Constitution of State Environment Impact Assessment Authority, Haryana dated 14.09.2006
Notification - THE ENVIRONMENT (PROTECTION) ACT, 1986
- Kind: Notification
- Under: THE ENVIRONMENT (PROTECTION) ACT, 1986
Text of this notification
(Published in the Gazette of India, Extraordinary, Part-II, and Section 3, Sub'section (ii)
MINISTRY OF ENVTRONMENT AND FORESTS
New Delhi 14th September, 2006
S.O. 1533 Whereas, a draft nolification under sub-rule (3) of Rule 5 of the
Environment (Protection) Rules, 19E6 for imposing certain restrictions aud prohibitions on
new projects or activities, or on the expansion or modemization of existing projects or
activities based on their potential environmenlal impacts as indicated in the Schedule to the
notification, being undertiken in any part of Indial, unless prior environmental clearancg has
been accorded in accordance with the objectives of National Environment Policy as approved
by the Union Cabinet on 18s May, 2006 and the procedure specified in the notification, by
the Central Govemment or the State or Union territory kvel Environment Impact
Assessment Authority (SEIAA), to be constituted by the Central Govemment in consultation
with the State Govemment or the Union territory Administration concerned under sub-section
(3) of section 3 of the Environment (Protection) Act, 1986 for the purpose of this notification,
was published in the Gazette of India ,Extraordinary, Part ll, section 3, sub-section (ii) vide
nurnber S.O. 1324 (E) dated the l5s September ,2005 inviting objections and suggestions from
all persons likely to be affected thereby within a period of sixty days from the date on which
copies of Gazette containing the said notification were made available to the public;
And whereas, copies of the said notitication were made available to the public on l5s
September,2005;
llncludes the teffitorial waters
And whereas, all objections and suggestions received in response to the above
mentioned draft notification have been duly considered by the Cenh"l Government;
Now, therefore, in exercise of the powers conferred by sub-section (l) and clause (v) of
sub-section (2) of section 3 of the Environment (Protection) Acr, 1986, read with clause (d)
of sub-rule (3) of rule 5 of the Environrnenr (Protection) Rules, 1986 and in supersession of
the notificarion number S.O. 60 (E) dated the 27th January, 1994, except in respecr of things
done or omitted to be done before such supersession, the central Government hereby directs
that on and from the date of its publication the required construction of new projects or
activities or the expansion or modemization of existing projects or activities liited in the
Schedule to this notification entailing capacity addition rvith change in process and or
technology shall be undertaken in any part of India only after thJ prioi environmental
clearance from the central Government or as the case may be, by the Stati lrver Environment
Impact Assessment Authority, duly constituted by the cintral dovemment under sub-section
(3) of section 3 of the said Act, in accordance with the procedure specified hereinafter in this
notification.
t4
$r'
F,,/
,lJo/
/$,,i'
C ,t/Y
-"* 0
,,
,r"" Lq
0rv
I
Notitication
1
2. Requirements of prior Environmental Clearance (EC):- The following projects or
activities shall require prior environmental clearance from the concemed regulatory authority,
which shall hereinafter referred to be as the Central Govemment in the Ministry of
Environment and Forests for matters falling under Category 'A' in the Schedule and at State
level the State Environment Impact Assessment Authority (SEIAA) for matters falling under
=9g!eW-g;n the said Schedule, before any construction work, or preparation of land by the
projccffienagement except for securing the land, is started on the project or activity:
(i) All new projects or activities listed in the Schedule to this notification;
(i0 Expansion and modernization of existing projects or activities listed in the Schedule to
this notification with addition of capacity beyond the limits specified for the concerned sector,
that is, projects or activities which cross the threshold limits given in the Schedule, after
expansion or modemization;
(iii) Any change in product - mix in an existing manufacturing unit included in Schedule
beyond the specified range.
3, State Level Environment Impact Assessment Authority:- (1) A State Irvel
Environment Impact Assessment Authority hereinafter referred to as the SEIAA shall be
constituted by the Central Government under sub-section (3) of section 3 of the Environment
(Protection) Act, 1986 comprising of th.ree Members including a Chairman and a Member -
Secretary to be nominated by the State Government or the Union territory Administration
concerned.
(2) The Member-Secretary shall be a serving officer of the concemed State Govemment or
Union territory administration familiar with environmental laws.
(3) The other two Members shall be either a professional or expert fulfilling the eligibility
criteria given in Appendix VI to this notification.
(4) One of the specified Members in sub-paragraph (3) above who is an expert in the
Environmental Impact Assessment process shall be the Chairman of the SEIAA.
(5) The State Govemment or Union tenitory Administration shall forward the names of the
Members and the Chairman referred in sub- paragraph 3 to 4 above (o the Central
Government and the Central Government shall constitute the SEIAA as an authority for
the purposes of this notiircation within thirty days of the date of receipt of the names.
(6) The non-official Member and the Chainnan shall have a fixed term of three years (from
the date of the publication of the notification by the Centrai Governnent constituting the
authority).
('1) All decisions ofthe SEIAA shall be unanimous and taken in a meeting
4. Categorization of projects and activities:-
(i) All projects and activities are broadly categorized in to two categories - Category A and
Category B, based on the spatial extent of potential impacts and potcntial impacts on human
health and natural and man made resources.
!2
!
I
(iD All projects or activities included as Category 'A' in the Schedule, including expansion
and modemization of existing projects or activities and change in product mix, shall require prior
environmental clearance from the Central Govemment in the Ministry of Environinent and
Forests (MoEF) on the recommendations of an Expert Appraisal Committee @AC) to be
constiluted by the Central Government for the purposes of this notification;
(iii) AII projects or activities included as Category 'B' in the Schedgle, including expansion
'and modemization of existing projects or activities as specified in sub paragraph (ii) of paiagraph
2, or change in product mix as specified in sub paragraph (iii) of paragraph 2, but excluding
those which fulfill the General Conditions (GC) stipulated in the Schedule, will require prior
environmental clearance from the Staterunion territory Environment Impact Assessment
Authority (SEIAA). The SEIAA shall base its decision on rhe recommendations of a State or
Union territory level Expert Appraisal Committee (SEAC) as to be constituted for in this
notification. In the absence of a duly constituted SEIAA or SEAC, a Category 'B' project shall
be treated as a Category 'A' project;
5. Screening, Scoping and Appraisal Committees:-
The same Expert Appraisal Committees (EACS) at the Central Govemment and SEACs
(hereinafter referred to as the (EAC) and (SEAC) at the State or the Union tcrritory level shall
screen, scope and appraise projects or activities in Category 'A' and Category 'B' respectively.
EAC and SEAC's shall meet at least once every month.
(a) The composition of the EAC shall be as given in Appendix VI. The SEAC at the State or
the Union territory level shall be constituted by the Central Govemment in consultation with the
concemed State Govemment or the Union territory Administration with identical composition;
(b) The Central Government may, with the prior concurence of the concemed State
Govemments or the Union tenitory Administrations, constitutes one SEAC for more than one
State or Union territory for reasons of administrative convenience and cost;
(c) The EAC and SEAC shall be reconstituted after every three years;
(d) The authorised members of the EAC and SEAC, concemed, may inspect any site(s)
connected with the project or activity in respect of which the prior environmental clearance is
sought, for the purposes of screening or scoping or appraisal, with prior notice of at least seven
days to the applicant, who shall provide necessary facilities for the inspection;
(e) The EAC and SEACs shall function on the principle of collective responsibility. The
Chairperson shall endeavour to reach a consensus in each case, and if consensus cannot be
reached, the view of the majority shall prevail.
6. Application for Prior Environmental Clearance (EC):-
An application seeking prior environmental clearance in all cases shall be made in the
prescribed Form I annexed herewith and Supplementary Form lA, if applicable, as given in
Appendix II, after the identification of prospective site(s) for the project and/or activities to
which the application relates, before commencing any consruction activity, or preparation of
land, at the site by the applicant. The applicant shall fumish, along with the application, a copy
of the pre-feasibility project report except that, in case of construction projects or activities (item
8 of the Schedule) in addition to Form I and the Supplementary Form lA, a copy of the
conceptual plan shall be provided, instead ofthe prc-feasibility report,
7. Stages in the Prior Environmental Clearance (EC) Process for New Projects:-
7(i) The environmental clearance process for new projects will comprise of a maximum of four
stages, all of which may not apply to particular cases as set forth below in this notification. These
four stages in sequential order are:-
. Stage (l) Screening (Only for Category 'B' projects and activities)
. Stage (2) Scoping
. Stage (3) Public Consultation
e Stage (4) Appraisal
I. Stage (1) - Screening:
In case of Category 'B' projects or activities, this stage will entail the scrutiny of an
application seeking prior environmental clearance made in Form I by the aoncemed State level
Expert Appraisal Committee (SEAC) for determining whether or nor the project or activity
requires further environmental studies for preparation of an Environmental Impact Assessment
(EIA) for its appraisal prior to the grant of environmental clearance depending up on the nature
and location specificity of the project . The projects requiring an Environmental Impact
Assessment report shall be termed Category 'Bl' and remaining projects shall be termed
Category 'B2' and will not require an Environment Impact Assessment report. For categorization
of projects into Bl or 82 except item 8 O), the Ministry of Envkonment and Forests shall issue
appropriate guidelines from time to time.
II. Stage (2) - Scoping:
(i) "Scoping": refers to the process by which the Expert Appraisal Committee in the case of
Category 'A' projects or activities, and State level Expert Appraisal Committee in the case of
Category 'Bl' projects or activities, including applications for expansion and/or modernization
and/or change in product mix of existing projects or activities, determine detailed and
comprehensive Terms Of Reference (TOR) addressing all relevant environmental concerns for
the preparation of an Environment Impact Assessment (ELA) Report in respect of the project or
activity for which prior environmental clearance is sought. The Expert Appraisal Committee or
State level Expert Appraisal Committee concerned shall determine the Terms of Reference on
the basis of the information fumished in the prescribed application Form l/Form lA including
Terns of Reference proposed by the applicant, a site visit by a sub- group of Expert Appraisal
Committee or State level Expert Appraisal Committee concerned only if considered necessary by
the Expert Appraisal Committee or State Level Expert Appraisal Committee concemed, Terms
of Reference suggested by the applicant if fumished and other information that may be available
with the Expe( Appraisal Committee or State Level Expert Appraisal Committee concemed. All
projects and activities listed as Category 'B' in Item 8 of the Schedule
(Construction/Township/Commercial Complexes /Housing) shall not require Scoping and will be
appraised on the basis of Form l/ Form lA and the conceptual plan.
(i, The Terms of Reference CIOR) shall be conveyed to the applicant by the Exprt
Appraisal Committee or State Irvel Expert Appraisal Committee as concemed within sixty days
of the receipt of Form l. In the case of Category A Hydroelectric projects Item 1(c) (i) of the
Schedule the Terms of Reference shall be conveyed along with the clearance for pre-construction
activities .If the Terms of Reference are not finalized and conveyed to the applicant within sixty'
days of the receipt of Form l, the Terms of Reference suggested by the applicant shall be
deemed as the f,inal Terms of Reference approved for the EIA studies. The approved Terms of
Reference shall be displayed on the website of the Ministry of Environment and Forests and the
concerned State Lrvel Environment Impact Assessment Authority.
(iii) Applications for prior environmental clearance may be rejected by the regulatory
authority concemed on the recommendation of the EAC or SEAC concemed at this stage itself.
In case of such rejection, the decision together with reasons for the same shall be communicated
!o the applicant in writing within sixty days of the receipt of the applicarion.
III. Stage (3) - Public Consultation:
(a) modemization of irrigation projects (item l(c) (ii) of the Schedule).
(b) all projects or activities located within industrial estates or parks (item 7(c)
of the Schedule) approved by the concemed authorities, and which are not
disallowed in such approvals.
(c) expansion of Roads and Highways (item 7 (0 of the Schedule) which do not
involve any fudher acquisition of land.
(d) all Building /Construction projects/Area Development projects and Townships
(item 8).
(e) all Category 'B2' projects and activities
(ii) The Public Consultation shall ordinarily have two components comprising of:-
(a) a public hearing at the site or in its close proximity- district wise, to be carried out in the
manner prescribed in Appendix IV, for ascertaining concems of local affected persons;
(b) obtain responses in writing from other concemed persons having a plausible stake in the
environmental aspects of the project or activity.
(iii) the public hearing at, or in close proximity to, the site(s) in all cases shall be conducted
by the State Pollution Control Board (SPCB) or the Union territory Pollution Contol Committee
(UTPCC) concemed in the specified manner and forward the proceedings to the regulatory
authority concemed within 45(forty five ) of a request to the effect from the applicant.
(iv) in case the State Pollution Control Board or the Union territory Pollution Control
Committee concemed does not undertake and complete the public hearing within the specified
period, and/or does not convey the proceedings of the public hearing within the prescribed period
(i) "Public Consultation" refers to the process by which the concerns of local affected persons
and others who have plausible stake in the environmental impacts of the project or activity are
ascertained with a view to taking into account all the material concerns in the project or activity
design as appropriate. All Category 'A' and Category Bl projects or activities shall undertake
Public Consultation, except the following:-
(0 all projects or activities concerning national defence and security or
involving other strategic considerations as determined by the Central
Govemment.
directly to the regulatory authority concemed as above, the regulatory authority shall engage
another public agency or authority which is not subordinate to the regulatory authority, to
complete the process within a further period of forty five days,.
(v) If the public algncy or authority nominated under the sub paragraph (iii) above reports to
the regulatory authority concemed that owing to the local situation, it is not possible to conduct
the public hearing in a manner which will enable the views of the concemed'local persons to be
frcely expressed, it shall report the facts in detail to the concerned regulatory authority, which
may, after due consideration of the report and other rcliable information that it may have, decide
that the public consultation in the case need not include the public hearing.
(vi) For obtaining responses in writing from otler concerned persons having a plausible stake
in the environmental aspects of the project or activity, the concemed regulatory authority and the
State Pollution Control Board (SPCB) or the Union territory Pollution Control Committee
(UTPCC) shall invite responses from such concerned persons by placing on their website the
Summary EIA report prepared in the format given in Appendix IIIA by the applicant along with
a copy of the application in the prescribed form , within seven days of the receipt of a written
request for arranging the public hearing . Confidential information including non-disclosable or
legally privileged information involving Intellectual Property Right, source specified in the
application shall not be placed on the web site The regulatory authority concerned may also use
other appropriate media for ensuring wide publicity about the project or activity. The regulatory
authority shall, however, make available on a written request from any concemed person the
Draft EIA report for inspection at a notified place during normal office hours till the date of the
public hearing. All the responses received as part of this public consultation process shall be
forwarded to the applicant thrcugh the quickest available means.
(vii) After completion of the public consultation, the applicant shall address all the material
environmental ccincerns expressed during this process, and make appropriate changes in the draft
EIA and EMP. The final EIA report, so prepared, shall be submitted by the applicant to the
concemed regulatory authority for appraisal. The applicant may alternatively submit a
supplementary rcport to draft EIA and EMP addressing all the concems expressed during the
public consultation.
IY. Stage (4) - Appraisal:
(D Appraisal means the detailed scrutiny by the Expert Appraisal Committee or State Level
Expert Appraisal Committee of the application and other documents like the Final EIA report,
outcome of the public consultations including public hearing proceedings, submitted by the
applicant to the regulatory authority concemed for grant of environmental clearance. This
appraisal shall be made by Expert Appraisal Committee or State l.evel Expert Appraisal
Committee concemed in a transparent manner in a proceeding to which the applicant shall be
invited for fumishing necessary clarifications in person or through an authorized representative.
On conclusion of this proceeding, the Expert Appraisal Committee or State IJYeI Expert
Appraisal Committee concemed shall make categorical recommendations to the regulatory
authority concerned either for grant of prior environmental clearance on stipulated terms and
conditions, or rejection of the application for prior environmental clearance, together with
reasons for the same.
(ii) The appraisal of all projects or activities which are not required to undergo public
consultation, or submit an Environment Impact Assessment report, shall be carried out on the
basis of the prescribed application Form I and Form lA as applicable, any other rclevant
6
validated information available and the site visit wherever the same is considered as necessary by
the Expert Appraisal Committee or State lrvel Expert Appraisal Committee concemed.
(iii) The appraisal of an application be shall be completed by the Expert Appraisal Committee
or State lrvel Expert Appraisal Committee concemed within sixty days of the receipt of the final
Environment knpact Assessment report and other documents or the receipt of Form I and Form
I A, where public consultation is not necessary and the recommendations of the Expert
Appraisal Committee or State kvel Expert Appraisal Committee shall be placed before the
competent authority for a final decision within the next fifteen days .The prescribed procedure
for appraisal is given in Appendix V ;
7(ii). Prior Environmental Clearance (EC) process for Expansion or Moderniation or
Change of product mix in existing projects:
All applications seeking prior environmental clearance for expansion with increase in the
production capacity beyond the capacity for which prior environmental clearance has been
granted under this notification or with increase in either lease area or production capacity in the
case of mining pmjects or for the modemization of an existing unit with increase in the total
production capacity beyond the threshold limit prescribed in the Schedule to this notification
through change in process and or technology or involving a change in the product -mix shall be
made in Form I and they shall be considered by the concemed Expert Appraisal Committee or
State lrvel Expert Appraisal Committee within sixty days, who will decide on the due diligence
necessary including preparation of EIA and public consultations and the application shall be
appraised accordingly for grant of environmental clearance.
E.Grant or Rejection of Prior Environmental Clearance @C):
(i) The regulatory authority shall consider the recommendations of the EAC or SEAC
concerned and convey its decision to the applicant within forty five days of the receipt of the
recommendations of the Expert Appraisal Committee or State kvel Expert Appraisal
Committee concerned or in other words within one hundred and five days of the receipt of the
final Environment Impact Assessment Report, and where Environment Impact Assessment is not
required, within one hundred and five days of the receipt of the complete application with
requisite documents, except as provided below.
(iD The regulatory authority shall normally accept the recommendations of the Expert
Appraisal Committee or State Level Expert Appraisal Committee concemed. In cases where it
disagrees with the recommendations of the Expert Appraisal Committee or State Irvel Expert
Appraisal Committee concerned, the regulatory authority shall request reconsideration by the
Expert Appraisal Committee or State l:vel Expert Appraisal Committee concemed within forty
five days of the receipt of the recontnendations of the Expert Appraisal Committee or State
kvel Expert Appraisal Committee concerned while stating the reasons for the disagreement. An
intimation of this decision shall be simultaneously conveyed to the applicant. The Expert
Appraisal Committee or State Ipvel Expert Appraisal Committee concerned, in turn, shall
consider the observations of the regulatory authority and fumish its views on the same within a
further period of sixty days. The decision of the regulatory authority after considering the views
of the Expert Appraisal Committee or State kvel Expert Appraisal Committee concerned shall
be final and conveyed to the applicant by the regulatory authority concemed within the next
thirty days.
(iii) In the event that the decision of the regulatory authority is not communicated to the
applicant within the period specified in sub-paragraphs (i) or (ii) above, as applicable, the
7
applicant may proceed as if the environment clearance sought for has been granted or denied by
the regulatory authority in terms of the final recommendations of the Expert Appraisal
Committee or State l-evel Expert Appraisal Committee concemed.
(iv) On expiry of the period specified for decision by the regulatory authority under paragraph
(i) and (ii) above, as applicable, the decision of the regulatory authority, and the final
reiommendations of the Expert Appraisal Committee or State Irvel Expert Appraisal
Committee concemed shall be public documents.
(v) Clearances from other regulatory bodies or authorities shall not be required prior to receipt
of applications for prior environmental clearance of projects or activities, or screening, or
scoping, or appraisal, or decision by the regulatory authority concerned, unless any of these is
sequentially dependent on such clearance either due to a requirement of law, or for necessary
technical reasons.
(vi) Deliberate concealment and/or submission of false or misleading information or data
which is material to screening or scoping or appraisal or decision on the application shall make
the application liable for rejection, and cancellation of prior environmental clearance granted on
that basis. Rejection of an application or cancellation of a prior environmental clearance already
granted, on such ground, shall be decided by the rcgulatory authority, after giving a personal
hearing to the applicant, and following the principles of natural justice.
The "Validity of Environmental Clearance" is meant the period from which a prior
environmental clearance is granted by the regulatory authority, or may be presumed by the
applicant to have been granted under sub paragraph (iv) of paragraph 7 above, to the start of
production operations by the project or activity, or completion of all construction operations in
case of construction projects (item 8 of the Schedule), to which the application for prior
environmental clearance refers. The prior environmental clearance granted for a project or
activity shall be valid for a period of ten years in the case of River Valley projects (item I (c) of
the Schedule), project life as estimated by Expert Appraisal Committee or State l-evel Expert
Appraisal Committee subject to a maximum of thirty years for mining projects and five years in
the case of all other projects and activities. However, in the case of Area Development projects
and Townships [item 8@)], the validity period shall be limited only to such activities as may be
the responsibility of the applicant as a developer. This period of validity may be extended by rhe
regulatory authority concemed by a maximum period of five years provided an application is
made to the regulatory authority by the applicant within the validity period, together with an
updated Form l, and Supplementary Form lA, for Construction projects or acrivities (item 8 of
the Schedule). In this regard the regulatory authority may also consult the Expert Appraisal
Committee or State kvel Expert Appraisal Committee as the case may be.
10, Post Environmental Clearance Monitoring:
(i) It shall be mandatory for the project management to submit half-yearly compliance reports
in respect of the stipulated prior environmental clearance terms and conditions in hard and soft
copies to the regulatory authority concerned, on l"t June and l"t December of each calendar year.
(iD All such compliance reports submitted by the project management shall be public
documents. Copies of the same shall be given to any person on application to the concemed ,
rcgulatory authority. The latest such complialce rcport shall also be displayed on the web site of
the concemed regulatory authority.
g
9. Validity of Environmental Clearance (EC):
11. Transferability of Environmental Clearance (EC):
A prior environmental clearance granted for a specific project or activity to an applicant
may be [ansferred during its validity to another legal person ontitled lo undertake the project or
activity on application by the transferor, or by the transferee with a written "no objection" by the
transferor, to, and by the regulatory authority concerned, on the same terms and conditions under
which the prior environmental clearance was initially granted, and for the same validity period.
No reference to the Expert Appraisal Committee or State bvel Expert Appraisal Committee
concemed is necessary in such cases.
12. Operation of EIA Notilication, 1994, till disposal of pending cases:
From the date of ftnal publication of this notification the Environment Impact
Assessment (EIA) notification number 5.0.6,0 (E) dated 27b larruary,1994 is hereby superseded,
except in suppression of the things done or omitted to be done before such suppression to the
extent that in case of all or some types of applications made for prior environmental clearance
and pending on the date of final publication of this notification, the Central Govemment may
relax any one or all provisions of this notification except the list of the projects or activities
requiring prior environmental clearance in Schedule I, or continue operation of some or all
provisions of the said notification, for a period not exceeding one year from the date of issue of
this notification.
lNo. J-l1013/s6l2(M-IA-tr (I)I
(R.CHANDRAMOHAN)
JOINT SECRETARY TO THE GOVERNMENT OF INDIA
I
SCHEDULE
(See paragraph 2 and 7)
LIST OF PROJECTS OH ACTIVITIES REOUIRING PRIOR ENVIRONMENTAL CLEAHANCE
10
A
Project or Activity
Category with threshold limit Conditions if any
A B
I Mining, extraction of natural resources and power generation (for a specified
production capacity)
(1) (2\ (3) (4) (5)
l(a) Mining of minerals > 50 ha. of mining lease area
Asbestos mining irrespective of
mining area
<50 ha
2 5 ha .of mining
lease area.
General Condition
shall apply
Note
Mineral prospecting
(not involving
drilling) are exempted
provided the
concession areas
have got previous
clearance for physical
survey
1(b) Offshore and
onshore oil and gas
exploration,
development &
production
All projects Note
Exploration Surveys
(not involving drilling)
are exempted provided
the concession areas
have got previous
clearance for physical
survey
1(c) River
projec ts
Valley (D > 50 MW hydroelectric
power generation;
(ii) > 10,000 ha. of culturable
command area
(i)<50Mw>2s
MW hydroelectric
power generation;
(ii) < 10,000 ha. of
culturable command
area
General Condition shall
aPply
l(d) Thermal
Plants
Power > 500 MW (coal4ignite/naphta
& gas based);
> 50 MW (Pet coke diesel and
all other fuels -)
< 500 IvIw
(coaUlignite/naptha &
gas based);
<50MW
> 5MW (Pet coke
,diesel and all other
fuels )
General Condition shall
apply
(1) (2) (3) (4) (s)
1(e) Nuclear power
projects and
processing of
nuclear fuel
All projects
.,
Primary Processing
2(a) Coal washeries ) I million tor/annum
throughput of coal
<lmillion ton/annum
tfuoughput of coal
General Condition shall
apply
(If located within mining
area the proposal shall be
appraised together with the
mining proposal)
2 (b) Mineral
beneficiation
2 0.Imillion ton/annum
mineral tkoughput
< 0.lmillion tor/annum
mineral throughput
General Condition shall
apply
(Mining proposal with
Mineral beneficiation shall
be appraised together for
grant of clearance)
'1 'l
^\
3 Materials Production
(r) (2) (3) (:4') (s)
3(a) Metallurgical
industries (ferrous
& non ferrous)
a)himary
metallurgical industry
All projects
b) Sponge
manufacturing
> 2OOTPD
lron
c)Secondary
metallurgical
processing industry
All toxic and heavy
metal producing units
> 20,000 tonnes
/annum
Sponge
manufacturing
<2OOTPD
lron
Secondary metallurgical
processing industry
i.)All toric
andheaYymetal producing
units
<20,000 tonnes
/annum
ii.)Alt other
non -toxic
secondary metallurgical
processing industries
>5000 tonnes/annum
General Condition
apply for Sponge
manufacturing
shall
iron
3( b) > 1.0 million
tonneYannum
production capacity
< 1.0 million
tonnes/annum production
capacity. All Stand alone
grinding units
General Condition shall
apply
12
Cement plants
4 Materials Processing
I (4 5
4(a) Petroleum refining
industry
All projects
4(b) Coke oven plants >2,50,000
tonneYannum
<2,50,000 &
225,000 tonnes/annum
4(c ) Asbestos milting
and asbestos based
All projects
4(d) Chlor-alkali
industry
>3m TPD production
capacityor a unit
located out side the
notifred industrial areal
estate
No new Mercury Cell
based plants will be
permitted and existing
units converting to
membrane cell technology
are exempted from this
Notification
<300 TPD production Specific Condition shall
notified industrial areal
apply
a
estate
capacity
and located within
4(e) Soda ash Industrv All projects
4(D kather/skin/hide
processing
industly
New projects outside
the industrial area or
expansion of existing
units out side the
industrial area
AII new or expansion of
projects located within a
notified industrial areal
estate
condition shallSpecific
apply
5 Manufacturin g/Fabrication
s(a) Chemical
fertilizers
All projects
s(b) Pesticides industry
and pesticide
specific
intermediates
(excluding
formulations)
All units
technical
pesticides
producing
grade
13
(z\ (3)
(1) (2t (3) (4) (s)
5(c) Petro-chemical
complexes
(industries based
on processing of
petroleum
fractions & natural
gas and/or
reforming to
aromatics)
All projects
s(d) Manmade fibres
manufacluring
Rayon Others General Condition shall
apPly
5(e) Petrochemical
based processing
(processes other
than cracking &
reformation and
not covered under
the complexes)
l,ocated out side the
notifi ed industrial areal
estate
Located in a notified
industrial area./ estate
Specific Condition shall
apply
s(f) Synthetic organic
chemicals industry
(dyes & dye
intermediates; bulk
drugs and
intermediates
excluding drug
formulations;
synthetic rubbers;
basic organic
chemicals, other
synthetic organic
chemicals and
chemical
intermediates)
Located out side the
notified industrial areal
estate
Located in a notified
industrial area./ estate
Specifrc Condition shall
apply
s(e) Distilleries (i)A11 Molasses based
di stilleries
(ii) All Cane juicd
non-molasses based
distilleries )30 KLD
All Cane juice/non-
molasses based distilleries
General Condition shall
apply
<30 KLD
s(h) Integrated paint
industry
All projects General Condition shall
apply
14
(1) (2) (3) (4)
s(i) Pulp & papet
industry excluding
manufacturing of
paper from waste
paper and
manufacture of
paper from ready
pulp with out
bleaching
Pulp
and
lnanufac turing
Pulp& Paper
manufacturing industry
s(i) Sugar Industry 2 5000 tcd cane crushing
capacity
General Condition shall
apply
Induction/arc
furnaceVcupola
furnaces 5TPH or
more
All projects General Condition shall
appiv
6 SerYice Sectors
6(a) Oil & gas
transportation pipe
line (crude and
refinery'
petrochemical
products), passing
through national
parks
/sanctuaries/coral
reefs /ecologically
sensitive areas
including LNG
Terminal
All projects
s(k)
A
15
(51
Paper manufacturinglceneral
industry v/ithout pulp lapply
manufacturing
I
I
I
Condition shall
(1) (2\ (3) (4) (s)
6(b) Isolated storage &
handling of
hazardous
chemicals (As per
threshold planning
quantity indicated
in column 3 of
schedule2&3of
MSIHC Rules
1989 amended
2000)
All projects General Condition shall
apply
7 Physical Infrastructure including Environmental Services
7(a) Air ports
7(b) All ship breaking
yards including
ship breaking units
All projects
7(c) Industrial estates/
parks/ complexes/
areas, export
processing Zones
(EF ), Special
Economic Tnnes
(SE ), Biotech
Parks, l€ather
Complexes.
If at least one industry
in the proposed
industrial estate falls
under the Category A,
entire industrial area
shall be treated as
Category A,
irrcspective of the area.
Industrial estates with
area greater than 500
ha. and housing at least
one Category B
industry.
-Industrial estates housing
at least one Category B
industry and area <500
ha.
Industrial estates of area>
500 ha. and not housing
any industry belonging to
Category A or B.
Special condition shall apply
Note:
Industrial Estate of area
below 500 ha. and not
housing any industry of
category A or B does not
require clearance,
7(d) Common
hazardous waste
treatment, storage
and disposal
facilities (TSDFs)
All integrated facilities
having incineration
&landirll or
incineration alone
All facilities having land
fill only
General Condition shall
apPly
16
All projects
(1) (2) (3) (4\ (s)
7(u) Ports, Harbours > 5 million TPA of
cargo handling
capacify (excluding
fishing harbours)
< 5 million TPA of cargo
handling capacity and/or
porty harbours 210,000
TPA of fish handling
capacity
General Condition shall
applv
7(t) Highways i) New National High
ways; and
ii) Expansion of
National High ways
greater than 30 KM,
involving additional
right of way greater
than 20m involving
land acquisition and
passing through more
than one State.
i) New State High ways;
and
ii) Expansion of National
/ State Highways greater
than 30 km involving
additional right of way
greater than 20m
involving land
acquisition.
General Condition shall
apply
7(e) Aerial ropeways All projects General Condition shall
apply
7(h) Common
Effluent
Treatment Plants
(CETPS)
All projects General Condition shall
apply
7(i) Common
Municipal Solid
Waste
Management
Facility
(cMswMD
AII projects General Condition shall
apply
(1) (2) (3) (4) (s)
8 Building /Construction projects/Area Development projects and Townships
8(a) andBuilding
Construction
projects
>20000 sq.mtrs and
<1,50,000 sq.mrs. of
built-up area#
#(built up area for covered
construction; in the case of
facilities open to the sky, it
will be the activity area )
8(b) Tbwnships and
Area Development
projects.
Covering an area I 50 ha
and or built up area
:1,50,000 sq .mtrs ++
t*All proiects under Item
8(b) shall be appraised as
Category B I
Note:-
General Condition (GC):
Any project or activity specified in Category 'B' will be treated as Category A, if located in
whole or in part within 10 km from the boundary of: (i) Protected Areas notified under the Wild
Life (Protection) Act, 1972, (ii) Critically Polluted areas as notified by the Central Pollution
Control Board from time to time, (iii) Notified Eco-sensitive areas, (iv) inter-State boundaries
and intemational boundaries.
Specific Condition (SC):
If any Industrial Estate/Complex / Export processing Zones /Special Economic ZoneslBiotech
Parks / kather Complex with homogeneous t)?e of industries such as Items 4(d), a(0, 5(e), 5(0,
or those Industrial estates with pre -defined set of activities (not necessarily homogeneous,
obtains prior environmental clearance, individual industries including proposed industrial
housing within such estates /complexes will not be required to take prior environmental
clearance, so long as the Terms and Conditions for the industrial estate/complex are complied
with (Such estatevcomplexes must have a clearly identified management with the legal
responsibility of ensuring adherence to the Terms and Conditions of prior environmental
clearance, who may be held responsible for violation of the same throughout the life of the
complex/estate).
18
--- --]
(r)
APPENDIX I
(See paragraph - 6)
FORM I
Basic Information
Name of the Project:
Location / site altematives under consideration:
Size of the Project: *
Expected cost of the project:
Contact Information:
Screening Category:
Capacity cofiesponding to sectoral activity (such as production capacity for
nnnufacturing, mining lease area and production capacity for mineral
production, area for mineral exploration, length for linear transport
infrastructure, Beneration capacity Ior power generation etc.,)
(II) Activity
1. Construction, operation or decommissioning of the Project involving actions,
which will cause physical changes in the locality (topography, land use, changes
in water bodies, etc.)
19
S.No. Informatiory'Checklist conlirmation Yes/No
Details thereof (with
approximate quantities /rates,
wherevcr possible) wilh source
of information data
I I Permanent or temporary change in land use,
land cover or topography including increase
in intensity of land use (with respect to
local land use plan)
1.2 Clearance of existing land, vegetation and
buildings?
Creation of new land uses?
1.4 Pre-construction investigations e.g. bore
houses, soil testing?
1.5 Construction works?
1.3
t.6 Demolition works?
t.7 Temporary sites used for construction works
or
housing of construction workers?
t.8 Above ground buildings, structures or
' earthworks including linear st$ctures, cut
and
fill or excavations
1.9 Underground works including mining or
tunneling?
Reclamation works?
l.ll Dredging?
t.t2 Offshore structures?
Production and manufacturing processes?
1.14 Facilities for storage of goods or materials?
Facilities for treatment or disposal of solid
waste or liquid effluents?
l.l6 Facilities for long term housing of
operational workers?
t.t7 New road, rail or sea traffic during
oonstruction or operation?
l. l8 New road, rail, air waterbome or other
transport inftastructure including new or
altered routes and stations, ports, airports etc?
r. r9 Closure or diversion of existing transport
routes or infrastructure leading to changes in
traffic
movements?
1.20 New or diverted ransmission lines or
pipelines?
L2t Impoundment, damming, culverting,
realignment or other changes to the
hydrology of watercourses or aquifers?
t.22 Stream crossings?
L23 Abstraction or transfers of water form ground
or surface waters?
t.24 Changes in water bodies or the land surface
affecting drainage or run-off?
20
l.r0
l. l3
Lt5
1,25 Transport of personnel or materials for
construction, operation or decommissioning?
1.26 Long-term dismantling or decommissioning
or restoration works?
1.27 Ongoing activity during decommissioning
which could have an impact on the
environment?
1.28 lnflux of people to an area in either
temporarily or permanently?
1.29 Introduction of alien species?
1.30 loss of native sp€cies or genetic diversity?
l.3l Any other actions?
2. Use of Natural resources for construction or operation of the Project (such as land,
water, materials or energy, especially any resources which are non-rcnewable or in
short supply):
2-l
S.No. Information/checklist confi rmation YcVNo
Details thereof (with
approximate quantities /rates,
wherever possible) with source
of information data
2.1
2.2 Water (expected source & competing users)
unit: KLD
2.3 Minerals (MT)
lonstruction material - stone, aggregates,
and / soil (expected source - MT)
2.5 Forests and timber (source - MT)
2.6 Energy including electricity and fuels
(source, competing users) Unit: fuel (MT),
energy (MW)
2.7 Any other natural resources (use appropriate
standard units)
I
Land especially undeveloped or agriculrural
I
land (ha)
|
i
2.4
3. Use, storage, transport, handling or production of substances or materials,
which could be harmful to human health or the environment or raise
concerns about actusl or perceived risks to human health.
4, Production of solid wastes
decommissioning (MT/month)
during construction or operation or
S.No. Information/Checklist conlirmation YeVNo
Details thereof (with
approximate
quantities/rates, wherever
possible) with source of
information data
3.1 Use of substances or materials, which are
hazardous (as per MSIHC rules) to human health or
the environment (flora, fauna, and
water supplies)
3.2 Changes in occurrence of disease or affect disease
vectors (e.9. insect or water bome diseases)
3.3 Affect the welfare of people e.g. by changing living
conditions?
3.4 Vulnerable groups of people who could be affected
by the project e.g. hospital patients, children, the
elderly etc.,
3.5 Any other causes
S.No. Informatiory'Checklist confi rmation YeJNo
Details thereof (with
approximate
quantities/rates, wherever
possible) with source of
information data
4.1
4.2 Municipal waste (domestic and or commercial
wastes)
4.3 Hazrdous wastes (as per Hazardous Waste
Management Rules)
Spoil, overburden or mine wastes
4.4 Other industrial p(rcess wastes
4.5 Surplus product
4.6 Sewage sludge or other sludge from effluent
treatment
4.7 Construction or demolition wastes
4.8 Redundant machinery or equipment
4.9
4.10
Contaminated soils or other materials
Agricultural wastes
4.t I Other solid wastes
5. Release of pollutants or any hazardous, toxic or noxious substances to air
(Kg/hr)
S.No. Informatiory'Checklist confi rmation Yes/No
Details thereof (with
approximate
quantitieVrates, wherever
possible) with source of
information data
5.1 Emissions from combustion of fossil fuels from
stationary or mobile sources
5.2 Emissions from production processes
5.3 Emissions from materials
storage or transport
handling including
5.4 Emissions from construction activities including
plant and equipment
5.5 Dust or
including
waste
odours from handling
construction materials,
of materials
sewage and
5.6 Emissions from incineration of waste
5.7 Emissions from burning of waste in open air (e.g.
slash materials, construction debris)
5.8 Emissions from any other sources
6. Generation of Noise and Yibration, and Emissions of Light and Heat:
S.No. Information/Checklist confi rmation
YeVNo Details thereof (with
approximate
quantitieVrates, wherever
possible) with source of
information data with
source of information
data
6.1 From operation of equipment e.g. engines,
ventilation plant, crushers
6.2 From industrial or similar processes
6.3 From construction or demolition
6.4 From blasting or piling
6.5 From construction or operational traffic
6.6 From lighting or cooling systems
6.7 From any other sources
S.No. Information/Checklist confi rmation YesNo
Details thereof (with
approximate
quantities/rates, wherever
possible) with source of
information data
7.t From handling, storage, use or spillage of
hazardous materials
7.2 From discharge of sewage or other effluents to
water or the land (expected mode and place of
discharge)
t-3 By deposition of pollutants emitted to air into the
land or into water
1.4 From any other sources
'7.5 Is there a risk of long term build up of pollutants in
the environment from these sources?
7. Risks of contamination of land or weter from rel€ases of pollutants into the
ground or into sewers, surface watersr groundwater, coastal ryaters or the sea:
8. Risk of accidents during construction or operation of the Project, which could
affect human health or the environment
25
S.No. Information/Checklistco irmatio[ YeVNo
Details thereof (with
approximate
quantitiedratts, wherever
possible) with source of
information data
8.1 From explosions, spillages, fires etc from storage,
handling, use or production of hazardous
substances
8.2 From any other causes
Could the project be affected by natural disasters
causing environmental damage (e.9. floods,
earthquakes, landslides, cloudburst etcX
8.3
9. Factors which should be considered (such as consequential development) which
could lead to environmental etlects or the potential for cumulatiye impacts with
other existing or planned activities in the locality
S. No. Information/Checklist confi rmation Yes/No
Details thereof (with
approximate
quantities/rates, wherever
possible) wilh source of
information data
9.1 Irad to development of supponing,
lities, ancillary development or development
stimulated by the project which could have
impact on the environment e.g.:
. Supporting infrastructure (roads, power supply,
waste or waste water reatment, etc.)
housing development
extractive industries
supply indusaies
oth6r
9.2 Lead to after-use of the site, which could havean
impact on the environment
9.3 Set a precedent for later developments
Have cumulative effects due to proximity to other
existing or planned projects with similar effects
(IID EnvironmentalSensitivity
S.No, Areas Name/
Identity
Aerial distance (within 15
km.)
Proposed project location
boundary
I I Areas protected under intemational conventions,
national or local legislation for their ecological,
landscape, cultural or other related value
26
9.4
2 Areas which are important or sensitive for
ecological rcasons - Wetlands, watercourses or
other water bodies, coastal zone, biospheres,
mountains, forests
3 Areas used by protected, important or sensitive
species of flora or fauna for breeding, nesting,
foraging, rcsting, over wintering, migration
4 Inland, coastal, marine or underground waters
5 State, National boundaries
6 Routes or facilities used by the public for access
to recreation or other tourist, pilgrim areas
'7 Defence installations
8 Densely populated or buillup area
9 Areas occupied by sensitive man-made land uses
(hospitdls, schaols, places of worship, community
facilities )
l0 fueas containing important, high quality or scarce
resources
(ground water resources, surface resources,
forestry, agicukure, fisheries, touism, minerals)
lt Areas already subjected to pollution or
environmental damage. (those where existing legal
enyironmental standards are exceeded)
t2 Areas susceptible to natural hazard which could
cause the project to present environmental
problems
(earthquakes, subsidence, landslides, erosion,
floodinB
ot extremc or adverse climatic conditions)
(IY). Proposed Terms of Reference for EIA studies
27
H
APPENDIX II
(See paragraph 6)
FORM-I A (only for construction projects listed under item 8 of the Schedule)
CHECK LIST OF ENVIRONMENTAL IMPACTS
(Project proponents are required to provide full information and wherever necessary
attach explanatory notes with the Form and submit along with proposed environ.mental
management plan & monitoring programme)
1. LAND ENVIRONMEI{T
(Attach panoramic view of the project site and the vicinity)
l.l. lVill the existing landuse get significandy altered from the project that is not consistent
with the surroundings? (Proposed landuse must conform to the approved Master Plan /
Development Plan of the area. Change of landuse if any and the statutory approval from the
competent authority be submitted). Attach Maps of (i) site location, (ii) surrounding featurcs
of the proposed site (within 500 meters) and (iii)the site (indicating levels & contours) to
appropriate scales. If not available attach only conceptual plans.
1.2. List out all the major project requirements in terms of the land area, built up area, water
consumption, power requirement, connectivity, community facilities, parking needs etc.
1.3. What are the likely impacts of the proposed activity on the existing facilities adjacent to
the proposed site? (Such as open spaces, community facilities, details of the existing landuse,
disturbance to the local ecology).
1.4. Will there be any significant land disturbance resulting in erosion, subsidence &
instability? @etails of soil type, slope analysis, wlnerability to subsidence, seismicity etc
may be given).
1.5. Will the proposal involve alteration of natual drainage systems? (Give details on a
contour map showing the natural drainage near the proposed project site)
1.6. What are the quantities of earthwork involved in the construction activity-cutting, filling,
reclamation etc. (Give details of the quantities of earthwork involved, transport of fill
materials from outside the site etc.)
1.7. Give details regarding water supply, waste handling etc during the consuuction period.
1.8. Will the low lying areas & wetlands get altered? (Provide details of how low lying and
wetlands are getting modified from the proposed activity)
1.9. Whether construction debris & waste during construction cause health hazard? (Give
quantities of various types of wastes generated during construction including the construction
labour and the means of disposal)
2. WATERET{VIRONMENT
2. l. Give the total quantity of water requircment for the proposed project with the breakup of
requirements for various uses. How will the water rcquirement met? State the sources &
quantities and fumish a water balance statement.
28
2,2. What is the capacity (dependable flow or yield) of the proposed source of water?
2.3. What is the quality of water required, in case, the supply is not from a municipal source?
(Provide physical, chemical, biological characteristics with class of water quality)
2.4. How much of the water rcquirement can be met from the recycling of treated
wastewater? (Give the details of quantities, sources and usage)
2.5. Will there be diversion of water from other users? (Please assess the impacts of the
project on other existing uses and quantities of consumption)
2.6. What is the incremental pollution load from wastewater generated from the proposed
activity? (Give details of the quantities and composition of wastewater generared from the
proposed activity)
2.7. Give details of the water requirements met from water harvesting? Furnish details of the
facilities created.
2.8. What would be the impact of the land use changes occurring due to the proposed project
on the runoff characteristics (quantitative as well as qualitative) of the area in the post
construction phase on a long term basis? Would it aggravate the problems of flooding or
water logging in any way?
2.10. What precautionvmeasues are taken to prevent the run-off from construction activities
polluting land & aquifers? (Give details of quantities and the measures taken to avoid the
adverse impacts)
2.1l. How is the storm water from within the site managed?(State the provisions made to
avoid flooding of the area, details of the drainage facilities provided along with a site layout
indication contour levels)
2,12, Will the deployment of construction labourers particularly in the peak period lead to
unsanitary conditions arcund the project site (Justify with proper explanation)
2.13. What on-site facilities are provided for the collection, treatment & safe disposal of
sewage? (Give details of the quantities of wastewater generation, treatment capacities with
technology & facilities for recycling and disposal)
2.14. Give details of dual plumbing system if treated waste used is used for flushing of toilets
or any other use.
3. YEGETATION
3.1. Is there any thrcat of the project to the biodiversity? (Give a descriPtion of the local
ecosystem with it's unique featurcs, if any)
29
2.9. What arc the impacts of the proposal on the ground water? (Will there be tapping of
ground water; give the details of ground water table, recharging capacity, and approvals
obtained from competent authority, if any)
3.2. will the construction involve extensive clearing or modification of vegetation? (provide
a detailed account of the trees & vegetation affected by the project)
3-3. what are the measures proposed to be taken to minimize the likely impacts on important
site features (Give details of proposal for tree plantation, landscaping, creation of water-bodies
etc along with a layout plan to an appropriate scale)
4.FAUNA
4.1' Is therc likely to be any displacement of fauna- both terrestrial and aquatic or creation of
barriers for their movement? Provide the details.
4.2. Any direct or indirect impacts on the avifauna of the area? provide details.
4.3. Prescribe measures such as corridors, fish ladders etc to mitigate adverse impacts on fauna
5. AIR ENVIRONMENT
5.1. Will the project increase atmospheric concentration of gases & result in heat islands?
(Give details of background air quatity levels with prcdicted values based on dispersion
models taking into account the increased traffic generation as a result of the proposed
constructions)
5.2. What are the impacts on generation of dust, smoke, odorous fumes or other hazardous
gases? Give details in relation to all the meteorological parameters.
5.3. Will the proposal create shortage of parking space for vehicles? Fumish details of the
present level of transport infrastructure and measures proposed for improvement including
the traffic management at the entry & exit to the project site.
5.4. hovide details of the movement pattems with internal roads, bicycle tracks, pedestdan
pathways, footpaths etc., with areas under each category.
5.5. Will there be significant increase in traffic noise & vibrations? Give details of the
sources and the measures proposed for mitigation of the above.
5.6. What will be the impact of DG sets & other equipment on noise levels & vibration in &
ambient air quality around the project site? Provide details.
5. AESTHETICS
6.1. Will the proposed constructions in any way result in the obstruction of a view, scenic
amenity or landscapes? Are these considerations taken into account by the proponents?
6.2. Will there be any adverse impacts from new constructions on the existin8 structues?
What are the considerations taken into account?
6.3. Whether therc are any local considerations of urban form & urban design influencing the
design criteria? They may be explicitly spelt out.
6.4. Are therc any anthropological or archaeological sites or artefacts nearby? State if any
other significant features in the vicinity of the proposed site have been considered.
7, SOCIO.ECONOMIC ASPECTS
7.1. Will the proposal rcsult in any changes to the demographic structure of
population? Provide the details.
30
local
7.2. Give details of the existing social infrastructure around the proposed project.
7.3. tilill the project cause adverse effepts on local communities, disturbance to sacred sites or
other cultural values? What are the safeguar& proposed?
8. BUILDING MATERIALS
8.1. May involve the use of building materials with high-embodied' energy. Are the
construction materials produced with energy efficient processes? (Give details of energy
conservation measures in the selection of building materials and their energy efficiency)
8.2. Transport and handling of materials during consruction may result in pollution, noise &
' ' public nuisance. What measures are taken to minimize the impacts?
8.3. Are rccycled materials used in roads and structures? State the extent of savings achieved?
8.4. Give details of the methods of collection, segregation & disposal of the garbage generated
during the operation phases of the project.
9. ENERGY CONSERVATION
9.2. What type of, and capacity of, power back-up to you plan to provide?
9.3. What are the characteristics of the glass you plan to use? Provide specifications of its
characteristics related to both short wave and long wave radiation?
9.4. What parisive solar architectural features are being used in the building? lllustrate the
applications made in the proposed project.
9.6, Is shading effectively used to reduce cooling/heating loads? What principles have been
used to maximize the shading of Walls on the East and the West and the Roof? How much
energy saving has been effected?
9.7. Do the structurcs use energy-efficient space conditioning, lighting and mechanical
systems? hovide technical details. Provide details of the transformers and motor efficiencies,
lighting intensity and air-conditioning load assumptions? Are you using CFC and HCFC free
chillers? Provide specifi cations.
9.8. What are the likely effecs of the building activity in altering the micro-climates? Provide
a self assessment on the likely impacts of the proposed construction on creation of heat island
& inversion effects?
31
9.1. Give details of the power requircments, source of supply, backup source etc. What is the
energy consumption assumed per square foot of built-up area? How have you tried to minimize
energy consumption?
9.5. Does the layout of streets & buildings maximise the potential for solar energy devices?
Have you considered the use of street lighting, emergency lighting and solar hot water systems
for use in the building complex? Substantiate with details.
9.9. What are the thermal characteristics of the building envetope? (a) roof; O) extemal wallsi
and (c) fenestration? Give details of the material used and the U-values or the R values of the
individual components.
9.10. What precautions & safery measures are proposed against flre hazards? Fumish details of
emergency plans.
9.1i. If you are using glass as wall material provides details and specifications including
emissivity and thermal characteristics.
9.12. What is the rale of air infiltration into the building? Provide details of how you are
mitigating the effects of infiltration.
9.13. To what extent the non-conventional energy technologies are utilised in the overall
energy consumption? Provide details of the renewable energy technologies used.
10. Environment Management Plan
The Environment Management Plan would consist of all mitigation measures for each item
wise activity to be undertaken during the construction, operation and the entire life cycle to
minimize adverse environmental impacts as a result of the activities of the project. It would
also delineate the environmental monitoring plan for compliance of various environmental
regulations. It will state the steps to be taken in case of emergency such as accidents at the site
including fire.
32
APPENDIX III
(See paragraph 7
GENERIC STRUCTURE OF ENVIRONMENTAL IMPACT ASSESSENT DOCTJMENT
s.No EIA STRUCTURE CONTENTS
I Introduction Purpose of the report
. Identification ofproject & project proponent
. Brief description of nature, size, location of the project
and its importance to the country, region
. Scope of the study - details of rcgulatory scoping carried
out (As per Terms of Reference)
2. Project Description . Condensed description of those aspects of the project
(based on project feasibility study), likely to cause
environmental effects. Details should be provided to give
clear picture of the following:
. Type of project
Need for the project
. Location (maps showing general location, specific
location, project boundary & project site layout)
. Size or magnitude of operation (incl. Associated
activities requircd by or for the project
Proposed schedule for approval and implementation
Technology and process description
. Project description. Including drawings showing project
layout, components of project etc. Schematic
reprcsentations of the feasibility drawings which give
information important for EIA purpose
. Description of mitigation measures incorporated into
the project to meet environmental standards, environmental
op€rating conditions, or other EIA requirements (as
required by the scope)
. Assessment of New & untested technology for the risk
of technological failurc
4
6
3 Description of
Environment
the . Study area, period, components & methodology
. Btablishment of baseline for valued environmental
components, as identified in the scope
. Base maps of all environmental components
Anticipated
Environmental Impacts
&
Mitigation Measures
. Details of Investigated Environmental impacts due to
project location, possible accidents, project design, project
construction, regular operations, final decommissioning or
rchabilitation of a completed project
. Measures for minimizing and / or offsetting adverse
impacts identified
. Irreversible and lrretrievable commitments of
envimnmental components
. Assessment of significance of impacts (Criteria for
determining signifi cance, Assigning signifi cance)
Mitigation measures
Analysis of Alternatives
(Technology
& Site)
. In case, the scoping exercise rcsults in need for
alternatives:
Description of each altemative
Summary of adverse impacts of each altemative
Mitigation measures proposed for each altemative and
Selection of altemative
Environmental
Monitoring Program
. Technical aspects of monitoring the effectiveness of
mitigation measures (incl. Measurement methodologies,
frcquency, location, data analysis, reporting schedules,
emergency procedures, detailed budget & procurement
schedules)
7 Additional Studies Public Consultation
Risk assessment
Social Impact Assessment. R&R Action Plans
8 Project Benefits Improvements in the physical infrastructure
Improvements in the social infrastructure
Employment potential -skilled; semiskilled and
unskilled
Other tangible benefits
34
5.
9 Environmental
Benefit Analysis
Cost If recommended at the Scoping stage
10. EMP . Description of the administrative aspects of ensuring
that mitigative measures are implemented and their
effectiveness monitored, after approval of the EIA
1l Overall justification for implementation of the project
. Explanation of how, adverse effects have been
mitigated
12. Disclosurc
Consultants engaged
of The names of the Consultants engaged with their
brief resume and nature of Consultancy rendered
35
Summary & Conclusion I
(This q'ill constirute the
I
summary of the EIA I
Report ) |
I
APPENIDIX III
(See paragraph
A
7)
CONTENTS OF SUMMARY ENVIRONMENTAL MTACT ASSESSMENT
The Summary EIA shall be a summary of the full EIA Report condensed to ten A4
size pages at the maximum. It should necessarily cover in brief the following Chapters of the
full EIA Report: -
l. Project Description
2. Description of the Envionment
3. Anticipated Environmental impacts and mitigation measures
4. Environmental Monitoring Programme
5. Additional Studies
6. Project Benefits
7. Environment Management Plan
36
APPENDIX IV
(See paragraph 7)
PROCEDURE FOR CONDUCT OF PUBLIC HEARING
1.0 The Public Hearing shall be arranged in a systematic, time bound and
transparent manner ensuring widest possible public padicipation at the project site(s) or in its
close proximity District -wise, by the concerned State Pollution Control Board (SPCB) or the
Union Territory Pollution Conuol Committee (L-fTPCC).
2.1 The Applicant shall make a request through a simple letter to the Member
Secretary of the SPCB or Union Territory Pollution Control Committee, in whose
jurisdiction the project is located, to arrange the public hearing within the prescribed
statutory period. In case the project site is extending beyond a State or Union Territory, the
public hearing is mandated in each State or Union Territory in which the project is sited and
the Applicant shall make separate requests to each concemed SPCB or UTPCC for holding
the public hearing as per this procedurc.
2.2 The Applicant shall enclose with the letter of request, at least l0 hard copies
and an equivalent number of soft (electronic) copies of the draft EIA Report with the generic
structure given in Appendix III including the Summary Environment Impact Assessment
report in English and in the local language, prcpared strictly in accordance with the Terms of
Reference communicated after Scoping (Stage-2). Simultaneously the applicant shall arrange
to forward copies, one hard and one soft, of the above draft EIA Report along with the
Summary EIA report to the Ministry of Environment and Forests and to the following
authorities or offices, within whose jurisdiction the project will be located:
(a) DistrictMagistrate/s
(b) Zla Parishad or Municipal Corporation
(c) District Industries Office
(d) Concemed Regional Office of the Ministry of Environment and Forests
2.3 On receiving the draft Environmental Impact Assessment report, the above-
mentioned authorities except the MoEF, shall arrange to widely publicize it within their
respective jurisdictions requesting the interested persons to send their comments to the
concemed regulatory authorities. They shall also make available the dmft EIA Report for
inspection electronically or otherwise to the public during normal office hours till the Public
Hearing is over. The Ministry of Environment and Forests shalt promptly display the
Summary of the draft Environmental Impact Assessment report on its website, and also make
the full draft EIA available for reference at a notified place during normal office hours in the
Ministry at Delhi.
2.4 The SPCB or UTPCC concemed shall also make similar arangements for
giving publicity about the project within the Staterunion Territory and make available the
Summary of the draft Environmental Impact Assessment report (Appendix III A) for
inspection in select offices or public libraries or panchayats etc. They shall also additionally
2. 0 The Process:
make available a copy of the draft Envtonmental Impact Assessment report to the above
five authoritieVoffices viz, Ministry of Environment and Fbrests, District Maglstrate etc.
3.0
3.1 The Member-Secretary of the concemed SPCB or UTPCC shall finalize the date,
time and exact venue for the conduct of public hearing within 7(seven) days of the date of
receipt of the draft Environmental Impact Assessment report from the project proponent, and
advertise the same in one major National Daily and one Regional vemacular Daily. A
minimum notice p€riod of 30(thirty) days shall be provided to the public for fumishing their
responses;
3.2 The advertisement shall also inform the public about the places or offices where
the public could access the draft Environmental Impact Assessment report and the Summary
Environmental Impact Assessment report before the public hearing
3.3 No postponement of the date, time, venue of the public hearing shall be undertaken,
unless some untoward emergency situation occurs and only on the recommendation of the
concemed District Magistrate the postponement shall be notified to the public thrcugh the
same National and Regional vemacular dailies and also prominently displayed at all the
identified offices by the concemed SPCB or Union Territory Pollution Control Committee;
3.4 In the above exceptional circumstances fresh date, time and venue for the public
consultation shall be decided by the Member -Secretary of the concemed SPCB or UTPCC
only in consultation with the District Magistrate and notified afresh as per procedure under
3.1 above.
4.0 The Panel
5.0 Videography
5.1 The SPCB or UTPCC shall arrange to video film the entLe proceedings. A copy
of the videotape or a CD shall be enclosed with the public hearing proceedings while
forwarding it to the Regulatory Authority concemed.
6.0 Proceedings
6.1 The attendance of all those who are present at the venue shall be noted arld
annexed with the final proceedings.
6.2 There shall be no quorum required for attendance for starting the proceedings.
6.3 A representative of the applicant shall initiate the proceedings with a prcsentation
on the project and the Summary EIA report.
6.4 Every person present at the venue shall be $anted the opportunity to seek
information or clarifications on the project from the Applicant. The summary of the public
38
Notice of Public Hearing:
4+ The District Magistrate or his or her representative not below the rank of an
Additional District Magistrate assisted by a representative of SPCB or UTPCCT shall
supervise and preside over the entire public hearing process.
hearing proceedings accurately reflecting all the views and concems expressed shall be
recorded by the representative of the SPCB or UTPCC and read over to the audience at the
end of the proceedings explaining the contents in the vemacula.r language and the agreed
minutes shall be signed by the District Magistrate or his or her reprcsentative on the same
day and forwarded to the SPCBruTPCC concemed.
6.5 A Statement of the issues raised by the public and the comments of the Applicant
shall also be prepared in the local language and in English and annexed to the proceedings+
6.6 The proceedings of the public hearing shall be conspicuously displayed at the
office of the Panchyats within whose jurisdiction the project is located, office of the
concemed Zla Parishad, District Magistrate ,and the SPCB or UTPCC . The SPCB or
UT?CC shall also display the proceedings on its website for general information. Comments,
if any, on the proceedings which may be sent directly to the concerned regulatory authorities
and the Applicant concemed.
7 .0 Time period for completion of public hearing
7.1 The public hearing shall be completed within a period of45 (forty five) days from
date of receipt of the request letter from the Apglicant. Therefore the SPCB or UTPCC
concemed shall sent the public hearing proceedings to the concerned regulatory authority
within 8(eight) days of the completion of the public hearing .The applicant may also
directly forward a copy of the approved public hearing proceedings to the regulatory
authority concemed along with the final Environmental Impact Assessment report or
supplementary report to the draft EIA report prepared after the public hearing and public
consultations.
7.2 If the SPCB or UTPCC fails to hold the public hearing within the stipulated
45(forty five) days, the Central Govemment in Ministry of Environment and Forests for
Category 'A' project or activity and the State Government or Union Territory Administration
for Category 'B' project or activity at the request of the SEIAA, shall engage any other
agency or authority to complete the process, as per procedure laid down in this notification.
39
APPENDIX -V
(See paragraph 7)
PROCEDURE PRESCRIBED FOR APPRAISAL
1. The applicant shall apply to the concemed regulatory authority through a simple
communication enclosing the following documents where public consultations are
mandatory: -
. Final Environment knpact Assessment Report [20(twenty) hard copies and I (one)
soft copy)l
. A copy of the video tape or CD of the public hearing proceedings
. A copy of final layout plan (20 copies)
. A copy of the project feasibility repo( (l copy)
2. The Final EIA Report and the other relevant documents submitted by the applicant
shall be scrutinized in office within 30 days from the date of its receipt by the concemed
Regulatory Authority strictly with refercnce to the TOR and the inadequacies noted shall
be communicated electronically or otherwise in a single set to the Members of the EAC
/SEAC enclosing a copy each of the Final EIA Report including the public hearing
proceedings and other public rcsponses received along with a copy of Form -lor Form
lA and scheduled date of the EAC /SEAC meeting for considering the proposal .
3. Where a public consultation is not mandatory and therefore a formal EIA study is
not required, the appraisal shall be made on the basis ofthe prescribed application Form I
and a pre-feasibility report in the case of all projecs and activities other than Item 8 of
the Schedule .In the case of Item I of the Schedule, considering its unique project cycle ,
the EAC or SEAC concemed shall appraise all Category B projects or activities on the
basis of Form 1, Form lA and the conceptual plan and stipulate the conditions for
environmental clearance . As and when the applicant submits the approved scheme
/building plans complying with the stipulated environmental clearance conditions with all
other necessary statutory approvals, the EAC /SEAC shall recommend the $ant of
environmental clearance to the competent authority.
4. Every application shall be placed before the EAC /SEAC and its appraisal completed
within 60 days of its receipt with requisite documents / details in the prescribed manner.
5. The applicant shall be informed at least 15 (fifteen) days prior to the scheduled date of
the EAC /SEAC meeting for considering the project proposal.
6. The minutes of the EAC /SEAC meeting shall be finalised within 5 working days of
the meeting and displayed on the website of the concemed regulatory authority. In case
the project or activity is recommended for grant of EC, then the minutes shall clearly list
out the specific environmental safeguards and conditions. In case the recommendations
are for rejection, the reasons for the same shall also be explicitly stated.
40
APPENDIX YI
(See paragraph 5) .
COMPOSITION OF THE SECTOR/ PROJECT SPECIT'IC E)PERT APPRAISAL
COMMITTEE (EAC) FOR CATEGORY A PROJECTS AND THE STATEA]T LEVEL
E)(PERr APPRAISAL CoMMITTEES (SEACs) rOR CATEGORY B PROJECTS TO
BE CONSTITUTED BY THE CENTRAL GOVERNMENT'
l. The Expert Appraisal Committees (EAC(s) and the StateruT lrvel Expert .{ppraisal
Committees (SEACs) shall consist of only professionals and experts fulfilling the following
eligibility criteria:
Professional: The person should have at least (i) 5 years of formal University training in the
concemed discipline leading to a MA/IVISc Degree, or (ii) in case of Engineering
/Technology/Architecture disciplines,4 years formal training in a professiohal training course
together with prescribed practical training in the field leading to a B.Tech/8.E./B.Arch. Degree,
or (iii) Other professional degree (e.g. [aw) involving a total of 5 years of formal University
training and prescribed practical training, or (iv) Prescribed apprenticeship/article ship and pass
examinations conducted by the concemed professional association (e.g. Chartered Accountancy
),or (v) a University degree , followed by 2 years of formal training in a University or Service
Academy (e.g. MBA/IAS/IFS). In selecting the individual professionals, experience gained by
them in their respective fields will be taken note of.
Expert: A professional fulfilling the above eligibility criteria with at least 15 years of relevant
experience in the field, or with an advanced degree (e.g. Ph.D.) in a concemed field and at least
l0 years of relevant experience.
Age: Below 70 years. However, in the event of the non-availability of ipaucity of experts in a
given field, the maximum age of a member of the Expert Appraisal Committee may be allowed
up to 75 years
2. The Members of the EAC shall be Experts with the requisite expertise and experience in the
following fields /disciplines. In the event that persons fulfilling the criteria of "Experts" are not
available, Professionals in the same field with sufficient experience may be considered:
. Environment Quality Experts: Experts in measurement/monitoring, analysis and
interpretation of data in relation to environmental quality
. Sectorat Experls in Project Management: Experts in Project Management or
Management of ProcesVOperations/Facilities in the relevant sectors.
. Environmental Impact Assessment Process Experts: Experts in conducting and
carrying out Environmental Impact Assessments (EIAS) and preparation of Environmental
Management Plans @MPs) and other Management plans and who have wide expertise and
knowledge ofpredictive techniques and tools used in the EIA process
Risk Assessment Experts
Life Science Experts in floral and fauual management
Forestry and Wildlife Experts
41
Environmental Fronomics Expert with €xperience in project appraisal
3. The Membership of the EAC shall not exceed 15 (fifteen) regular Members. However
the Chairperson may co-opt an expert as a Member in a relevant field for a particular meeting
of the Committee.
4. The Chairperson shall be an outstanding and experienced environmental policy expert
or expert in management or public administration with wide experience in the relevant
development sector.
5. The Chairperson shall nominate one of the Members as the Vice Chairperson who shall
preside over the EAC in the absence of the Chairman /Chairperson.
6. A representative of the Ministry of Envirorxnent and Forests shall assist the Committee
as its Secretary.
7. The maximum tenure of a Member, including Chairperson, shall be for 2 (two) terms of 3
(three) years each.
8. The Chairman / Members may not be removed prior to expiry of the tenure without cause
and proper enquiry.
42
I Page I of 7
9t2612006
ti
The Review
Checklist
http ://envfor.nic.in/divisions/iass/eia/Checklist0.lrtm
I
I Page 2 of 7
How To Use This Checklist
All project proposals requiring Environmental Assessment (see Chapter 3 of this Manual)
may be examined according to the following review process.
The Review Checklist comprises two sections:
(A) Pre-Appraisal
(B) Appraisal
Each section begins with a set of guidance notes to be followed by EIA reviewers in iis
completion.
Within Section B environmental information submitted as part of a project proposal is
appraised under the following headings:
http ://envfor.nic.in/divisions/iass/eialChecklistO.htm
6. DIFFICULTIES IN COMPILING INFOR}
7. GENERAL PRESENTATION
8. NON.TECHNICAL SUMMARY
9. RISK ASSESSMENT
)126/2006
I
I. DESCRIPTION OF THE PROJECT
2. PROJECT AND PROCESS ALTERNANVES
3, DESCRIPTION OF THE ENVIRONMENT
4. DESCRITPTION OF IMPACTS
5. MITIGATION MEASURES
1 Page 3 of 7
Seiction A - Guidance Notes for Pre-Appraisal
Step I (the lirst task):
For each Review Question the reviewer will need to determine whether or not the project proposal meets
MoEF's preliminary requirements. If yes, the reviewer notes this and moves on to the next question.
Step 2 (the second task):
If a proposal does not meet MoEF's preliminary requirements, the reviewer notes this, and where
applicable provides comment in the right hand column. Where a discrepancy is based on the omission
of supporting documentation or information and where appropriate and feasible, the reviewer indicates
where this information may be obtained according to the following listing:
Al Project Proponent
Bl State Agencies
Cl Central Agencies
Dl State Government
El Central Government
Fl Deprrtmentslly
Gl C€ntral Pollution Control Board
Hl Other (please note)
Step 3 (the third task)
On the basis of the preliminary appraisal the reviewer makes a decision on whether or not the proposal
justifies further review. If yes the reviewer continues with Section B of the Checklist.
http://envfor.nic.irldivisions/iass/eialChecklist0.htm 9/2612006
Pre-appraisal can be used to determine whether a submified project proposal meets the preliminary
appraisal requirements ofMoEF. These include project siting restrictions, permitting requirements, and
supporting documentation. The outcome of section A will be the decision on whether to continue
appraising the proposal through section B of the checklist.
I )
0.2
0.3
O. PRELIMINARY PROJECT APPRAISAL
No. Criterion Yes / No
Leg Requirements
0.t Whether the proposal submitt€d rttracts the provisions of
EIA notilicrtiotr, CRZ notilication, public hearing process
snd amandments issued from time to time. When the
proposal satislies the provisions of the above
Are there litigation and/or dispute against the project?
Whether the project r€quires site clearance under EIA
rotificstions; has site clearance been obtained? This should
take inlo account clearances required under:
. The Local Authority;
. Forest Committee;
o Committee of Stat€ Government
. R€gional or local developm€nt authority
I nlo mal io n R e q u I r e rn e nls
Does the application includ€ all those items listed iD the
'MoEF Document Checklist'?
Are thc purpose(s) snd objectives of the project clearly
described?
Are the trature and status ofthe decision(s) that are
reqrired to be made, clear from the information supplied?
http://envfor.nic.in/divisions/iass/eialChecklist0.htrn
Page 5 of7
9t2612006
0.4
0.5
0.6
I
O. PRELIMINARY PROJECT APPRAISAL
Page 6 of7 \
912612006
No. Criterion
0.1
Land Reqabements
Where applicable, does the proposal include information
relating to siting criteria, including distrnces from:
. Areas ofcultursl heritage; / historical monuments
. forests;
. Ecologically sensitive areas( as mentioned in Annexure
ID;
. Humrn settlements;
. Coastal Regulation Zones
. Rords, Nrtional Highwrys and Railways
. Defence installation, Air ports.
Wsler and Fuel Requlremen,J
0.t Has water requir€ment quantilied rnd sources identilied?
Does this include 8n assessm€nt of competi[g users, e.g.
drinkitrg, industry, irrigation etc.?
0.9 Are fuel sourc€s identilied and qusntilied? Whether fuel
Iinkege and its transportation is estsblished?
0. r0 Have any special or hazardous wastes thst will be produc€d
been identili€d and quantilied?
http ://envfor.nic.irldivisions/iass/eialChecklistO.htm
Yes / No
I
t* IRPLTINARY PROJECT APPRAISAL h
No. Criterion
0.1 I
0.12
Yes / No
Financi s.nd Socio-Economic Requhements
Whether the totsl project itrvestmetrt is given
Whelher cost of environment protection, mitigation
measures and R & R provided
Slrulegic Requbemenls
Does the proposal identify 'up-stream' and 'down-stream'
impacts, for example:
. Sources of raw materials;
o Material and product transportation;
. Provide relevant maps on l:25000/l:2500 scale
Other Rel€vant CriteriaEI
0.15 Whether the Public Hearing details enclosed
0.t3
0.14
http ://envfor.nic.in/divisions/iass/eialChecklistO.htm 9t26/2006