Amendments in the Environment Impact Assessment notification, 2006 issued vide no. S.O. 1533 (E), dated the 14th September,2006, dated 01.12.2009
Notification - THE ENVIRONMENT (PROTECTION) ACT, 1986
- Kind: Notification
- Under: THE ENVIRONMENT (PROTECTION) ACT, 1986
Text of this notification
t6 T'llE GAZETTE OF INDI.A : EXTRAORDE{ARY Perr Il--Src. 3(ii)
MINISTRY OF ENVIRONMENT AIID FORESTS
NOTIFICAIION
New Delhi, the lst Doccmber,2009
Now, therefore, in exercise of the powers conferred by sub-section (1) and
clause (v) of sub-section (2) of section 3 of the Environment (Protection) Act, 1986,
read with clause (d) of sub-rule (3) of rule 5 of the Environment (Protection) Rules,
1986, the Central Government hereby makes the following amendments in the said
notification, namely:-
In the said notification, -
in para 3, for sub-para (7), the following shall be substituted,
namely:-
"(7) All decisions of the SEIAA shall be taken in a meeting and shall
ordinarily be unanimous:
Provided that, in case a decision is taken by majority, the details of views,
for and against it, shail be clearly recorded in the minutes and a copy
thereof sent to MoEF."
II in para 4, in sub-para (iii), for the words and letters "ln the absence of a
duly constituted SEIAA or SEAC, a Category 'B' project shall be treated as a
Category 'A' project", the words and letters "ln the absence of a duly
constituted SEIAA or SEAC, a Category 'B' project shall be considered at the
Central Level as a Category 'B' project" shall be substituted.
I
s.o'3067(E).- Whereas, in exercise of the powers conferred by sub-section (t) .
and clause (v) of sutrsection (2) of section 3 of the Ehvironment (Protection) Act,
1986 (29 of 1986), a draft notification for making certain amendments in the
Environment Impact Assessment notiflcation, 2006 issued vide no. S.O. 1533 (E),
dated the 14s September,2006, was published under sub-rule (3) of rule 5 ofthe
Environment (Protection) Rules, 1986, vide number S.O. 195 (E), dated the 19h
.January, 2009, inviting objections and suggestions from all the persons likely to be
affected thereby, within a period of 60 days from the date of publication of the said
notification in the Gazette of India;
And whereas, all objections and suggestions received in response to the
above mentioned 'draft notification have been duly considered by thb Central
Govemment;
I qm rr-str's 3(ii) I qrfd EE.f TI!FEr : SLITETTITT l1
III in para 7(i), in sub-para III
Consultation, in clause (i),-
relating to Stage (3) Public
(i) after item (c), the following item shall be inserted, namely:-
"(cc) malntenance dredging provided the dredged material
shall be disposed within port limits.,,;
(ii) for item (d), the following item shall be substituted, namely:-
"(d) All Building or Construction projects or Area Development
projects (which do not contain any category 'A' projects and
activities) and Townships (item 8(a) and 8(b) in the Schedule to
the notification ). ".
ry [n para 10 relating to Post Environmental Clearance Monitoring,-
(a) the existing sub-para (i) shall be renumbered as sub-para (ii) and
before sub-para (ii) as so re-numbered, the following sub-para shall be
inserted namely;
In res
oF Category D ects, irres ective of its clearance the
proponent shall prominently vertise in the news rs indicati n9
that the project has been accorded envtronmen earance and the details oF
MoEF website where it is displayed. (c) The Ministry of Environment and
Forests and the State/Union Territory Level Environmental Impact
Assessment Authorities (SEIAAS), as the case may be,
environmental clearance in the public domain on Government rtal. (d) The
opies 0ftheenvr n c earance shall be submitted the ect
50 oca tes Pa M nrcl ies i
on re an o rces the Government who in turn has to ispl
e safile for 30 days from e ate oF receipt.";
(b) existing sub-para (ii) shall be renumbered as sub-para (iii).
V in the Schedule,-
(i) for item 1(a) and'the entries relating thereto, the following
item and entries shall be substituted, namely:-
\ zt t C-y 1.1 -3
F
4ho
shall also place the
AL-
z'
I
"(i) (a) In respect of Category'A'projects, it shall be mandatory for the
project proponent to make public the environmental cleararrce granted for
their project along with the environmental conditions and safeguards at their
cost by prominently advertising it at least in two local newspapers of the
district or State where the project is located and in addition, this shall also
be displayed in the project proponent's website permanently. (b)
ltt Tm G.{ZE n'E OF INDIA ; EXTRAORDINARY [PART I I--S[c- 3(ii)l
" 1(a)
3
of >50 ha of mining
llease area in
respect of non-coal
mine lease.
4
<50 ha >5 ha of
mining lease area
in respect of non-
coal mine lease,
General
Condition
shall apply.
Note: Mineral
prospecting is
exempted,";
5
(i)Mining
minerals.
>150 ha of
mining lease area
in respect of coal
mine lease.
I
L__
Asbestos mining
irrespective of
mining area.
(ii)Slurry pipelines
(coal lignite and
other ores) passing
through national
parks/ sanctuaries/
coral reefs,
ecologically sensitive
areas.
All projects.
(ii) against item 1(c), for the entries in column (5), the following
entries shall be substituted, namely;-
"General Condition shall aPply.
Note: Irrigation projects not involving submergence or inter-state
domain shall be appraised by the SEIAA as Category'B' Projects.";
(iii) against item 1(d),-
(a) in column (3), for the entries, the following entries shall be
substituted, namely-
">- 500 MW (coal/lignite/naphtha and gas based);
> 50 MW (Pet coke, diesel and all other fuels including refinery
residual oil waste except biomass);
I (1) I (2)
| .tso n, .s r,u
I of mining lease
larea in respect
I of coal mine
llease.
I
l
I
I
I
I
I
i qrrr II-€Te t(ii) l ql-fd 6I Trqqjl : 3ITlTuTrsT
z 20 MW (basecl on biomass or non hazardous municipal solid waste
as fuel).";
(b) in column (4), for the entries, the following entries shall be
substituted, namely:-
"<500MW (coal/lignite/naphtha and gas based);
<50 MW > 5 MW (Pet coke, diesel and all other fuels including refinery
residual oil waste except biomass);
<20MW > 15MW (based on biomass or non hazardous municipal solid
waste as fuel).";
(c) in column (5), for the entries, the following entries shall be
substituted, namely:-
"General Condition shall apply.
Note:
(i) Power plants up to 15 MW, based on biomass and using
auxiliary fuel such as coal / lignite / petroleum products up to
150/o are exempt.
Power plants up to 15 MW, based on non-hazardous municipal
waste and using auxiliary fuel such as coal / lignite / petroleum
products up to 15olo are exempt.
Power plants using waste heat boiler without any auxiliary fuel
are exempt. ";
( ii)
(iii)
"General condition shall apply
Note:
(i) The recycling industrial units registered under the HSM Ruies,
are exempted.
In case of secondary metallurgical processing industrial units,
those projects involving operation of furnaces only such as
induction and electric arc furnace, submerged arc furnace, and
cupola with capacity more than 30,000 tonnes per annum (TPA)
would require environmental clearance.
Plant / units other than power plants (given against entry no.
1(d) of the schedule), based on municipal solid waste (non-
hazardous) are exempted.".
( ii)
( iii)
Ug2qt/o9 -tl
t9
(iv) against item 3(a), in column (5), for the entries, the following
entries shall be substituted, namely:-
;0 THE GAZETTE OF INDIA : EXTRAORDINARY P^Rr ll-SEc. 3(ii)l
(v) against atem 4(b), in column (5), for the entry, the following
entry shall be substituted, namely:-
"General conditions shall apply.";
(vi) agaanst item 4(d),-
(a) in column (4), for the entry, the following entry shall be
substituted, namely:-
"(i) All projects irrespective of the size, if it is located in a Notified
Industrial Area/Estate.
(ii) < 300 tonnes per day CIPD) and located outside a Notifled Industrial
Area/ Estate.";
(b) in column (5), for the entry, the following entry shall be
substituted, namely:-
"General as well as specific conditions shall apply.
No new Mercury Cell based plants will be permitted and existing units
converting to membrane cell technology are exempt from the
notification.";
(vii) against item 4(f), in column (5), for the eristing entry, the
following entry shall be substituted, namely:-
"General as well as specific conditions shall apply.";
(viii) against item 5(a),-
(a) in column (3), for the eristing entry, the following entry
shall be substituted, namely:-
'All projects except Single Super Phosphate.";
(b) in column (4), tor tlre entry, the following entry shall be
substituted, namely:-
"Single Super Phosphate.";
I qltr rr -Efs 3(iD ] rIFd 6,I Tfqq? : 3{gfERqI 2l
(ix) against item S(e)r in column (5)r for the existing entry, the
following entry shall be substihrted, name$:-
"General as well as specific conijitions shall apply,";
(x) against itcm 5(Q, in column (5), for tfte existing entry, the
following entry shall be substituted, namely:-
"General and specific conditions shall apply." ;
(xi) item 5(k) and the entries relating thereto shall be omitted;.
(rii) against item 7(a),-
(a) in column (3), for the entry, the following entry shall be
substituted, namely:-
"All projects including airstrips, which are for commercial use.";
(b) in column (5), for the entry, the following entry shall be
substituted, namely:-
"Note:
Air strips, which do not involve bunkering/ refueling facility and or Air
Traffic Control, are exempted.";
(xiii) against item 7(c), in column (5), for the entry, the following
entry shall be substituted, nanrely:-
"General as well as specific conditions shall apply.
Note:
1. Industrial Estate of area below 500 ha. and not housing any
industry of Category'A'or'B'does not require clearance.
If the area is less than 500 ha. but contains building and
construction projects > 20,000 Sq, mtr. and or development
area more than 50 ha it will be treated as activity listed at serial
no. 8(a) or 8(b) in the Schedule, as the case may be.";
2
THE GAZETTE OF INDIA : EXTRAORDINARY IPARr I
(riv) against item 7(e),-
(a) in column (2), tor the entry, the following entry shall be
substituted, namely:-
"Ports, harbours, break waters, dredging."
(b) in column (5), for the entry, the following entry shall be
substituted, namely:-
"General Condition shall apply.
Note:
1. Capital dredging inside and outside the ports or harbors and
channels are included;
2. Maintenance dredging is exempt provided it formed part of the
original proposal for which Environment Management Plan (EMP)
was prepared and environmental clearance obtained.";
(xv) against item 7(f),
(a) in column (4), for the entry, the following entry shall be
substituted namely:-
"(i) All State Highway Projects; and
(ii) State Highway expansion projects in hilly terrain (above
1,000 m AMSL) and or ecologically sensitive areas.";
(b) an column (5) for the existing entry, the following entry
shall be substituted, namely:-
"General Condition shall apply.
Note:
Highways include expressways.";
(xvi) against item 7(g),-
(a) in column (3), for the entry, the following entry shall be
substituted, namely:-
I rrFr II -Errs 3(ii) ] rTrf, i6I TIII(r;I ; }Rltqrul 23
All projects located at altitude of 1,000 mtr. and above.
All projects located in notified ecologically sensitive areas.";
(b) in column (4), for the entry, the following entry shall be
substituted, namelyl-
"All projects except those covered in column (3).";
Any poect or activity specified in Category 'B' will be treated as
Category 'A', if located in whole or in part within 10 km from the
boundary of: (i) Protected areas notified under the Wildlife (Protection)
\d, 1972; (ii) Critically polluted areas as identified by the Central
Pollution Control Board from time to time; (iii) Eco-sensitive areas as
notified under section 3 of the Environment (Protection) Act, 1986,
such as, Mahabaleshwar Panchgani, Matheran, Pachmarhi, Dahanu,
Doon Valley, and (iv) inter-State boundaries and international
boundaries:
Provided that the requirement regarding distance of 10 km of
the inter-State boundaries can be reduced or completely done away
with by an agreement between the respective States or U.Ts sharing
the common boundary in .case the actiiity does not fall within 10
kilometres of the areas mentioned at item (i), (ii) and (iii) above."
VI in the Appendix I, in Form I,-
(a) for item (I) relating to the Basic Information, the following
shall be substituted, namely:-
Serial Item Details
ber
ec
"(i)
(ii)
I
S
2.
472qtloe-s
(xvii) after the Schedule, in the 'Note', for sub-heading relating to
'General Conditiori (GC)', the following shall be substituted,
namely:-
"General Condition (GC):
"(I) Basic Information
1.
S. No. in the schedule
Name of the
21 l Ht GAZEl-rE OF TNDIA : 0XTRAORDtNARy Rr Il-Sric.l(iiil
J Proposed capacity/area/length/tonnage to be
handled/command area/lease area/number of
wells to be drilled
I
9
I
L2, Mllage Panchayats, Zilla Parishad, Municipal
Corporation, Local body (complete postal
addresses with telephone nos. to be given)
13 Name of the applicant
14. Re istered Address
Fax No,
16. Details of Alternative Sites examined, if any.
Location of these sites should be shown on a
topo sheet.
Interlinked Projects
18. Whether separate application of interlinked
ro ect has been submitted?
If yes, date oF submission
20. f no, reason
4 New/ nsto Modernization
5 Existin cr Area etc.Ca
6
7 Does it attract the general condition? If yes,
Does it attract the specific condition? If'yes,
ease s
Plot/Surve Khasra No.
Villa e
lease s ifv
Ca of Proiect i.e. 'A'or'B'
Tehsil
Location
District
State
10.
11.
Nearest railway station/airport along with
distance in kms.
Nearest Town, city, District Headquarters
along with distance in kms.
Address for corres ondence:
Desi CEOnation Owner Partner
Tele hone No.
Name
E-ma il
Address
Pin Code
15.
Village-District-State
1
2
3
I
I
t7.
19.
-L
I
qlfd 6T TErq:r i 3{t[Iql{ul
21, Whether the proposal involves
approval/cleara nce under: if yes, details of the
same and their status to be given.
(a) The Forest (Conservation) Act, 1980 ?
(b) The Wildlife (Protection) Act, 19i2 ?
c The C.R.Z Notification , t991?
is any Government
relatin to the site?
Forest land involved (hectares)
24. Whether there is any litigation pending
against the project and/or land in which the
project is propose to be '.et up?
(a) Name of the Court
(b) Case No.
(c) Orders/directions of the Court, if any and
its relevance with the propg_siq ct.
(b) the following shall be inserted at the end, namely:-
"I hereby given undertaking that the data and information given in the
application and enclosures are true to the best of my knowledge and belief and I am
aware that if any part of the data and information submitted is found to be false or
misleading at any stage, the project will be rejected and clearance give, if any to the
project will be revoked at our risk and cost.
Date:
Place:
Signature of the applicant
With Name and Full Address
(Project Proponent / Authorised Signatory)
NOTE:
1. The projects involving clearance under Coastal Regulation Zone Notification,
1991 shall submit with the application a C.R.Z map duly demarcated by one
of the authorized agencies, showing the project activities, w.r.t. C.R.Z (at the
stage of TOR) and the recommendations of the State Coastal Zone
Management Authority (at the stage of EC). Simultaneous action shall also be
taken to obtain the requisite clearance under the provisions of the C.R,Z
Notification, 1991 for the activities to be located in the CRZ.
The projects to be located within 10 km of the National Parks, Sanctuaries,
Biosphere Reserves, Migratory Corridors of Wild Animals, the project
proponent shall submit the map duly authenticated by Chief Wildlife Warden
showing these features vis-i-vis the project location and the
Whether
Order/Poli
there
releva
2
22
23.
I qrq ll -Eru-s J(ii) ]
I
I
I
I
I
l
76 THE (;AZETTE Ot INDIA : EXTRAORITINARY IP.\R r II-SEC. 3(ii)
recommendations or comments of the Chief Wildlife Warden'thereon (at the
stage of EC)."
All correspondence with the Ministry of Environment & Forests including
submission'of application for TOR/Environmental Clearance, subsequent
clarifications, as may be required from time to time, participation In the EAC
Meeting on behalf of the project proponent shall be made by the authorized
signatory only. The authorized signatory should also submit a document in
support of his claim of being an authorized signatory for the specific project.,,.
VII for Appendir IV, the following shall be substituted, namely:-
PROCEDURE FOR CONDUCT OF PUBLTC HEARING
1.0 The Public Hearing shall be arranged in a systematic, time bouhd and
transparent manner ensuring widest possible public participation at the project
site(s) or in its close proximity District-wise, by the concerned State Pollution
Control Board (SPCB) or the Union Territory Pollution Control Committee
(urPcc).
2.O The Processl
2.1 The applicant shall make a request through a simple letter to the
Member Secretary of the SPCB or Union Territory Pollution Control Committee, in
whose jurisdiction the project is located, to arrange the public hearing within the
prescribed statutory period. In case the project site is covering more than one
District or State or Union Territory, the public hearing is mandated in each
District, State or Union Territory in which the project is located and the applicant
shall make separate requests to each concerned SPCB or UTPCC for holding the
public hearing as per thls procedure.
2.2 The applicant shall enclose with the letter of request, at least 10 hard
copies and an equivalent number oF soft (electronic) copies of the draft EIA
Report with the generic structure given in Appendix III including the Summary
Environment Impact Assessment repoft in English and in the officia! language
of the state/local language, prepared strictly in accordance with the Terms of
Reference communicated after Scoping (Stage-2). Simultaneously the applicant
shall arrange to forward copies, one hard and one soft, of the above draft EIA
Report along with the Summary EIA report to the following authorities or offices,
within whose jurisdiction the project will be located:
(a) District Magistrate/District collector/ Deputy commissionef / s
(b) Zila Parishad or Municipal Corporation or Panchayats Union
3.
"APPENOIX ry
(See paragraph 7)
I rlm II -uu-s 31;1y 1 qI{?l t6.r rlqq? : 3tr€Tfi{uT 2'1
(c)
(d)
District Industries Office
Urban Local Bodies (ULBs) / PRIS Concerned/Devetopment
authorities
Concerned Regional Office of the Ministry of Environment and(e)
Forests
2.3 On receiving the draft Environmental Impact Assessment report, the
above-mentioned authorities except the Regional Office of MoEF, shall drrange to
widely publicize it within their respective jurisdictions requesting the interested
persons to send their comments to the concerned regulatory authorities. They
shall also make available the draft EIA Report for inspection electronically or
otherwise to the public during normal office hours till the Public Hearing is over.
2.4 The SPCB or UTPCC concerned shall also make similar arrangements
for giving publicity about the project within the State/Union Territory and make
available the Summary of the draft Environmental Impact Assessment report
(Appendix III A) for inspection in select offices or public libraries or any other
suitable location etc. They shall also additionally make available a copy of the
draft Environmental Impact Assessment report to the above five
authorities/offices as given in para 2.2.
3.1 The Member-Secretary of the concerned SPCB or UTPCC shall finalize
the date, time and exact venue for the conduct of public hearing within 7 (seven)
days of the date of receipt of the draft Environmental Impact Assessment report
from the project proponent, and advertise the same in one major National Daily
and one Regional vernacular Daily / Official State Language. A minimum notice
period of 30 (thirty) days shall be provided to the public for furnishing their
responses;
3.2 The advertisement shall also inform the public about the places or
offices where the public could access the draft Environmental Impact Assessment
report and the Summary Environmental Impact Assessment report before the
public hearing. In places where the newspapers do not reach, the Competent
Authority should arrange to lnform the Iocal public about the public hearing by
other means such as by way of beating of drums as well as advertisement /
announcement on radio / television.
3.3 No postponement of the date, time, venue of the public hearing shall
be undeftaken, unless some untoward emergency situation occurs and then only
on the recommendation of the concerned District Magistrate/District
collector/Deputy commissioner, the postponement shall be notified to the public
through the same National and Regional vernacular dailies and also prominently
displayed at all the identified offices by the concerned SPCB or Union Territory
Pollution Control Committee;
3.4 In the above exceptional circumstances, fresh date, time and venue for
the public consultation shall be decided by the Member - Secretary of the
concerned SPCB or UTPCC only in consultation with the District
,
3.0 Notice of Public Hearing:
28 T}IE GAZETTE OF INDIA : EXTRAORDINARY lP:rnr ll-Sec. 3(ii)l
tri:;Eistrate/District Collector/Deputy Commissioner and notified afresh as
per procedure under 3.1 above.
4.0 Supervision and Presiding over the Hearing:
4.1 The District Magistrate / District Collector / Deputy Commissioner or his
or her representative not below the rank of an Additional District Magistrate
assisted by a representative of SPCB or UTPCC, shall supervise and preside over
the entire public hearing process.
5.0 Videography
5.1 The SPCB or UTPCC shall arrange to video film the entire proceedings. A
copy of the videotape or a CD shall be enolosed with the public hearing
proceedings whlle forwarding it to the RegulatoryT-u$brity concerned.
6.0 Proceedings
6.1 The attendance of all those who are present at the venue sha.ll be
noted and annexed with the final proceedings.
6.2 There shall be no quorum required for attendance for starting the
proceedings.
6.3 A representative of the applicant shall initiate the proceedings with a
presentation on the project and the Summary EIA report.
6,4 Persons present at the venue shall be granted the opportunity to seek
information or clarifications on the project from the iipplicant. The summary of
the public hearing proceedings accurately reflecting all the views and concerns
expressed shall be recorded by the representative of the SPCB or UTPCC and
read over to the audience at the end of the proceedings explaining the contents
in the loca/vernacular language and the agreed minutes shall be signed by the
District Magistrate/District Collector/Deputy Commissioner or his or her
representative on the same day and forwarded to the SPCB/UTPCC concerned.
6.5 A Statement of the issues raised by the public and the comments of the
applicant shall also be prepared in the local language or the Official State
language, as the case may be, and in English and annexed to the proceedingsi
6.6 The proceedings of the public hearing shall be conspicuously displayed
at the office of the Panchyats within whose jurisdiction the project is located,
office of the concerned Zila Parishad, District Magistrate / District collector /
Deputy Commissioner, and the SPCB or UTPCC. The SPCB or UTPCC shall also
display the proceedings on its website for general information. Comments, if any,
on the proceedings, may be sent directly to the concerned regulatory authorities
and the applicant concerned.
t
I qFr tl -str-s 3(ii) I qTTA zEI TTnFEI : 3IHTSIr{UI 29
I
7.O Time period for completion of public hearing
7.7 The public hearing shall be completed within a period of forty five days
from date of receipt of the request letter from the applicant. Thereafter the SPCB
or UTPCC concerned shall sent the public hearing proceedings to the concerned
regulatory authority within eight days of the completion of the public hearing.
gimultaneously, a copy will also be provided to the project proponent,
The applicant may also directly forward .a cgpy of the approved public hearing
proceedings to the regulatory authority concerned along with the final
Environmental Impact Assessment report or supplementary report to the draft
EIA report prepared after the public hearing and public consultations
incorporating the concerns expressed in the public hearing along with action plan
and financial allocation, item-wise, to address those concerns."
7.2 If the SPCB or UTPCC fails to hold the public hearing within'the
stipulated 45 (forty five) days, the Central government in Ministry of Environment
and Forests for Category'A' project or activity and the State Government or
Union Territory Administration for Category'B'project or activity at the request of
the SIIAA, shall engage any other agency or authority to cornplete the process,
as per procedure laid down in this Notification.".
VIII in Appendix V, for para 3, the following para shall be substituted,
namely:-
"3. Where a public consultation is not mandatory, the appraisal shall be made
on the basis of the prescribed application Form 1 and EIA report, in the case of
all projects and activities other than Item B of the Schedule. In the case of
Item 8 of the Schedule, considering its unique project cycle, the EAC or SEAC
concerned shall appraise all Category B projects or activities on the basis of
Form 1, Form 1A and the conceptual plan and make recommendations on the
poect regarding grant of environmental clearance or otherwise and also
stipulate the conditions for environmental clearance.".
lNo. J-l l0l3/562004-lA. ll(l)l
G K. PANDF.Y. Advisor
Pflnred by lhe Managcr. Covernment ol lndia Prcls. Rrng Road Mayapuri New Delhi_l10064
and Pobltshcd b\ rhe Conlroller of Publrcatrons. DclhFl I0054'
Note: The principal rules were published in the Gazette of India, Extraordinary, Part
II, Section 3, Sub-section (ii) vide notification number S.O. 1533(E), dated the
14th September, 2006 and amended vide S.O. 1737(E), dated the 1lm
October, 2007.