Form F-5, Mineral conservation and Development Rules, 1988: FORM F-5
Mineral conservation and Development Rules, 1988 - Form F-5
Text of form F-5
FORM F-5
FORM F-5
For the month of ________20
MONTHLY RETURN
[See rule 45(5) (a) (v)]
(Read the instructions carefully before filling the particulars)
To
(i) The Regional Controller of Mines
Indian Bureau of Mines
_________Region,
PIN:
(Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the
Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development rules, 1988)
(ii) The State Government
PART – I
(General and Labour)
1. Details of the Mine:
(a) Registration number allotted by Indian Bureau of Mines (to give
registration number of the mine owner/ agent/ mining engineer/ manager
signing the return)
b) Mine Code
c) Name of the Mineral Copper/Gold/Lead/Pyrites/Tin/Tungsten/Zinc
d) Name of Mine
e) Name(s) of other mineral(s),
if any, produced from the same mine
f) Location of the Mine :
Village
Post Office
Tahsil/Taluk
District
State and PIN Code
Fax no: E-mail:
Phone no:
2. Name and Address(s) of Lessee/Owner (along with fax no. and e-mail):
Name of Person
Street/Village
Post Office
Tahsil/Taluk
District
State and PIN Code
Fax no: E-mail:
Phone No:
3. Details of Rent/ Royalty / Dead Rent paid in the month
(i) Rent paid for the period (Rs.)
(ii) Royalty paid for the period (Rs.)
(iii) Dead Rent paid for the period (in Rs)
4. Details on working of mine:
(i) Number of days the mine worked:
(ii) Reasons for work stoppage in the mine
during the month (due to strike, lockout,
heavy rain, non-availability of labour,
transport bottleneck, lack of demand,
uneconomic operations, etc.) and the number of days of work
stoppage for each reason separately
Reasons No of days
71
5. (i) Average Daily Employment and Wages paid:
Work place
Direct Contract Wages (Rs.)
Male Female Male Female Direct Contract
Below ground
Opencast
Above ground
Total
5.(ii) Total number of technical and supervisory staff employed in the mine during the month :___________________
(iii) Total salaries paid to technical and supervisory staff employed in the mine during the month in Rs.__________________
PART-II (PRODUCTION, DESPATCHES AND STOCKS)
(Unit of Quantity in Tonnes; indicate unit of quantity if not in tonnes.)
1. Production and Stocks of R.O.M. ore
Opening stocks Production Closing stocks
Quantity Metal content/
grade
Quantity Metal content/
grade
Quantity Metal content/
grade
A. From
Underground
workings
i) From development
ii) From Stoping
B. From Opencast
workings
Total
2. Ex-mine price of the ore produced (Rs. per unit):
3. Recoveries at Concentrator/Mill/Plant: (Quantity in tonnes & Value in Rs.)
Opening stocks of the Ore at
concentrator/Plant
Ore received from the mine Ore treated
Quantity Metal content/grade Quantity Metal content/grade Quantity Metal content/grade
Concentrates * Obtained Tailings Closing stocks of concentrates the
concentrator/Plant
Quantity Value Metal
content/grade
Quantity Metal
content/grade
Quantity Metal
content/grade
*In case of any leaching method adopted, give quantity recovered and grade contained separately.
4. Recovery at the Smelter/Mill/Plant:-
Opening Stocks of the
concentrates at the smelter
/Plant
Concentrates received from
concentrator/Plant
Concentrates received
from other sources
(specify)
Concentrates sold (if any)
Quantity Metal content/
grade
Quantity Metal content/
grade
Quantity Metal
content/
grade
Quantity Metal content/
grade
Concentrates treated Metals(*) recovered(specify) Other by-products ,if any,
recovered
Closing stocks of
concentrate at the
Smelter/Plant
Quantity Metal content/
grade
Quantity Value Grade Quantity Value Grade Quantity Value
I I
72
5. Sales during the month:-
Opening stocks of metals/Products 1[Place
of Sale]
Metals/Products sold(@)
Closing stocks of
Metals/Products
Quantity Grade Quantity Grade Value(#) Quantity Value
Note:
(*) Please give category-wise break-up viz. blister, fire refined copper, cathodes, electrolytic copper wire bars, lead ingots, zinc cathodes,
zinc dross, gold, tungsten etc.
(#) Please give ex-plant sale value including excise duty but excluding other taxes.
(@) Please give category-wide break-up of metals and other products sold.
6. Details of Deductions used for computation of Ex_mine price of ore (Rs/unit)
Deduction claimed Unit ( in Rs/unit) Remarks
a) Cost of transportation
(indicate Loading station and Distance from
mine in remarks)
b) Loading and Unloading charges
c) Railway freight ,if applicable
(indicate destination and distance)
d) Port Handling charges/export duty(indicate
name of port)
e) Charges for Sampling and Analysis
f) Rent for the plot at Stocking yard
g) Other charges(specify clearly)
Total (a) to (g)
7. Sales/ Despatches effected for Domestic Consumption and for Exports:
Grade*
Nature of
Despatch
(indicate
whether for
1[ Sale] or
Captive
consumption or
Export)
For Domestic Consumption For export
Consignee name and
Registration number as
allotted by the Indian
Bureau of Mines to the
buyer ##
Quantity Sale value Country Quantity F.O.B
Value
(Rs.)
*This includes ore as well as concentrates.
## Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer
(to indicate separately if more than one buyer) for the top five despaches in terms of Quantity,for the remaining consolidated figure shall be
reported with details of despatches as annexure.
NOTE:- Mine owners are required to substantiate domestic sale value/ FOB value for each grade of ore quoted above with copy of invoices.
8. Give reasons for increase/decrease in production/nil production (of primary or associate mineral), if any, during the month compared
to the previous month.
a)
b)
c)
9. Give reasons for increase/decrease in grade wise ex-mine price (of primary or associate
Mineral),if any, during the month compared to the previous month.
a)
b)
c)
I certify that the information furnished above is correct and complete in all respects.
Place: Signature
Date: Name in full:
Designation: Owner/Agent/Mining Engineer/Manager
1 Inserted by G.S.R. 55(E), dated 17.1.2000
73
Previous and next
All provisions of Mineral conservation and Development Rules, 1988
Questions people ask
Is form F-5 of Mineral conservation and Development Rules, 1988 still in force?
No repeal of Mineral conservation and Development Rules, 1988 is recorded.