting operations, in the area covered by the licence and in
particular: -
(a) particulars of the area;
(b) the scale of the plan and the area of geological mapping;
(c) the number of pits, trenches, and bore holes which he proposes to put in the area;
(d) the particulars of the machines to be used;
(e) the details of exploratory mining,
1
[ if any, proposed] to be undertaken;
(f) the number of samples proposed to be drawn and analysed;
(g) the beneficiation studies proposed to be undertaken; and
(h) any other matter relevant for the preparation of a scheme of prospecting, as
directed by the Controller General or the authorised officer from time to time by a
general or specific order.
(2) Notwithstanding anything contained in sub-rule (1) a scheme of prospecting, shall
include: -
(a) baseline information of prevailing environmental conditions before the beginning
of the prospecting operations;
(b) 2
[steps proposed to be taken for protection of environment which will include]
prevention and control of air and water pollution, progressive reclamation and
rehabilitation of the land disturbed by the prospecting operations, a scheme for the
plantation of trees, and such other measures, as may be directed from time to time
by the Controller General or the authorised officer for minimising the adverse
effect of prospecting operations on the environment.
(3) The prospecting scheme under sub-rule (1) shall be prepared by a recognised person
or a geologist or a mining engineer employed under clause (a) of sub-rule (1) of rule 42.
Previous and next
← Rule 3ESubmission of reports about reconnaissance operationsRule 5 →Modification of scheme of prospecting
All provisions of Mineral conservation and Development Rules, 1988
Questions people ask
Is rule 4 of Mineral conservation and Development Rules, 1988 still in force?
No repeal of Mineral conservation and Development Rules, 1988 is recorded.