Rule 7, Uttar Pradesh (Area Panchayat) and (District Panchayat) Construction Works Rules, 1984: The receipt of an accountant or clerk for the contractor will not be considered as any acknowledgement of payment to the Mukhya Adhikari, Khand Vikas Adhikari and the contractor shall be res- ponsible for secking that he procures a receipt signdd by the Mukhya Adhi- kari/Khand Vikas Adhikari
Uttar Pradesh (Area Panchayat) and (District Panchayat) Construction Works Rules, 1984 - Rule 7
Text of rule 7
The receipt of an accountant or clerk for the contractor will not be considered as any acknowledgement of payment to the Mukhya Adhikari, Khand Vikas Adhikari and the contractor shall be res- ponsible for secking that he procures a receipt signdd by the Mukhya Adhi- kari/Khand Vikas Adhikari
7. The receipt of an accountant or clerk for
the contractor will not be considered as any acknowledgement of payment to the Mukhya Adhikari, Khand Vikas Adhikari and the contractor shall be res- ponsible for secking that he procures a receipt signdd by the Mukhya Adhi- kari/Khand Vikas Adhikari.
-
8.. The memorandum of work tendered for shall' be filled in and com- pleted in the office of the Mukhya AdhikarifKhand. Vikas Adhikari- before the cender form is issued.
the carnest money paid by
TENDER FOR WORKS .
hereby tender form the exe- cution for the Adhyaksha Zila Parishéd/l’raxnukh, Kshettra Samiti of the work specified in the underwritten memorandum within the time specified in such memorandum at the rates specified therein and in accordance with and in all respects withi the specifications; designs, drawing and instructions in writ- Ing referred to in para 1 thereof and in clause 2 of the conditions of contract and with such materials as are provided for by and in all other respects - in accordance with such conditions as far as applicable. # :
MEMORANDUM
(a) General description (a) If severable sub-works are included
= they should be detailed in a sepa- (b) Estimate cost. rate list. .
(b) vide para A/D to please fill on (<) Earnest money. page Reivivins
., (© vide para A/D to please fill on
% age RS . Pag 0 Time allowed for the work from date of written order to commence. o
- months......
Item of work Approximate Unit per (a) Tendered . number b) Sanctioned date. " ... - or quantity E/) in (f) in words
figures ......
Item no.
Rs,
——————tender at per cent above/below - the rates entered
or.
————————tender at the aljove rates.
v
v
b
v
u
y
¢
d
d
v
.
d
0]
=}
g
o
o
W
I SR ST T, 1 W, 1985 Ty A8
by and fulfil all the terms and pro
ed to the approved set of contract docy
and pay to the Adhyaksha, Zila Ps 2 P
bt : ) S: s, successors in office the sums of money mentinoned in the said conditio
carnest money the full
security deposit specified in clause 1 of the conditions of contract.
Dated the ..
" Rsheura Samiti.
clled the contractor) shall within fourteen days after his or their
been accepted deposit with the Zila Parishad/Kshettra- Samiti
called the Parishad/Kshetrn Samiti) either in cash or in .securiti
Office Savings Bank deposit pledged in favour of Parishad/Kshettra Samiti
or a fixed deposit reccipt of one of the Scheduled banks
Parishad fKshettra Samiti, such sum as will wi
with the tender amount: to rupee....:.
deposited is not payable to bearer, the contractor shall endorse or transfer
it to the said Parishad/Kshettra Samiti in such manner th.
-sented by it can be realised without the consent or assistanc
The contractor shall also permit Parishad/Kshettra Samiti at the time of
A
S
I
R
I
N
)
hereby agree o abide
ol the conditions tract annex- \ the conditions of con
x
rents or in default thereof to [orl'ch.l,
wd/Pramukh, Kshettra Samiti or his
Should this tender be aceepred .
ons
The sum of Rs. is herewith, forwarded in currency mnotcs las
lue of which shall be retained on account of the
198
Witness. .
Address. . s
Occupation. .........
The above tender is hereby =
Signature mnd Des ion
Accepting Authority.
Ditedilitrs 5 o oo 5 srmdayiobs @ oo 5 . w008
I or We
Strike out the alternative and affix signature to it.
‘Give particulars and numbers.
Signature of conuractor before submission of tenders.
Signature of witness to contractor's signature.
Here enter “Recommended” or “Not recommended” Signature.
' CONDITIONS OF CONTRAGT
Clause 1-The person or persons whose tender is accepted (hercinafter
tender has
(hereinafter
ies or Post
Further deposit
1edu approved by the
ith ‘the carnest money deposited
--o--.....and where any security so
at the sum repre-
¢ of the contractor.
making any payment to him for work done under the contract to deduct ten per cent of every such payment until* the sums so deducted- will, with the
money or ........ .
AMOUNE 10} TUPE s cirecor0 mrersimiousiessamioiacsots which Ist mentioned sum s’ herein. Deduction
after called “Sccurity” payable by the contractor to Parishad [Kshettra Samig "™
under the terms of this contract may be deducted from,
of a sufficient ‘part of his sccurity :deposit or from the ‘interest
from or from any sums which may,be duc or may become du,
tractor hy “Parishad/Kshettra Samiti on any account whatsocve,
event of his security being reduced by reasons of any such deduc
as aforesaid the contractor shall within en days thes ealter
Government securitics (endorsed or transferred ~ as “aforesaid
Post Office Savings Bank or a fixed deposit in a scheduled bank
the” Parishad/Kshetra Samiti
*“deposit has been so reduced. o S
from new sccurities deposited as. aforesaid,
or paid ‘by the sale
arising there-
¢ to the con-
T and in the
tion ‘or sale
deposit in cash or
or deposit in
approved by
his security . ¥
if necessary the, amount by which
A
»
v
oN
s
v
s
50
ST SR ST A 1 a7, 1986
‘Compensation
for delay.
Action when
sacurity deposit
is forfeitcd.
i i he essence of the contract. The contractor shall
-.ouufiiancmcc ?;fi_s’lll‘:.\,lxllec;sm%[lc(lc the wovfk covclr!'!g I{Yl_ “‘cl tender ;}:cg‘:md::fi
ced by Tukhya Adhikavi/Khand Vikas Adhikari for the comm 3
plsn Bl )I work and shall in the interval between those dated -keep
e s“cll ! liedule of quantities and dates shown in the progress
fe ork o ikt s; by the contractor and attached to the |_cndcr._ l(_the
Statement o bc. s:guco[ the progress statements cither in quantity or in time,
‘;‘mk [ln}ls‘g; '“:;f"r:hm. the work is so in arrear the contractor shall be liable
:olcl"nymnecm)npélzls'\lion an_amount cqual Jo one l’?l‘; _F“""lm' s“lc"ci:ir:)‘x:uicr:
amount the Mukhya ;\rlhika.n/l\h:\n(l \|kqs Adhikari (w llosc v(Icl oo
writing shall be final) may decide on the (csumnlc(l cost of the w lqdc " #
Provided always that the entire amount of compensation to be pai c«‘im c:
the provision of this clause shall not exceed ten per ‘cent of the estimated cos
of the work as shown in the tender.
[Clause 2-B—To be used instead of 2 (a) when the letter is from the nature
of the work impracticable]. N ¢
Clause 2-C—Time is the essence ol the contract. The contractor shall
complete the work within :the "period specified in_the tender. Such period
shall be reckoned from the date on which the order to commence work is
given, to the contractor. The contractor shall at all time during such period
proceed with the work with the diligence and he shall pay as compensation
an amount equal to onc per cent or such smaller amount as the Mukhya
Adhikari/Khand Vikas Adhikari (whose decision in writing shall be final)
may decide on the amount of the estimated cost of the whole work as shown
by ‘the tender- for every day that the work remains un-commenced, or un-
finished after the proper dates.. And further, in order to ensure good progress
during the execution of the work, the contractor ‘shall be bound in all cases
in which the time allowed for any work exceeds one month to complete one-
fourth ol the value or quantity (as the Mukhya Adhikari/Khand. Vikas
Adhikari may determine) of the whole of the work before onefourth of the whole time allowed under the contract elapsed; onehalf of the value or quantity (as the Mukhya Adhikari/Khand Vikas Adhikari may determine) of the work before one-half of such time has elapsed and three-fourth of the value or quantity (as the Mukhya Adhikari/Khand Vikas Adhikari may determine) of the work before three-fourth of such time has elapsed. If the contractor fails to comply with this condition -he shall be liable to pay as compensation an amount equal to one per cent or such smaller amount (as the Mukhya Adhikari/Khand Vikas Adhikari whose decision in writing shall be final) may decide on the said estimated cost of the whole work -for every day that the quantity of work remains incomplete. Provided ;always that the entire amount of compensation to be paid under the provision of this clause _lschajl ot exceed ten per cent on the estimated ‘cost:0f the work shown in the nder.
& . ¥
Clatise 3 (1) In'any case in which under any clause or clauses of the contract the contractor shall have v 0 rendered’ himself liable to pay compen- sation amounting to_the whole of his security deposit (whether paid in one sum or deducted by instalments) the Mukhya ‘Adhikari/Khand Vikas Adhikari shall have power to adopt such of the following courses as he -may deem best. (2) He may rescind the contract by giving' the contract notice o rescission signed by the Adhynkslm/Pmnymih %md may then take fl?fi whole ] ol’. lll(_: ~contractor’s security deposit * for the use of Parishad/ ngxlculll:-n Simiti as Colllpclls‘i\lioll for the loss caused by the contractors
. (b) He may after giving’
3 his _intention to do so,
and Thep employ .and P
¢+ and carry out all. or
the contractardays notice. in writing of measure up the work done by the contractor 2y labourers and supply or procure materials 2 any part of the work - himself on . behalf of the - Parishad/Kshettra San debiting th¢ contractor, with the actual “cost
niti
and crediting him at fhe contract rates with thie value of the work so done, and may Postpone till completion of the work so taken over ‘as
ussement. of flie compensation o be paid’ by the contractor, “If an
ificate in wriu'nlr’y (lhc Mokl Adhikari/Khand Vikas Adhikari cost arid v:nlug °l I‘:IC Mlfl(llya/\dh:kan/l{!flnd Vikas Adhikari,
tractor, shall be final and conclusive against the “cons
mmmfi‘lm"“—‘i! 1985
51
oticesin writi:
(@ He may after giving the con L;‘;{z f;‘y ool e
of his intention to do so, mcasure up the worl for bos completion u;
take the work out of his hands a
nd give & contract olrc doat }:“c ot
another contractor and may postpone
till the cy&ng the oviginal con’
the assessment of the compensation (0 be mAdl (yk'nri dtees ol
wractor. If ‘the ;Mukhya Adhikari/Khand Vika
s 4 .lllc eiainal som
the completion of the work - to another contractor 2t E“IES;OI
o
tractor shall pay any expenses which may be mc‘“l“:l o
tk had béen
sum which would have been paid to
him i the \V(IO“!{: kfi i
carried out by him and a certificate’ in writing of” Mukhya i il
Khand Vikas Adhikari shall be fin
al and conclusive as against the ori-
ginal contractor as to the. amount of nllyvsucl\ expenses.
) _
) 10 the Mukhyn Adhik; Khand 'Vikas Adhikari dpcsinol desire to
do so the contractor shall not be entitle
d to cmupcnsalloll»[fl\ any loss sus- . A
tained by him by reason of his having purchased or procured any materials,
or cntered . into any engagements or made any advances on account of or
With a view 1o exccution of the work or the perfonna
nce of the contract and
Shall not be cntitled to recover ov be paid or be given credit for an
y sum for
any work thércfor actually performed by him under this contract, unless and
until Mukhya Adhikari/ Khand Vikas Adhikari sha
ll have certified in writing
the performance of such work and value thereol the contrac
tor shall only- be
entitled to be paid.the value as so certified. *
(8 If upon any occassion the Mukhya Adhikari/Khand Vikas Adhikari
obstains from excrcising the powers given to him by this. clause such absten-
tion shall not’ prevent him from excercising the powers upon 2 subsequent ./
occassion‘ if the contractor - again‘makes default; not shall such abstention
absolve the contractor from liability . to pay compensation for any default
which he may have made. L i .
Claisse 4—1f the Mukliya Adhikari/Khand Vikas Adhikari _exercise. any Contractor .
of the powers given to him by clause 3 he may if he 5o desires, take, possession —remains liable 16
of all or any tools, plant, materidls and stores in or upon thé works or the, . Pay compensation
site thereof and belonging: to the contractor or procured by him and intended faken under.
to be used for the cxecution of the work or any part thereof, and pay.or allow clause'3.
the contractor for the some at the contract rate, or in case, of these not being
applicable, at current market rates.’to be certified by the Mukhya Adhikari/
Khand Vikas Adhikari whose certificate thereof shall be final, and the Mukhya
Adhikari, Vikas Adhikari docs not desirc.to do so he may by motice in writing to =
the contractor or his clerks of the works, foreman. or other authorised agenit Te- poyersftoftake
quire him to remové such tools, plant, materials or stores from the premises possession of or
“(within a time to be specificd in sich notice) and if .the contractor fails to fequircmedtss
comply ‘with any such ‘requisition the Mukhya Adhikari/Khand Vikas Adhikari femoval. o ors.
may remove them at the contractor’s expense and at his.tisk or sell them by Plnt.
auction or private sale on account of the contractor and at his risk in all respects, -~
aiid the certificate of the Mukhya Adhikari/Khand- Vikas. Adhikari as to the
expenses of any such removal and the amounttof the ‘proceeds and expénses
+of any such sale shall be final and conclusive against the contractor.
tractor
.. Clause 5-1f the contracior deSires extenstion of the .time for completion | Extension of
of the work on the ground:of any" unavoidable -hindranice, . to. its. execution, time .
having ariscn, he, shall , apply in"‘writing": to’ the. Mukhya Adhikari/Khand
Vikas Adhikagi within thirty days from I te the’ existence’ of ‘such. hind- ~
rance first becomes known to him,: and :the " Mikhya "Adhikari/Khand , Vikas - - '
“findl) Teasonable grounds be g
" i opinion-be -
est ]x||)l'[0 ¢Zhin
B atc will: ¢ giyen;nor,ghall} th ,Q[K tonsid
“until-the contracior Tias remoyed, m-thedpreriiises on Wil
executed all scaffolding, surplis material sand rubbish'~ar
work, doors, windows, Wwalls, ofvotlier” pasts;,of
about whichh-th !
[
v
I 5 241 AT A, 1 Wi, 1985 22
4
1
4
ol the conditions, and
s hercinalter provided
or e the Gae ob any extin work ordered in pursuance
not anentonel o provided lor in the ender, at the rate
161 auch work.
7
4
[ Clanse 12-10 (he spe tion or estimate of the _\vork l"n“dcsl"fi-]'rl }l,lu bs“’“p‘ai?'l.l'é/
| use of any special desaiption ol matcrials o be supplied from l:"cll iz had) By Sl
N ¥ Ksheta Sawidii stores, on il it s required tha the contrs ctor shall yse ¢
> i Mores 1o be providad by the Pavishad, Kshetua Samiti* (such material
f and stors and the prices 10 be charged therefor as herei mentioned
S 1 far s practicable and Tor the convenience of the contractor specificd
the Schedule heyeto aunesed hut not so as i any to control the mea-
s Lol this con the conuretor shall be vsnppllunl . with such
d stores ay may frem time to time be - required by him [1?\' the
& purposes ol the contract but only for such purposes and he”shall pay for the
> : spesificd in the said schedule or it no rate il so specified a
s ! .
> - s so supplicd to the contractor will become the preperty of
the contractor, but shall not on any account be removed from the of the
5 ok exeept wiihe her written permission ol the Mukhya Adhikavi/Khand
! until the whole work is «¢ cd Lo be completed by him and
5 ! ics be open o inspection by him. The Mukhya = Adhikavi
Kl V7
masieri;
as Adhikari shall, however, have the option. to take over any such
Is il unused at tlie time of the completion of termination ol the con-
tract ai the specified rate or the current market rate whichever is less.
) )
Clause 13—All articles required ~by the contractor for the constraction
of the work and which the contractor is to supply himself shall be obtained
Dy the contractor from tie firms which the Parishad/Kshettra Samiti has made
arrangements and if for the supply of any articles no such arrangements have
-been made, any such articles supplied by the contractor shall confirm to such
W
5 specification andjor tests if any, as may be prescribed by the Parishad/Kshettra
Samiti g
y - Clause 14—The contractor shall obtain from the stores of the Parisliad/ Stores imported
Kshettra Samiti ali such imported stores or materials as may be required in c‘:umnlricsn::[mbe
[ any considerable quintity lor the work of any part thereof or for making obtained from
up articles required therefor or in connection therewith. The value of such Parishad/Kshetra stores and articles as may be supplied to the contractor by the Mukhya S2mi-
) Adhikari/Khand Vikas Adhikari will be debited to the contractor in his account
" at the rates shown in the schedule attached to the contract and if they are
not cntered with schedule they will be debited at the cost price, which for
the purposes of this contract shall include the cost of carriage and all other ) expenses whatsoever which shall have been incurred in obtained delivery of
the same at the stores aforesuid. - The Mukhya Adhikari/Khand Vikas Adhikari E may issuc materials to the contractor from existing stock if he asks for any . in excess of these enter in the schedule. In such cases the price charged will
be the stock rate or the market rate whichever is greater.
) C{au.m l;—Tllc conllraclor. shall execute the whole and every part of the' ok o be
work in the most substantial and work manlike manner and in every respect: executed in
) - in strict accordance with the specification both as regards materials and other. accordance with : wise. The contractor shall also confirm exactly fully, and faithtully to the SPEciieations
) designs, drawings and instructions in writing. relating (6 the work signed by the g{awmg el
Mukhya Adhikari/Khand Vikas Adhikari lodged in his office, and the contrac-
) tor shall be entitled to inspect the same during office hours and may at his own
expense have copies of the specifications and of all such designs drawing and
; instructions’as aforesaid made for his own use.
Clause 16—The Mukhya Adhikari/Khand Vikas Adhikari s
to make such alteration in or additions to the original s[}cé i
designs and instructions as may appear to him to be necessary or advisable ;<22
during the progress of the work, and the contractor shall be ‘bound to carry
out the work in accordance with any instructions which may be given to him
in writing signed by the Mukhya Adhikari/Khand Vikas Adhikari, and such *
alterations shall not- invalidate the contract -and any additional work which
the contractor may be so dirccted to do shall be carried out'by the contractor
d . on the same conditions in all respects on which he ‘agreed to do to ‘the main
il . .
hall have power Do not
cations drawings invalidate
-‘ |
| IAT % 3 T AwE, 1 W, 1985 L5
3 H B
or e the e
NOL inentio
101 such wor
Clan
itions, 1 1y extra work ordered in pursuance gtlzl;echc‘t_:‘-[li-‘}';‘_; ifn';x
Lor provided lor in the tende the rates hercina
¢ of the work provides for the Siores supsticd
use of = Jion ol materials to be supplied [rom the Pavishad/ llzhclf'::‘gl;‘;":l/h
Ksheuw s, on il it s requived that the contractor shall yse ce
> i stores 10 be providad by the Pavishad,; Ksheta Samiti (‘S\IClI l-“"c"‘l
' dosteres and the prices 10 be charged therefor as hereinali n_uu‘uouc‘
> 0 far sy practicable and for the convenicnce of the conuractor specified
in e Schedule heveto amexed but not so as in any wi y to control the mea-
the ¢ ctor shall be supplicd with such
n time o time e required by him for the
<t but only for such purposes and he s all pay qu the
in the said schedule or if no rate il so specified at
ning or vileat of
o stores s may (o
poses ol the com
= ne at the e spee
\ cost price.
. All n
the contrs
-
/
v
-
’
erials so supplicd to the contractor will become the preperty of
tor, but shall not on any account be removed from the sitc of the
Work - exeept wih her wricten permission of the Mukhya Adhikari
! Vikas Adbikari until the whole work is certified 46 be completed by him and
@i il times be open o inspection by him. The Mukhya = Adhikavij
el Vikas Adiikari shall, however, have the option. to take over any such
als il unused ac dlic time of the completion of termination ol the con-
at the specified rate or the current market rate whichever is less.
Clause
-
/
3—All articles required ~by the contractor for the constraction
of the work and which the contractor is to supply himself shall be obtained
by the contractor from tie firms which the Parishad/Kshettra Samiti has made
arrangements and if for the supply of any articles no such arrangements have
articles supplied by the contractor shall confirm to such
ion andjor tests if any, as may be prescribed by the Parishad/Kshettra
w
¢
-been made, any such
ifi -
Samiti.
Clause 14—The contractor shall obtain f
Kshettra Samiti all such imported stores or
any considerable quantity for the work of any part thereof or for making up articles required therelor -or in connection therewith. The value of sucl stores and articles s may be supplied to the contractor by the Mukhya Adhikari/Khand Vikas Adhikari will be debited to the contractor in his account at the rates shown in the schedule attached to the contract and if they are not entered with schedule they will bé debited at the cost price, which for the purposes of this contract shall include the cost of carriage and all other expenses whatsoever which shall have been incurred in obtained delivery of the same at the stores aloresaid. - The Mukhya Adhikari/Khand Vikas Adhikari may issuc materials to the contractor from existing stock if he asks for any in excess of these enter in the schedule. _In such cases the price charged will be the stock rate or the market rate whichever is greater.
Clause 15—The contractor shall exe " L e contAtLas execute the whole and cevery part of the' work (o be work in the most substan #nd work manlike manner and in every respect: executed in in strict accordunce with the specification both as regards materials and other- accordance with wise. The contractor shall also confirm exact ly fully and faithfully to the SPecifications
) designs, drawings and instructions in writing, relating to the worl: s‘ié:nci’l boy u:: drawing orders
vom the stores of the Parishad/ Stores i"!:;:i"w
materials as may be required in J:m i i
-
e
W
Mukhya Adhikari/Khand Vikas Adhikari lodged in his office, and the. contrac- o ) tor shall be entitled to inspect the same during office hours and may at his own expense have copies of the specifications and of all su P & ch designs drawing and ) . instructions’as aforesaid made for his own use.
Clause 16—The Mukhya Adhikari/Khand Vikas Adhikari shall have power Do mot to make such alteration in or additions to the orj : s v ginal specifications drawings invalidate designs and instructions as may appear to him to be necessara or advisable ottt
: . during the progress of the work, and the contractor shall be ‘bound to carry ) 3 . out the work in accordance with any instructions which may be given to him |
in writing signed by the Mukhya Ad| ari/Khand Vikas Adhika; i, -and such alterations shall not-invalidate the' contract and any additional work Which
the contractor may be so dirccted to do shall be. carried out” by the contractor
on the same conditions in all respects on which he ‘agreed to do to-the main
54
ST R4 AT T, 1 T, 1985
»
§ .
»
»
e No compensa-
14 tion for altcra-
tion in_or
& restriction of y work to be
: caried out.
y
>
]
> Action and
compensation
E payable in cass
Y of bad work.
]
5
y
’
b
). Work 10 be
opened to
' inspection.
)
)
] )
P
ates as are specified in the ender for the main work.
The time for the completion of tho work shall be extended in the proportion
that the additional work bears to the oviginal contract work, u the cert
of the Muklya Adhikari/Khand Vikas Adhikari shall be conclusive as to sucl
proportion. If the additional work include any item for which no rate is
specified. hereunder then the contractor shall out the work at the rate
i i entered in the Schedule of vate of the District but il the
li‘l::cmirr‘!sf:nscq::,- schedule does not contain any rate for such work, then
enceof alteratiors, he contractor shall not begin such work until a raw in
respect of such work been settled by mutual agreement hetween him and
the Mukhya AdhikarijKhand Vikas Adhikari, and il they are unable to agree
upon a rate within two weeks from the date when the, contractor received the
order the Mukhya Adhikari/Khand Vikas Adhikari may
work,.and at the same ¥
Rates for addi- by a notice in writing cancel the order for such work
tional works not and cany it out such ‘manner he may think best.
oo iae In the event of a dispute, the decision of the Adhyaksha/
of the district. Pramukh shall be final and binding on the contractor.
Clause-17—The Mukhya Adhikari/Khand Vikas Adhikari, -acting on_the
written orders of his immediate superior, may at any time by notice in writing
to the contractor cither stop the work altogether or reduce or out it down.
If the work is stopped altogether the contractor will only be paid for work
done and expenses legitimately incurred by him on. or preparation for the
exccution of the work up to the date on which such notice is received by him.
Such expenses shall be assessed by the Mukhya Adhikari/Khand Vikas -Adhi-
Kari, whose decision shall be final and binding on the contractor. " If the work
is cut down the contractor will be paid for the work as so cut down but in
neither case will be paid any-compensation whatever for the loss of profits
which he might have made il he had been allowed to complete all the: work
included in the tender.
Clausc-18—If the Mukhya Adhikari/Khand Vikas Adhikari is satisfied that
the construction of any part of the work is faulty or that the materials used
in the same are inferior to these for which the specificition provides or that
any materials or articles provided by the contractor or not in accordance with
the contract, he may, notwithstanding that such work, materials or articles
may have been passed, certified or paid for serve the contractor with notice
in writing specifying the work materials’ or articles of which he complains
and requiring the contractor to remedy such defects or to replace such-mate-
rials orarticles within a specified period of time.
If the contractor fails to comply, in all respects with the requirements of
any such notice within ten days after the expiration of the period specified
in that notice, the Mukhya Adhikari/Khand Vikas Adhikari may himsclf
remedy such defects, or as the case may be replace such materials or articles,
and the .contractor shall pay, all expenses incurred by the Mukhya Adhikari/
Kiand Vikas Adhikari in so doing and the certificate i writing of the Mukhya
Adhikari/Khand Vikas Adhikari as to the amount of any such expense shall
Le final and binding upon the contractor. T
Clause-19—All works under or in course of cxecutioin or. exccuted in
pursuance of the contract shall at all times be opcned for irfspection and
supervision by the Mukhya Adhikari/Khand Vikas Adhikari or his subordi-
nates and the contractor shall at all times during the usual working hours,
and as any other occasion of which he shall have had reasonable notice, either
Lisascll be present to receive orders and instructions, . or have responsible
agent duly accredited in 'writing present for the purposc. . Orders given to any
such agent shall have the same elfect as orders given to the contractor himself.
l(19./\', No labourer below the age of 12 years shall be employed on the
work, 3
19-B—The contractor shall pay to his labourers a fair wage.
19-C—The contractor before he commences work shall -
¢ (a) post in a conspicuous place on the works notice giving the
rates ‘of wages, and .
‘(b) send a copy ‘of the notice to Mukhya Adhikn}i/Klmml Vikas
Adhikari. »
* mode may be provided by the Mukhya Adhikari/Khand Vik:
* public:from accident and shail bear. the expenses
ITR A A W, | W, 1985 » 55
Clause 20—In order that the work may be measured nut'l lhc)’::ll')l‘rf\‘;l l‘]‘\‘(
mensions thereol taken, the contractor shall not cover up .“Il‘yl l.‘h“ elthicr
same or otherwise place it beyond reach of measurcment unti d“‘l ) s Adhi- obtained the consent in writing of the Mukhya Adhikari/Khand Vi ! to, the
kari or his subowdinate in charge of the work ov until be gtven to,
Mukhya AdhikavizKhand Vi dhikari to such subordinate.
Five days notice in writing that the work is veady for mc:n;m:uu.l‘l‘l.uml‘l
e contractor covers up any work or pl it beyond reach of n..lc‘nlc[.s 1
went without such cousent and before the expiration of the period G Bich
notice, the contractor shall cither, as he nv v elect, strip Sl_lcll work his ow ;I
expense in order that it may be measured ov shall forfeii the price ol such
work and of the materi used in s construction.
Clanse 21—All works 1o be exceuted under the contract shall be cxun‘uc(l
under the direction and subject to the approval in all respects of the n\luFl\ya
Adhikari/Klund Vi Adhikari or his subordinate in chang of the work for
the time Leing who shall be entitled to direct at which point or poi s and
i what mauner they are to be commenced. andd from time to time carried on.
Clause 22—Except where otherwise specified in the contract. the decision
of the Mukhya Adh /Khand Vi ui for tlie time being shall be
final, condusive and binding on all paitics to the contract upon all’ quicstions
relating to the meaning of the specilications, desi; drawing and instructions
hereinbefore mentioned. The decision - of Mukhya Adhikari;Khand Vik
Adhikari as to the quality of workmanship or cliimed right mattcr or thing
whatsoever in any way arising out of or relating to the contract, _ designs,
dryings, specifications, estimates, instructions, order or these conditions, or
otherwise concerning the works of the cxecution or failure to exccute the
same whether arising during the progress of the work or after the comple-
tion or abondonment of the contract by the contractor, shall also be final,
conclusive and binding on the contractor.
Clause 25—If the contractor or his work people or servants shall break,
deface, injury or destroy any part of a building in which they may be work-
ing or any building, road, fence, enclosure or gross laid or cultivated ground
contiguous to the premises on which the work or any part
executed or if any damage shall happen to the work while is
any cause due to the negligence of responsibility or any imperfections become
apparent in it within six months after a certificate final- or other of its com-
pletion has been given as aforesaid the contractor shall at his own expenses muke good such damages, or in default, the Mukhya Adhikari/Khand Vikas Adhikari may cause the expense so incumred and the certificate of the Mukhya Adhikari/Khand Vikas Adhikari as to the amount of such expenses shall be
final and binding .on the contractor.
of its is being
progress from
Clause 24—The contractor shall supply at his own cost all material: cept such special materials, if any, as may in accordance
be supplied from the Parishad/Kshettra Samiti, Slores), plant, tools, appliances, implements ladders, cordage, tackle, scaffolding and temporary works ' requi- site or proper for the proper exccution of the work whether original, altered or substituted and whether included in the specification or other documents forming part of the contract or referred to in these conditions or not or which may be neecessary for the purpose of satisfying or complying with the require- ments of the Mukhya Adhikari/Khand Vikas Adhikari as to any matter as
to which under these conditions he is entitled to be satisfied or which he is entitled to require, and shall pay for the carriage of all such things to and
from the work. The contractor shall also supply without charge’ workmen
with the means and materials necessary for the purpose of setting out works, and for counting, weighing and assisting in the measurement or exam
of the work, or materials at any time. If the contractor
s (ex-
with the contract
t hation
fails to do so," the
as Adhikari and
he Mukhya Adlii-
The contractor
to protect the
of ‘every “suit,
Y person for
the contractor shall pay the cost of the same on certified by
kari/Khand Vikas Adhikari, whose certificate shall be final,
shall also provide all necessary fancing and lights required
of .defence
w that may be brought by action or other proceeding at
Contractor or
responsible agent
10 be presented.
Notic 10 be
given before the
worl covered-
up.
Decision of
Mukhya Adhikari
Khand Vikas
Adhikari to be
final.
Contractor
liable for
damages done
and for imper-
fections for six
months after
certificate.
Contractor to
supply Plant,
Ladders
Scaflolding etc.
Aid liable for
damage arising
from non provision
of light fancing,
elc,
56 ST ST AT T 1 AT 19985
ing lo neglect of the
above pre wions, and shall pay
any
B e wanded in any such suit, action or proceed-
¢ witiy the consent of the conwractor
be
y such person.
sustained o
and costs which may
¢ such person.ov which
v
| Lo compromise any claim
by Ay
Work not v Clause 95—The contragtor shall not asign or sublet the contract with-
sub-let.
<
out the written approval
of the Mukhya Adhika
iKhand Vik Adhi nd
it the contractor does or
aucmpt s (o do or bec
omes insolvent or comme
nces
1w iisclvaney progecdings ov
makes atempts make any composition wi
th
o o he or any of his servis OF AKCIS cither directlyorin-
directly gives clforts or premises any b gratity, gilt, perquisite, xe-
wird of advantage, pecuniary O otherwise
1o any ollicer or person i the
employ, of Parishad/Rshett
ra Samiti in any way relating to his officc or em-
ployment or it any such officer or person shall bec
ome m any way directly or
Indiveatly interested in the contract W hout having first obtained the per-
mission in writing ol the Parishad/Kshettra Samiti
the Mukhya Adhikari/Khan
d
Contract may Vikas Adhiks (hereupon by motice it writing rescind the contract, and
Do "75'"°j}cp§;‘i§‘ the sccurity degosited of the contracto
r shall thereupon stand forfeited and be
forfeited fot absolutely at the disposal ot th
e Parishid/Kshettra Samiti znd the same: conse-
sudleting brbiaz quences shall ensuc as il the contrack had been rescined under clause 3
cantractor ot t 5 1in s . ractor shall not be enti rCCOVe 3
Eecosinsatve 30 hereof, and in addition to ghe contrictor st entitled to recover or
be paid for any work herelor actual
ly- performed under the contract.
‘.lsluf':’rt’gi"‘f :Y Clause 26—Any sum payable by the cont
ractor as compensation under any
sagm o b";w: = of these conditions shall be deemed to b
e reasonable compensation for the act
onsidered . as of default in respect of whicly the same
hecomes payable without proof ot the
reasonable. amount of damage of loss sustained.
compensation 5
without reference
to Actual Loss.
actu
i Clause 27—In the case of a tender by
partners, the contractor shall state
of the names of members of the firm a
nd shall notify to the Mukhya Adhikar
ijKhand
Vikas Adhikari any change in the constitution of the firm as soon as ‘such
change occurs.
: :
Action where Y Clause 28—In the case of any class of work for Wl hich no specification_is
no specification. mentioned in the contract such work shal
l be carried out in accordance with
the district specification, and if there is no d
istrict specification, the work shall
be carried out in all respects in accorda
nce with instructions and requirements
of the Mukhya Adhikari/Khand Vikas Adhi
kari. s
vg;fmlifln of Clause 29—In these conditions unless there is something in the subject
s or context. repugnant to such an interpretation, the expressions ‘work’ or
“work’ mean the work to be done or exccuted under the contract whether
such work is permanent or temporary and whether, it is original, altered,
substituted. or additional. "
Contractor’s
percentzge Clause 30—The additions and deductions on
account of the percentage
:vl\uhu afil;:si referred to at page 3 of the accepted tender will be calcu
lated- on the gross,
0 net or i < E
to net o ¢ bills) and not the net amounts of the bills for the wor
k done.
(strike out this
.
clause in the case
%
of an item rate, g
contract).
Clause 31—(I) In cvery casc in which by virtue of the provisions of
section 1 _of section 12 of the Workmen's Compensation Act, 1932, the
Parishad /Kshettra Samiti is obliged to pay compensation to 2 workmen' e
m-
ployed by the contractor by any sub-contractor
from him in the execution of
the work, Parishad/Kshettra Samiti will recover [rom the contractor the
“mount of compensation as paid, and without
prejudice to the xights of thie
Parishad/Kshettra Samiti under sub-sectioin (2) of section 12, of the said Act,
Parishad/Kshettra Samiti shall be at liberty to recover such amount or any
part thereof deducting it- cither from the security meney - deposited, by the
‘contractor or to his credit clause 1 of these conditions, ot from any other
svm
due by Parishad/Kshcttra Samiti to t
ie contractor whether under this’ cont
ract
or otherwise.
T SR ST A, 1A, 1985 57
(2) Parishad/Kshettra Samiti shall not })c bound to c:;:;csAlfl aer)l();eclt:\::
i made against it under sub-section (i) of section 12 of the sa e Pml:l o § 3 the written request of the contractor and upon l‘us giving d(;( o liad
E Kshettra Samiti full security for all costs for which pan§ha /Kshet miti
might become liable in consequence of contesting the claim.
Clause 32—Notwithstanding anything stipulated in the aforesaid clauses,
Parishad/Kshettra Samiti shall have power to retain any s\m) .d.\lt"lo lthe‘toln-
tractor and set off all claims against him (them) whether arising lg“bol the particular contract or out of any other transaction or contract hel y him/ - them alone of in partnership with others.
. FORM NO. W-4
Tt - (See RULE 27)
‘i Register of accepted contracts
:
. a4 Name Estimated Date of Date of Date of Persons Reference Reference Authority L of amount approval issue receipt. receiving to the containing accepting - g Project of of notice of tender scaled file where the tender
comparative recom-
statement mendation
of tenders of engineer
has been resnonsible ny |
placed - for ct
execution % he
of work _
; tender calling tender
o i form tender ®
7 8 9
ate %
= .
ich
vith
«
hall « °
:nts .
iject
" or N
;_‘:; Reference Register Date of -Date of Extension—Extract of time rate 3 : & regarding no. of commen- com- S o —————Date of Name Remarks reasons the cement pletion Reason By whom Amount record- of - tage for not contract of work of recom- involved ing officer — accepting extension mcndc_d 'Nl{mber comple- prepar- 085, “the lower period of sanction- ofitems tion ing tender extension ing - report . comple-
: authority tion ~
report.
10 11 1% 13 14 15 16 17 18 19
3 of 3 R =
58 : e s sraTTe T, 1 AT, 1985
Previous and next
Questions people ask
Is rule 7 of Uttar Pradesh (Area Panchayat) and (District Panchayat) Construction Works Rules, 1984 still in force?
No repeal of Uttar Pradesh (Area Panchayat) and (District Panchayat) Construction Works Rules, 1984 is recorded.